Form 10Q June 30, 2006
 
UNITED STATES SECURITIES AND EXCHANGE COMMISSION
Washington, D. C. 20549

FORM 10-Q
(Mark One)
[X] QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE
SECURITIES EXCHANGE ACT OF 1934

For the quarterly period ended June 30, 2006

OR

[ ] TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE
SECURITIES EXCHANGE ACT OF 1934

For the transition period from
 
to
 

Commission
Registrant; State of Incorporation;
I.R.S. Employer
File Number
Address; and Telephone Number
Identification No.
 
 
 
333-21011
FIRSTENERGY CORP.
34-1843785
 
(An Ohio Corporation)
 
 
76 South Main Street
 
 
Akron, OH 44308
 
 
Telephone (800)736-3402
 
 
 
 
1-2578
OHIO EDISON COMPANY
34-0437786
 
(An Ohio Corporation)
 
 
c/o FirstEnergy Corp.
 
 
76 South Main Street
 
 
Akron, OH 44308
 
 
Telephone (800)736-3402
 
 
 
 
1-2323
THE CLEVELAND ELECTRIC ILLUMINATING COMPANY
34-0150020
 
(An Ohio Corporation)
 
 
c/o FirstEnergy Corp.
 
 
76 South Main Street
 
 
Akron, OH 44308
 
 
Telephone (800)736-3402
 
 
 
 
1-3583
THE TOLEDO EDISON COMPANY
34-4375005
 
(An Ohio Corporation)
 
 
c/o FirstEnergy Corp.
 
 
76 South Main Street
 
 
Akron, OH 44308
 
 
Telephone (800)736-3402
 
 
 
 
1-3491
PENNSYLVANIA POWER COMPANY
25-0718810
 
(A Pennsylvania Corporation)
 
 
c/o FirstEnergy Corp.
 
 
76 South Main Street
 
 
Akron, OH 44308
 
 
Telephone (800)736-3402
 
 
 
 
1-3141
JERSEY CENTRAL POWER & LIGHT COMPANY
21-0485010
 
(A New Jersey Corporation)
 
 
c/o FirstEnergy Corp.
 
 
76 South Main Street
 
 
Akron, OH 44308
 
 
Telephone (800)736-3402
 
 
 
 
1-446
METROPOLITAN EDISON COMPANY
23-0870160
 
(A Pennsylvania Corporation)
 
 
c/o FirstEnergy Corp.
 
 
76 South Main Street
 
 
Akron, OH 44308
 
 
Telephone (800)736-3402
 
 
 
 
1-3522
PENNSYLVANIA ELECTRIC COMPANY
25-0718085
 
(A Pennsylvania Corporation)
 
 
c/o FirstEnergy Corp.
 
 
76 South Main Street
 
 
Akron, OH 44308
 
 
Telephone (800)736-3402
 



Indicate by check mark whether each of the registrants (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.

Yes (X) No (  )

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, or a non-accelerated filer. See definition of "accelerated filer and large accelerated filer" in Rule 12b-2 of the Exchange Act.

Large Accelerated Filer (X)
FirstEnergy Corp.
Accelerated Filer ( )
N/A
Non-accelerated Filer (X)
 
Ohio Edison Company, Pennsylvania Power Company, The Cleveland Electric Illuminating Company, The Toledo Edison Company, Jersey Central Power & Light Company, Metropolitan Edison Company, and Pennsylvania Electric Company

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Act).

Yes ( ) No (X)

Indicate the number of shares outstanding of each of the issuer's classes of common stock, as of the latest practicable date:

 
OUTSTANDING
CLASS
AS OF AUGUST 7, 2006
FirstEnergy Corp., $.10 par value
329,836,276
Ohio Edison Company, no par value
80
The Cleveland Electric Illuminating Company, no par value
79,590,689
The Toledo Edison Company, $5 par value
39,133,887
Pennsylvania Power Company, $30 par value
6,290,000
Jersey Central Power & Light Company, $10 par value
15,371,270
Metropolitan Edison Company, no par value
859,500
Pennsylvania Electric Company, $20 par value
5,290,596

FirstEnergy Corp. is the sole holder of Ohio Edison Company, The Cleveland Electric Illuminating Company, The Toledo Edison Company, Jersey Central Power & Light Company, Metropolitan Edison Company and Pennsylvania Electric Company common stock. Ohio Edison Company is the sole holder of Pennsylvania Power Company common stock.

