IVANHOE MINES LTD.
(Translation of Registrant’s Name into English)
Suite 654 – 999 CANADA PLACE, VANCOUVER, BRITISH COLUMBIA V6C 3E1
(Address of Principal Executive Offices)
(Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.)
Form 20-F- o Form 40-F- þ
(Indicate by check mark whether the registrant by furnishing the information contained in this form is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934.)
Yes: o No: þ
(If “Yes” is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b): 82-                    .)
Enclosed:
Press release
 
 

 


 

SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
         
  IVANHOE MINES LTD.
 
 
Date: March 12, 2008  By:   /s Beverly A. Bartlett    
    BEVERLY A. BARTLETT   
    Vice President & Corporate Secretary   
 

 


 

(IVANHOE MINES NEW HORIZONS LOGO)
March 12, 2008
IVANHOE MINES REPORTS AN INITIAL 760 MILLION TONNE
INFERRED RESOURCE ESTIMATE FOR THE HERUGA COPPER,
GOLD AND MOLYBDENUM DEPOSIT IN MONGOLIA
New estimate adds 13.4 million ounces of gold and 8 billion pounds
of copper to Oyu Tolgoi’s total inferred resources
ULAANBAATAR, MONGOLIA — John Macken, President and CEO of Ivanhoe Mines Ltd., and Charles Forster, Ivanhoe’s Senior Vice President of Exploration, Mongolia, today announced the first resource estimate made by Ivanhoe Mines for the Heruga copper, gold and molybdenum deposit in southern Mongolia. The Heruga Deposit adjoins the southern boundary of Ivanhoe Mines’ Oyu Tolgoi copper and gold development project and lies within the Javkhlant license, which is part of the Entrée Gold-Ivanhoe Mines joint-venture agreement area.
The Heruga Deposit is estimated to contain an inferred resource of 760 million tonnes grading 0.48% copper, 0.55g/t gold and 142 ppm molybdenum, for a copper equivalent grade of 0.91%, using a 0.60% copper equivalent cut-off grade. Based on this initial estimate, the Heruga Deposit is estimated to contain at least eight billion pounds of copper and 13.4 million ounces of gold.
Using a higher cut-off grade of 1% copper equivalent, the Heruga deposit contains inferred resources of 210 million tonnes grading 0.57% copper, 0.97g/t gold and 145 ppm molybdenum, totalling 2.6 billion pounds of copper and 6.4 million ounces of gold.
Thirty-four drill holes (including daughter holes) on nine sections spaced at 150-to 300-metre intervals, for a combined strike length of 1,800-metres, have been used in the resource estimate. The deposit is open ended, with one rig currently drilling on the northern most section of the deposit, 150 metres south of the Oyu Tolgoi boundary, in significant copper/gold mineralization.
The Oyu Tolgoi structural trend, as currently defined, now has a total strike length in excess of 20 kilometres, encompassing Oyu Tolgoi in the centre and extensions onto the joint Entrée/Ivanhoe agreement area to the south and north. From the Heruga Deposit in the south, the trend now extends through the Oyu Tolgoi deposits to the Ulaan Khud, or Airport North Zone, located approximately 10 kilometres north-northeast of the Hugo Dummett Deposit. The total Oyu Tolgoi Project resources, including those contained on the adjoining Shivee Tolgoi and Javkhlant properties, are shown in Table 2.
“Heruga may allow for considerably more flexibility in developing the massive Oyu Tolgoi deposits, as well as a molybdenum circuit in the mill,” said Mr. Macken. “It also may provide the basis for a significant extension, over time, to the milling operations.”

