Skip to main content

First Phosphate Corp ends Drill Program plans Upcoming Resource Estimate at Bégin-Lamarche Project

--News Direct--

First Phosphate Corp CEO John Passalacqua Chief Geologist Gilles Laverdiere joined Steve Darling from Proactive to announce that all results from the drilling program at its Bégin-Lamarche project are now available. The 99-hole drill program, totaling 25,929 meters, has uncovered a significant high-quality igneous phosphate deposit. The drilling has shown continuous phosphate mineralization over a length of 2,400 meters, spread across three mineralized zones.

Laverdiere explained that a NI 43-101 resource estimate is currently underway and will be immediately followed by a Preliminary Economic Assessment. A total of 23 drill holes were completed in the Mountain Zone, totaling 5,023 meters. The Mountain Zone exhibits grades of more than 10% P2O5 over widths ranging from 7 meters to 99 meters. In the Southern Zone, drilling was conducted at 100-meter spaced sections over a length of 1,700 meters, with 57 drill holes totaling 15,219 meters.

Passalacqua says the company anticipates having the resource estimate completed in the coming months, marking a significant milestone in the project's development.

Contact Details

Proactive Investors

+1 604-688-8158

na-editorial@proactiveinvestors.com

View source version on newsdirect.com: https://newsdirect.com/news/first-phosphate-corp-ends-drill-program-plans-upcoming-resource-estimate-at-begin-lamarche-project-152116095

Recent Quotes

View More
Symbol Price Change (%)
AMZN  210.07
-0.25 (-0.12%)
AAPL  273.37
-4.75 (-1.71%)
AMD  216.09
+7.65 (3.67%)
BAC  56.48
-0.05 (-0.08%)
GOOG  325.35
+2.25 (0.70%)
META  675.30
+13.84 (2.09%)
MSFT  411.83
+10.69 (2.66%)
NVDA  191.81
+6.40 (3.45%)
ORCL  156.85
+14.03 (9.82%)
TSLA  419.68
+8.56 (2.08%)
Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the Privacy Policy and Terms Of Service.