This combined Form 10-Q is separately filed by FirstEnergy Corp., Ohio Edison Company, Pennsylvania Power Company, The Cleveland Electric Illuminating Company, The Toledo Edison Company, Jersey Central Power & Light Company, Metropolitan Edison Company and Pennsylvania Electric Company. Information contained herein relating to any individual registrant is filed by such registrant on its own behalf. No registrant makes any representation as to information relating to any other registrant, except that information relating to any of the FirstEnergy subsidiary registrants is also attributed to FirstEnergy Corp.
 

   
This Form 10-Q includes forward-looking statements based on information currently available to management. Such statements are subject to certain risks and uncertainties. These statements typically contain, but are not limited to, the terms "anticipate," "potential," "expect," "believe," "estimate" and similar words. Actual results may differ materially due to the speed and nature of increased competition and deregulation in the electric utility industry, economic or weather conditions affecting future sales and margins, changes in markets for energy services, changing energy and commodity market prices, replacement power costs being higher than anticipated or inadequately hedged, the continued ability of FirstEnergy Corp.’s regulated utilities to collect transition and other charges or to recover increased transmission costs, maintenance costs being higher than anticipated, legislative and regulatory changes (including revised environmental requirements), and the legal and regulatory changes resulting from the implementation of the Energy Policy Act of 2005 (including, but not limited to, the repeal of the Public Utility Holding Company Act of 1935), the uncertainty of the timing and amounts of the capital expenditures needed to, among other things, implement the Air Quality Compliance Plan (including that such amounts could be higher than anticipated) or levels of emission reductions related to the Consent Decree resolving the New Source Review litigation, adverse regulatory or legal decisions and outcomes (including, but not limited to, the revocation of necessary licenses or operating permits, fines or other enforcement actions and remedies) of governmental investigations and oversight, including by the Securities and Exchange Commission, the United States Attorney’s Office, the Nuclear Regulatory Commission and the various state public utility commissions as disclosed in the registrants’ Securities and Exchange Commission filings, generally, and with respect to the Davis-Besse Nuclear Power Station outage and heightened scrutiny at the Perry Nuclear Power Plant in particular, the timing and outcome of various proceedings before the Public Utilities Commission of Ohio (including, but not limited to, the successful resolution of the issues remanded to the PUCO by the Ohio Supreme Court regarding the RSP) and the Pennsylvania Public Utility Commission, including the transition rate plan filings for Met-Ed and Penelec, the continuing availability and operation of generating units, the ability of generating units to continue to operate at, or near full capacity, the inability to accomplish or realize anticipated benefits from strategic goals (including employee workforce initiatives), the anticipated benefits from voluntary pension plan contributions, the ability to improve electric commodity margins and to experience growth in the distribution business, the ability to access the public securities and other capital markets and the cost of such capital, the outcome, cost and other effects of present and potential legal and administrative proceedings and claims related to the August 14, 2003 regional power outages, the successful implementation of the share repurchase program approved by the Board of Directors in June 2006, the risks and other factors discussed from time to time in the registrants’ Securities and Exchange Commission filings, including their annual report on Form 10-K for the year ended December 31, 2005, and other similar factors. A security rating is not a recommendation to buy, sell or hold securities and it may be subject to revision or withdrawal at any time by the credit rating agency. The registrants expressly disclaim any current intention to update any forward-looking statements contained herein as a result of new information, future events, or otherwise.
 





TABLE OF CONTENTS



   
Pages
Glossary of Terms
iii-v
     
Part I. Financial Information
 
     
Items 1. and 2. - Financial Statements and Management’s Discussion and Analysis of  Financial Condition and Results of Operations.
 
     
 
Notes to Consolidated Financial Statements
1-26
     
FirstEnergy Corp.
 