 


 

Table 1. Heruga Inferred Resources March 2008
                                                                 
Cut-off   Tonnage   Cu   Au   Mo   CuEq   Contained Metal
CuEq %   1000’s (t)   %   g/t   ppm   %   Cu (’000 lb)   Au (oz) (‘000)   CuEq (’000 lb)
>1.50
    30,000       0.63       1.80       126       1.85       390,000       1,600       1,220,000  
>1.25
    80,000       0.59       1.39       124       1.54       970,000       3,400       2,710,000  
>1.00
    210,000       0.57       0.97       145       1.26       2,570,000       6,400       5,840,000  
>0.90
    300,000       0.55       0.84       150       1.16       3,600,000       8,000       7,700,000  
>0.80
    430,000       0.53       0.72       152       1.07       5,000,000       9,900       10,120,000  
>0.70
    590,000       0.51       0.62       148       0.98       6,590,000       11,700       12,750,000  
>0.60
    760,000       0.48       0.55       142       0.91       8,030,000       13,400       15,190,000  
>0.50
    930,000       0.45       0.50       135       0.84       9,220,000       14,900       17,270,000  
>0.40
    1,160,000       0.41       0.45       123       0.76       10,500,000       16,700       19,530,000  
>0.30
    1,420,000       0.37       0.40       111       0.69       11,670,000       18,200       21,530,000  
 
*   Copper Equivalent estimated using $1.35/lb copper, $650/oz gold and $10/lb molybdenum. The equivalence formula was calculated assuming that gold and molybdenum recovery was 91% and 72% of copper recovery respectively.1
Drill maps from the Heruga Deposit will be posted to Ivanhoe’s’ website at www.ivanhoemines.com and to Entrée’s web site at www.entreegold.com.
Discussion and Highlights of Mineral Resource Estimate and Recent Drilling
The current inferred resource estimate is based on a wide-spaced pattern that Ivanhoe believes has not fully delineated the higher grade gold-rich core. This may allow for a significant increase in gold-rich resources as infill drilling is undertaken.
On the southeast side of Heruga, hole EJD0026 was drilled 400 metres east of the defined mineral resource to test for a possible Hugo North-like zone that might have existed along the eastern margin of the deposit. While the hole did not intersect high-grade mineralization, it did encounter 300 metres grading 0.51 g/t gold, 0.33% copper and 102 ppm molybdenum, starting at 1,484 metres down hole. This included 104 metres at the top of the intersection grading 0.55 g/t gold, 0.56% copper and 233 ppm molybdenum, followed by 26 metres of dyke and 18 metres grading 1.24 g/t gold, 0.56% copper and 112 ppm molybdenum. The overall zone lies down dip, beyond the projection of the resource block model and, as a stand-alone intersection, was not included in this resource estimate. Infill drilling, which confirms grade continuity between the intersection and the resource block model, may significantly expand the inferred resource base in this area.
The deposit is open at both ends and, in part, on the southeastern side. EJD0028, which is drilling on the northern-most section, 4759500N, has intersected 24 metres starting at 1,118 metres down hole, grading 0.42 g/t gold, 0.71% copper and 306 ppm molybdenum. The remaining assays for the hole are pending; however, similar moderate-to-strong copper mineralization is reported in the hole to a depth of 1,550 metres. The hole is 200 metres east of EJD0025, which was included in the resource estimate, and had an intersection of 144 metres starting at 996 metres that averaged 0.20 g/t gold, 0.58% copper and 130 ppm molybdenum, followed by 20 metres of barren dyke and 54 metres of 0.15 g/t gold, 0.56% copper and 232 ppm molybdenum. The West Bor Tolgoi fault, which defines the western

2


 

limit of the currently defined deposit, was intersected at the base of the 52-metre interval. The East Bor Tolgoi fault, which defines the eastern limit of the deposit on its northern end, is projected approximately 300 metres further east of the top of the EJD0028 interval reported above.
Extending Heruga northward, the Induced Polarization data, which have been a good indicator for the mineralization, suggest that the mineralized block between the two Bor Tolgoi faults could extend an additional 500 metres northeast onto the 100% Ivanhoe-owned Oyu Tolgoi mining license. Of even more interest, there are three northeast-trending, post mineral fault structures that cut across the northern end of the deposit. Ultimately, the deposit may extend approximately four kilometres further north to the southern end of the Southwest and South Oyu deposits, which abutted onto a similar aged, east-west fault referred to as the Solongo Fault. The IP shows a broad zone of increased chargeability along the four-kilometre trend.
Table 2: Total Oyu Tolgoi Project Resources March 2008(1)(2)
(based on a 0.60% copper equivalent cut-off)(3)
                                                                 