     
 
Consolidated Statements of Income
27
 
Consolidated Statements of Comprehensive Income
28
 
Consolidated Balance Sheets
29
 
Consolidated Statements of Cash Flows
30
 
Report of Independent Registered Public Accounting Firm
31
 
Management's Discussion and Analysis of Results of Operations and
32-70
 
Financial Condition
 
     
Ohio Edison Company
 
     
 
Consolidated Statements of Income and Comprehensive Income
71
 
Consolidated Balance Sheets
72
 
Consolidated Statements of Cash Flows
73
 
Report of Independent Registered Public Accounting Firm
74
 
Management's Discussion and Analysis of Results of Operations and
75-87
 
Financial Condition
 
     
The Cleveland Electric Illuminating Company
 
     
 
Consolidated Statements of Income and Comprehensive Income
88
 
Consolidated Balance Sheets
89
 
Consolidated Statements of Cash Flows
90
 
Report of Independent Registered Public Accounting Firm
91
 
Management's Discussion and Analysis of Results of Operations and
92-102
 
Financial Condition
 
     
The Toledo Edison Company
 
     
 
Consolidated Statements of Income and Comprehensive Income
103
 
Consolidated Balance Sheets
104
 
Consolidated Statements of Cash Flows
105
 
Report of Independent Registered Public Accounting Firm
106
 
Management's Discussion and Analysis of Results of Operations and
107-118
 
Financial Condition
 
     
Pennsylvania Power Company
 
     
 
Consolidated Statements of Income
119
 
Consolidated Balance Sheets
120
 
Consolidated Statements of Cash Flows
121
 
Report of Independent Registered Public Accounting Firm
122
 
Management's Discussion and Analysis of Results of Operations and
123-130
 
Financial Condition
 
 
 
i

 

TABLE OF CONTENTS (Cont'd)


   
Pages
     
Jersey Central Power & Light Company
 
     
 
Consolidated Statements of Income and Comprehensive Income
131
 
Consolidated Balance Sheets
132
 
Consolidated Statements of Cash Flows
133
 
Report of Independent Registered Public Accounting Firm
134
 
Management's Discussion and Analysis of Results of Operations and
135-143
 
Financial Condition
 
     
Metropolitan Edison Company
 
     
 
Consolidated Statements of Income and Comprehensive Income
144
 
Consolidated Balance Sheets
145
 
Consolidated Statements of Cash Flows
146
 
Report of Independent Registered Public Accounting Firm
147
 
Management's Discussion and Analysis of Results of Operations and
148-157
 
Financial Condition
 
     
Pennsylvania Electric Company
 
     
 
Consolidated Statements of Income and Comprehensive Income
158
 
Consolidated Balance Sheets
159
 
Consolidated Statements of Cash Flows
160
 
Report of Independent Registered Public Accounting Firm
161
 
Management's Discussion and Analysis of Results of Operations and
162-170
 
Financial Condition
 
     
Item 3. Quantitative and Qualitative Disclosures About Market Risk.
171
     
Item 4. Controls and Procedures.
171
     
Part II. Other Information
 
     
Item 1. Legal Proceedings.
172
     
Item 1A. Risk Factors.
172
   
Item 2. Unregistered Sales of Equity Securities and Use of Proceeds.
172
   
Item 4. Submission of Matters to a Vote of Security Holders.
172
     
Item 6. Exhibits.
173-174




ii


GLOSSARY OF TERMS

The following abbreviations and acronyms are used in this report to identify FirstEnergy Corp. and its current and former subsidiaries:

ATSI
American Transmission Systems, Inc., owns and operates transmission facilities
CEI
The Cleveland Electric Illuminating Company, an Ohio electric utility operating subsidiary
Centerior
Centerior Energy Corporation, former parent of CEI and TE, which merged with OE to form FirstEnergy on November 8, 1997
CFC
Centerior Funding Corporation, a wholly owned finance subsidiary of CEI
Companies
OE, CEI, TE, Penn, JCP&L, Met-Ed and Penelec
FENOC
FirstEnergy Nuclear Operating Company, operates nuclear generating facilities
FES
FirstEnergy Solutions Corp., provides energy-related products and services
FESC
FirstEnergy Service Company, provides legal, financial, and other corporate support services
FGCO
FirstEnergy Generation Corp., owns and operates non-nuclear generating facilities
FirstCom
First Communications, LLC, provides local and long-distance telephone service
FirstEnergy
FirstEnergy Corp., a public utility holding company
FSG
FirstEnergy Facilities Services Group, LLC, the parent company of several heating, ventilation,
air conditioning and energy management companies
GPU
GPU, Inc., former parent of JCP&L, Met-Ed and Penelec, which merged with FirstEnergy on
November 7, 2001
JCP&L
Jersey Central Power & Light Company, a New Jersey electric utility operating subsidiary
JCP&L Transition
JCP&L Transition Funding LLC, a Delaware limited liability company and issuer of transition bonds
JCP&L Transition Funding II
JCP&L Transition Funding II LLC, a Delaware limited liability company and issuer of transition bonds
Met-Ed
Metropolitan Edison Company, a Pennsylvania electric utility operating subsidiary
MYR
MYR Group, Inc., a utility infrastructure construction service company
NGC
FirstEnergy Nuclear Generation Corp., owns nuclear generating facilities
OE
Ohio Edison Company, an Ohio electric utility operating subsidiary
OE Companies
OE and Penn
Ohio Companies
CEI, OE and TE
Penelec
Pennsylvania Electric Company, a Pennsylvania electric utility operating subsidiary
Penn
Pennsylvania Power Company, a Pennsylvania electric utility operating subsidiary of OE
PNBV
PNBV Capital Trust, a special purpose entity created by OE in 1996
Shippingport
Shippingport Capital Trust, a special purpose entity created by CEI and TE in 1997
TE
The Toledo Edison Company, an Ohio electric utility operating subsidiary
TEBSA
Termobarranquilla S.A., Empresa de Servicios Publicos
 
 
The following abbreviations and acronyms are used to identify frequently used terms in this report:
 
 
ALJ
Administrative Law Judge
AOCL
Accumulated Other Comprehensive Loss
APB
Accounting Principles Board
APB 25
APB Opinion No. 25, "Accounting for Stock Issued to Employees"
APB 29
APB Opinion No. 29, "Accounting for Nonmonetary Transactions"
ARB
Accounting Research Bulletin
ARB 43
ARB No. 43, "Restatement and Revision of Accounting Research Bulletins"
ARO
Asset Retirement Obligation
B&W
Babcock & Wilcox Company
BGS
Basic Generation Service
BTU
British Thermal Unit
CAIDI
Customer Average Interruption Duration Index
CAIR
Clean Air Interstate Rule
CAL
Confirmatory Action Letter
CAMR
Clean Air Mercury Rule
CBP
Competitive Bid Process
CIEP
Commercial Industrial Energy Price
CO2
Carbon Dioxide
CTC
Competitive Transition Charge
DCPD
Deferred Compensation Plan for Outside Directors
DIG C20
Derivatives Implementation Group Issue No. C20, “Scope Exceptions: Interpretations of the
Meaning of Not Clearly and Closely Related in Paragraph 10(b) regarding Contracts with a
Price Adjustment Feature”
DOJ
United States Department of Justice

iii


GLOSSARY OF TERMS, Cont'd.