                                            Contained Metal(5)
Resource           Cu   Au   Mo   CuEq(4)   Cu   Au   CuEq(4)
Category   Tonnes   (%)   (g/t)   (ppm)   (%)   (‘000 lbs)   (ounces)   (‘000 lbs)
Measured
    101,590,000       0.64       1.10             1.34       1,430,000       3,590,000       3,000,000  
Indicated
    1,285,840,000       1.38       0.42             1.65       39,120,000       17,360,000       46,770,000  
Measured + Indicated
    1,387,430,000       1.33       0.47             1.63       40,680,000       20,970,000       49,860,000  
Inferred
    2,157,130,000       0.80       0.35       50       1.05       38,230,000       24,220,000       50,050,000  
 
Notes:    
 
(1)   Mineral resources are not mineral reserves until they have demonstrated economic viability based on a feasibility study or pre-feasibility study. Mineral resources are reported inclusive of mineral reserves.
 
(2)   This table includes estimated resources on Entrée Gold’s Hugo North Extension Deposit and the Heruga deposit. These Properties are owned By Entrée Gold but are subject to earn-in rights by IVN. The estimate includes indicated resources of 117,000,000 tonnes grading 1.8% copper and 0.61 g/t gold and inferred resources of 855,500,000 tonnes grading 0.53% copper and 0.52 g/t gold and a 142ppm Molybdenum at a 0.6% cut-off grade on the combined Hugo North Extension and Heruga Deposits.
 
(3)   The 0.6% CuEq cut-off has been used to enable comparison with previous disclosures.
 
(4)   CuEq has been calculated using assumed metal prices ($1.35/lb. for copper and $650/oz for gold and $10/lb for molybdenum); %CuEq. = CU+((AU*18.98)+(MO*0.01586))/29.76. Mo grades outside of Heruga are assumed to be zero for CuEq calculations
 
(5)   The contained gold and copper represent estimated contained metal in the ground and have not been adjusted for the metallurgical recoveries of gold and copper.
 
(6)   Mineral Resources for Heruga were estimated by Ivanhoe and independently verified by Scott Jackson of Quantitative Geoscience. Mineral Resources exclusive of Heruga (Southern Oyu and Hugo Dummett) were estimated by AMEC Americas Ltd. under the supervision of Dr. Harry M. Parker, P.Geo. AMEC has consented to be named in this press release.

3


 

Table 3: Recent Selected Assay Averages from Heruga drilling
                                                         
    From     To     Interval     Au     Cu     Mo     Cu Eq  
Hole Number   (m)     (m)     (m)     (g/t)     (%)     (ppm)     (%)  
EJD0024
    1252       1490       238       2.05       0.52       49       1.85  
 
including
    1280       1372       92       3.60       0.89       67       3.22  
 
    1554       1614       60       1.17       0.30       32       1.07  
overall
    1252       1614       362       1.59       0.41       40       1.44  
 
EJD0008A
    1132       1310       178       0.20       0.62       299       0.91  
 
    1382       1406       24       0.52       0.56       169       0.98  
 
    1424       1494       70       0.95       0.38       41       1.01  
 
    1584       1754       170       1.32       0.29       10       1.13  
Overall
    1132       1754       622       0.59       0.34       102       0.77  
 
EJD0025
    916       924       8       0.03       1.35       286       1.52  
 
    996       1140       144       0.20       0.58       130       0.78  
 
    1160       1214       54       0.15       0.56       232       0.78  
EJD0026
    1484       1588       104       0.55       0.56       233       1.04  
 
    1614       1632       18       1.24       0.56       112       1.41  
 
    1650       1684       34       0.79       0.31       39       0.84  
 
    1692       1740       48       0.71       0.31       53       0.79  
 
    1772       1784       12       0.92       0.38       45       0.98  
Overall
    1484       1784       300       0.51       0.33       102       0.71  
 