DRA
Division of the Ratepayer Advocate
ECAR
East Central Area Reliability Coordination Agreement
EDCP
Executive Deferred Compensation Plan
EITF
Emerging Issues Task Force
EITF 04-13
EITF Issue No. 04-13, “Accounting for Purchases and Sales of Inventory with the Same Counterparty"
EPA
Environmental Protection Agency
EPACT
Energy Policy Act of 2005
ERO
Electric Reliability Organization
ESOP
Employee Stock Ownership Plan
FASB
Financial Accounting Standards Board
FERC
Federal Energy Regulatory Commission
FIN
FASB Interpretation
FIN 46(R)
FIN 46 (revised December 2003), "Consolidation of Variable Interest Entities"
FIN 46(R)-6
FIN 46(R)-6, “Determining the Variability to be Considered in Applying FASB interpretation No. 46(R)”
FIN 47
FIN 47, "Accounting for Conditional Asset Retirement Obligations - an interpretation of FASB Statement No. 143"
FIN 48
FIN 48, “Accounting for Uncertainty in Income Taxes - an interpretation of FASB Statement No.109”
FMB
First Mortgage Bonds
FSP
FASB Staff Position
GAAP
Accounting Principles Generally Accepted in the United States
GCAF
Generation Charge Adjustment Factor
GHG
Greenhouse Gases
KWH
Kilowatt-hours
LOC
Letter of Credit
LTIP
Long-Term Incentive Program
MEIUG
Met-Ed Industrial Users Group
MISO
Midwest Independent Transmission System Operator, Inc.
Moody’s
Moody’s Investors Service
MOU
Memorandum of Understanding
MTC
Market Transition Charge
MW
Megawatts
NAAQS
National Ambient Air Quality Standards
NERC
North American Electric Reliability Council
NJBPU
New Jersey Board of Public Utilities
NOAC
Northwest Ohio Aggregation Coalition
NOPR
Notice of Proposed Rulemaking
NOV
Notices of Violation
NOX
Nitrogen Oxide
NRC
Nuclear Regulatory Commission
NUG
Non-Utility Generation
NUGC
Non-Utility Generation Charge
OCA
Office of Consumer Advocate
OCC
Office of the Ohio Consumers' Counsel
OCI
Other Comprehensive Income
OPEB
Other Post-Employment Benefits
OSBA
Office of Small Business Advocate
OTS
Office of Trial Staff
PaDEP
Pennsylvania Department of Environmental Protection
PCAOB
Public Company Accounting Oversight Board
PICA
Penelec Industrial Customer Association
PJM
PJM Interconnection L. L. C.
PLR
Provider of Last Resort
PPUC
Pennsylvania Public Utility Commission
PRP
Potentially Responsible Party
PUCO
Public Utilities Commission of Ohio
PUHCA
Public Utility Holding Company Act of 1935
RCP
Rate Certainty Plan
RFP
Request for Proposal
RSP
Rate Stabilization Plan
RTC
Regulatory Transition Charge
RTO
Regional Transmission Organization
RTOR
Through and Out Rates
S&P
Standard & Poor’s Ratings Service
SAIFI
System Average Interruption Frequency Index
SBC
Societal Benefits Charge
SEC
U.S. Securities and Exchange Commission
SECA
Seams Elimination Cost Adjustment
SFAS
Statement of Financial Accounting Standards
SFAS 123
SFAS No. 123, "Accounting for Stock-Based Compensation"
SFAS 123(R)
SFAS No. 123(R), "Share-Based Payment"
SFAS 133
SFAS No. 133, “Accounting for Derivative Instruments and Hedging Activities”
SFAS 140
SFAS No. 140, “Accounting for Transfers and Servicing of Financial Assets and
Extinguishment of Liabilities”
SFAS 143
SFAS No. 143, "Accounting for Asset Retirement Obligations"
SFAS 144
SFAS No. 144, "Accounting for the Impairment or Disposal of Long-Lived Assets"
SO2
Sulfur Dioxide
SRM
Special Reliablity Master
TBC
Transition Bond Charge
TMI-2
Three Mile Island Unit 2
VIE
Variable Interest Entity
VMEP
Vegetation Management Enhancement Project


iv

 


PART I. FINANCIAL INFORMATION

FIRSTENERGY CORP. AND SUBSIDIARIES
OHIO EDISON COMPANY AND SUBSIDIARIES
THE CLEVELAND ELECTRIC ILLUMINATING COMPANY AND SUBSIDIARIES
THE TOLEDO EDISON COMPANY AND SUBSIDIARY
PENNSYLVANIA POWER COMPANY AND SUBSIDIARY
JERSEY CENTRAL POWER & LIGHT COMPANY AND SUBSIDIARIES
METROPOLITAN EDISON COMPANY AND SUBSIDIARIES
PENNSYLVANIA ELECTRIC COMPANY AND SUBSIDIARIES

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
(UNAUDITED)


1. - ORGANIZATION AND BASIS OF PRESENTATION

FirstEnergy’s principal business is the holding, directly or indirectly, of all of the outstanding common stock of its eight principal electric utility operating subsidiaries: OE, CEI, TE, Penn, ATSI, JCP&L, Met-Ed and Penelec. Penn is a wholly owned subsidiary of OE. FirstEnergy's consolidated financial statements also include its other principal subsidiaries: FENOC, FES and its subsidiary FGCO, NGC, FESC and FSG.

FirstEnergy and its subsidiaries follow GAAP and comply with the regulations, orders, policies and practices prescribed by the SEC, FERC and, as applicable, PUCO, PPUC and NJBPU. The preparation of financial statements in conformity with GAAP requires management to make periodic estimates and assumptions that affect the reported amounts of assets, liabilities, revenues and expenses and disclosure of contingent assets and liabilities. Actual results could differ from these estimates. The reported results of operations are not indicative of results of operations for any future period.

These statements should be read in conjunction with the financial statements and notes included in the combined Annual Report on Form 10-K for the year ended December 31, 2005 for FirstEnergy and the Companies. The consolidated unaudited financial statements of FirstEnergy and each of the Companies reflect all normal recurring adjustments that, in the opinion of management, are necessary to fairly present results of operations for the interim periods. Certain businesses divested in the first and second quarters of 2005 have been classified as discontinued operations on the Consolidated Statements of Income (see Note 4). As discussed in Note 13, interim period segment reporting in 2005 was reclassified to conform with the current year business segment organizations and operations.

FirstEnergy and its subsidiaries consolidate all majority-owned subsidiaries over which they exercise control and, when applicable, entities for which they have a controlling financial interest. Intercompany transactions and balances are eliminated in consolidation. FirstEnergy consolidates a VIE (see Note 9) when it is determined to be the VIE's primary beneficiary. Investments in nonconsolidated affiliates over which FirstEnergy and its subsidiaries have the ability to exercise significant influence, but not control, (20-50 percent owned companies, joint ventures and partnerships) are accounted for under the equity method. Under the equity method, the interest in the entity is reported as an investment in the Consolidated Balance Sheet and the percentage share of the entity’s earnings is reported in the Consolidated Statement of Income. Certain prior year amounts have been reclassified to conform to the current presentation.

FirstEnergy's and the Companies' independent registered public accounting firm has performed reviews of, and issued reports on, these consolidated interim financial statements in accordance with standards established by the PCAOB. Pursuant to Rule 436(c) under the Securities Act of 1933, their reports of those reviews should not be considered a report within the meaning of Section 7 and 11 of that Act, and the independent registered public accounting firm’s liability under Section 11 does not extend to them.

2. - EARNINGS PER SHARE

Basic earnings per share are computed using the weighted average of actual common shares outstanding during the respective period as the denominator. The denominator for diluted earnings per share reflects the weighted average of common shares outstanding plus the potential additional common shares that could result if dilutive securities and other agreements to issue common stock were exercised. The following table reconciles the computation of basic and diluted earnings per share of common stock before discontinued operations:

1



 
 
Three Months Ended
 
Six Months Ended
 
 
 
June 30,
 
June 30,
 
Reconciliation of Basic and Diluted Earnings per Share
 
2006
 
2005
 
2006
 
2005
 
 
 
(In millions, except per share amounts)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Income Before Discontinued Operations
 
$
304
 
$
179
 
$
525
 
$
320
 
Less: Redemption premium on subsidiary preferred stock
 
 
(3
)
 
-
 
 
(3
)
 
-
 
Earnings on Common Stock Before Discontinued Operations
 
$
301
 
$
179
 
$
522
 
$
320
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Weighted Average Shares of Common Stock Outstanding:
 
 
 
 
 
 
 
 
 
 
 
 
 
Denominator for basic earnings per share
 
 
328
 
 
328
 
 
328
 
 
328
 
Assumed exercise of dilutive stock options and awards
 
 
2
 
 
2
 
 
2
 
 
2
 
Denominator for diluted earnings per share
 
 
330
 
 
330
 
 
330
 
 
330
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Earnings Before Discontinued Operations per Common Share:
 
 
 
 
 
 
 
 
 
 
 
 
 
Basic
 
$
0.92
 
$
0.54
 
$
1.59
 
$
0.98
 
Diluted
 
$
0.91
 
$
0.54
 
$
1.58
 
$
0.97
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

3. - GOODWILL

FirstEnergy's goodwill primarily relates to its regulated services segment. In the six months ended June 30, 2006, FirstEnergy adjusted goodwill related to the divestiture of a non-core asset (62% interest in MYR), a successful tax claim relating to the former Centerior companies, and an adjustment to the former GPU companies due to the realization of a tax benefit that had been reserved in purchase accounting. Adjustments to goodwill in the second quarter of 2006 were immaterial. The following table reconciles changes to goodwill for the six months ended June 30, 2006.