EJD0027
    852       998       146       0.25       0.70       234       0.98  
 
    1016       1282       266       0.38       0.63       285       1.02  
 
    1282       1390       108       1.26       0.66       53       1.49  
 
    1422       1438       16       1.10       0.36       9.4       1.06  
 
    1454       1660       206       0.96       0.36       19       0.98  
Overall
    852       1660       808       0.60       0.52       149       0.99  
 
Note 1: Cu Equivalent calculated for $1.35/lb copper, $650/oz gold and $10/lb molybdenum
Note 2: Previous Press Releases used $1.15/b copper, $500/oz gold and $10/lb molybdenum for calculating Cu Equivalents CuEq=Cu%+((Au g/t*18.98)+(Mo ppm*0.01586))/29.76
Quality Assurance and Quality Control
Charles Forster, P.Geo., Ivanhoe Mines’ Oyu Tolgoi Exploration Manager, Stephen Torr, P. Geo., Ivanhoe Mines’ Chief Resource Geologist, and Robert Cann, P.Geo., Entrée’s Vice-President, Exploration, all qualified persons as defined by NI 43-101, supervised the preparation of the information in this release.
John Vann, Principal and Director, and Scott Jackson, Principal and Director of Quantitative Group, of Perth, Australia, performed an independent audit at the Oyu Tolgoi site on

4


 

Ivanhoe’s exploration practices and resource estimation parameters and found them to be in line with industry best practices.
SGS Mongolia LLC prepares the split core at the project site and assays all samples at its facility in Ulaanbaatar, Mongolia. Ivanhoe’s QA/QC program is monitored by independent consultant Dr. Barry Smee, P.Geo., and managed on site by Dale Sketchley, M.Sc., P.Geo. In-house, matrix-matched copper-gold-molybdenum standards and blanks are inserted at the sample preparation lab on the project site to monitor the quality control of the assay data.
Ivanhoe Mines currently has a 60% participating interest in the Ivanhoe- Entrée joint venture, which covers approximately 40,000 hectares of Entrée’s 100%-owned Shivee Tolgoi property (which includes the Javkhlant license), adjacent to Ivanhoe’s Oyu Tolgoi property. Ivanhoe earned the 60% interest by completing more than US$27.5 million of aggregate earn-in expenditures on the joint-venture properties to date. Ivanhoe intends to continue incurring earn-in expenditures in accordance with the terms of the joint-venture agreement with a view to increasing its participating interest in the project. Subject to Ivanhoe spending a total of US$35 million on exploration and/or development on the joint-venture properties prior to November 2012, Ivanhoe will earn:
    an 80% participating interest in all minerals extracted below a sub-surface depth of 560 metres on the optioned property; and
 
    a 70% participating interest in all minerals extracted from surface to a depth of 560 metres.
Ivanhoe also owns approximately 15% of the outstanding shares of Entrée Gold (TSX:ETG; AMEX:EGI). Ivanhoe’s strategic partner in the development of the Oyu Tolgoi Project, Rio Tinto, owns approximately 16% of the outstanding shares of Entrée Gold.
Ivanhoe Mines shares are listed on the Toronto, New York and NASDAQ stock exchanges under the symbol IVN.
Information contacts
Ivanhoe Mines Investor Relations: Bill Trenaman; Media: Bob Williamson +1.604.688.5755
Forward-Looking Statements — This news release contains forward-looking statements. Forward-looking statements are statements which relate to future events. In some cases, you can identify forward-looking statements by terminology such as “may”, “should”, “expects”, “plans”, “anticipates”, “believes”, “estimates”, “predicts”, “potential” or “continue” or the negative of these terms or other comparable terminology. These statements are only predictions and involve known and unknown risks, uncertainties and other factors that may cause our or our industry’s actual results, levels of activity, performance or achievements to be materially different from any future results, levels of activity, performance or achievements expressed or implied by these forward-looking statements. While these forward-looking statements, and any assumptions upon which they are based, are made in good faith and reflect our current judgment regarding the direction of our business, actual results will almost always vary, sometimes materially, from any estimates, predictions, projections, assumptions or other future performance suggested herein. Readers are referred to the sections entitled “Risk Factors” in Ivanhoe Mines’ periodic filings with Canadian and US Securities Commissions.