Goodwill Reconciliation
 
FirstEnergy
 
CEI
 
TE
 
JCP&L
 
Met-Ed
 
Penelec
 
 
 
(In millions)
 
Balance as of January 1, 2006
 
$
6,010
 
$
1,689
 
$
501
 
$
1,986
 
$
864
 
$
882
 
Non-core assets sale
 
 
(53
)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Adjustments related to Centerior acquisition
 
 
(1
)
 
(1
)
 
 
 
 
 
 
 
 
 
 
 
 
Adjustments related to GPU acquisition
 
 
(16
)
 
 
 
 
 
 
 
(8
)
 
(4
)
 
(4
)
Balance as of June 30, 2006
 
$
5,940
 
$
1,688
 
$
501
 
$
1,978
 
$
860
 
$
878
 

4. - DIVESTITURES AND DISCONTINUED OPERATIONS

In March 2006, FirstEnergy sold 60% of its interest in MYR for an after-tax gain of $0.2 million. In June 2006, FirstEnergy sold an additional 1.67% interest. As a result of the March sale, FirstEnergy deconsolidated MYR in the first quarter of 2006 and accounts for its remaining 38.33% interest under the equity method.
 
 In March 2005, FirstEnergy sold 51% of its interest in FirstCom for an after-tax gain of $4 million. FirstEnergy accounts for its remaining 31.85% interest in FirstCom under the equity method.
 
During the first six months of 2005, FirstEnergy sold three FSG subsidiaries (Cranston, Elliott-Lewis and Spectrum), an MYR subsidiary (Power Piping) and FES' retail natural gas business, resulting in aggregate after-tax gains of $17 million. The remaining FSG subsidiaries continue to be actively marketed and qualify as assets held for sale in accordance with SFAS 144 because FirstEnergy anticipates that the transfer of these remaining FSG assets, with a net carrying value of $48 million as of June 30, 2006, will qualify for recognition as completed sales within one year. As of June 30, 2006, the FSG subsidiaries classified as held for sale did not meet the criteria for discontinued operations. The carrying amounts of FSG's assets and liabilities held for sale are not material and have not been classified as assets held for sale on FirstEnergy's Consolidated Balance Sheets. See Note 13 for FSG's segment financial information.

Net results (including the gains on sales of assets discussed above) for Cranston, Elliott-Lewis, Power Piping and FES' retail natural gas business of $(1) million and $18 million for the three months and six months ended June 30, 2005, respectively, are reported as discontinued operations on FirstEnergy's Consolidated Statements of Income. Pre-tax operating results for these entities were $(2) million and $2 million for the three months and six months ended June 30, 2005, respectively. Revenues associated with discontinued operations for the three months and six months ended June 30, 2005 were $11 million and $206 million, respectively. The following table summarizes the sources of income from discontinued operations for the three months and six months ended June 30, 2005:

2



 
 
Three Months
 
 
Six Months
 
 
 
(In millions)
 
Discontinued Operations (Net of tax)
 
 
 
 
 
 
Gain on sale:
 
 
 
 
 
 
Natural gas business
 
$
-
 
$
5
 
FSG and MYR subsidiaries
 
 
-
 
 
12
 
Reclassification of operating income (loss)
 
 
(1
)
 
1
 
Total
 
$
(1
)
$
18
 

5. - DERIVATIVE INSTRUMENTS
 
FirstEnergy is exposed to financial risks resulting from the fluctuation of interest rates and commodity prices, including prices for electricity, natural gas, coal and energy transmission. To manage the volatility relating to these exposures, FirstEnergy uses a variety of non-derivative and derivative instruments, including forward contracts, options, futures contracts and swaps. The derivatives are used principally for hedging purposes. FirstEnergy’s Risk Policy Committee, comprised of members of senior management, provides general management oversight to risk management activities. The Committee is responsible for promoting the effective design and implementation of sound risk management programs and oversees compliance with corporate risk management policies and established risk management practices.
 
FirstEnergy accounts for derivative instruments on its Consolidated Balance Sheet at their fair value unless they meet the normal purchase and normal sales exception criterion. Derivatives that meet that criterion are accounted for on the accrual basis. The changes in the fair value of derivative instruments that do not meet the normal purchase and sales criterion are recorded in current earnings, in AOCL, or as part of the value of the hedged item, depending on whether or not it is designated as part of a hedge transaction, the nature of the hedge transaction and hedge effectiveness.
 
FirstEnergy hedges anticipated transactions using cash flow hedges. Such transactions include hedges of anticipated electricity and natural gas purchases and anticipated interest payments associated with future debt issues. The effective portion of such hedges are initially recorded in equity as other comprehensive income or loss and are subsequently included in net income as the underlying hedged commodities are delivered or interest payments are made. Gains and losses from any ineffective portion of cash flow hedges are included directly in earnings.

The net deferred losses of $30 million included in AOCL as of June 30, 2006, for derivative hedging activity, as compared to the December 31, 2005 balance of $78 million of net deferred losses, resulted from a net $35 million decrease related to current hedging activity and a $13 million decrease due to net hedge losses included in earnings during the six months ended June 30, 2006. Approximately $9 million (after tax) of the net deferred losses on derivative instruments in AOCL as of June 30, 2006 is expected to be reclassified to earnings during the next twelve months as hedged transactions occur. The fair value of these derivative instruments fluctuate from period to period based on various market factors.

FirstEnergy has entered into swaps that have been designated as fair value hedges of fixed-rate, long-term debt issues to protect against the risk of changes in the fair value of fixed-rate debt instruments due to lower interest rates. Swap maturities, call options, fixed interest rates received, and interest payment dates match those of the underlying debt obligations. During the first six months of 2006, FirstEnergy unwound swaps with a total notional amount of $350 million for which it paid $1 million in cash. The losses will be recognized in earnings over the remaining maturity of each respective hedged security as increased interest expense. As of June 30, 2006, the aggregate notional value of interest rate swap agreements outstanding was $750 million.

During 2005 and the first six months of 2006, FirstEnergy entered into several forward starting swap agreements (forward swaps) in order to hedge a portion of the consolidated interest rate risk associated with the anticipated issuances of fixed-rate, long-term debt securities for one or more of its subsidiaries during 2006 - 2008 as outstanding debt matures. These derivatives are treated as cash flow hedges, protecting against the risk of changes in future interest payments resulting from changes in benchmark U.S. Treasury rates between the date of hedge inception and the date of the debt issuance. FirstEnergy revised the tenor and timing of its financing plan during the first six months of 2006. FirstEnergy terminated and revised its forward swaps, ultimately terminating swaps with an aggregate notional value of $600 million as its subsidiaries issued long term debt in the second quarter. As required by SFAS 133, FirstEnergy assessed the amount of ineffectiveness of the hedges at each termination. FirstEnergy received cash gains of $41 million, of which approximately $6 million ($4 million net of tax) was deemed ineffective and recognized in earnings in the first six months of 2006. The remaining gain deemed effective in the amount of approximately $35 million ($22 million net of tax) was recorded in other comprehensive income and will subsequently be recognized in earnings over the terms of the respective forward swaps. As of June 30, 2006, FirstEnergy had forward swaps with an aggregate notional amount of $550million and a long-term debt securities fair value of $29 million.

3




6. - STOCK BASED COMPENSATION

Effective January 1, 2006, FirstEnergy adopted SFAS 123(R), which requires the expensing of stock-based compensation. Under SFAS 123(R), all share-based compensation cost is measured at the grant date based on the fair value of the award, and is recognized as an expense over the employee’s requisite service period. FirstEnergy adopted the modified prospective method, under which compensation expense recognized in the second quarter and six months ended June 30, 2006 included the expense for all share-based payments granted prior to but not yet vested as of January 1, 2006. Results for prior periods were not restated.

Prior to the adoption of SFAS 123(R) on January, 1, 2006, FirstEnergy’s LTIP, EDCP, ESOP, and DCPD stock-based compensation programs were accounted for under the recognition and measurement principles of APB 25 and related interpretations. The LTIP includes four stock-based compensation programs - restricted stock, restricted stock units, stock options and performance shares.

Under APB 25, no compensation expense was reflected in net income for stock options as all options granted under those plans have exercise prices equal to the market value of the underlying common stock on the respective grant dates, resulting in substantially no intrinsic value. The pro forma effects on net income for stock options were instead disclosed in a footnote to the financial statements. Under APB 25 and SFAS 123(R) expense was recorded in the income statement for restricted stock, restricted stock units, performance shares and the EDCP and DCPD programs. No stock options have been granted since the third quarter of 2004. Consequently, the impact of adopting SFAS 123(R) was not material to FirstEnergy's net income and earnings per share in the second quarter and six months ended June 30, 2006. In the year of adoption, all disclosures prescribed by SFAS 123(R) are required to be included in both the quarterly Form 10-Q filings as well as the annual Form 10-K filing. However, due to the immaterial impact of the adoption of SFAS 123(R) on FirstEnergy's financial results, only condensed disclosure has been provided. Reference is made to FirstEnergy’s annual report on Form 10-K for the year ended December 31, 2005 for expanded annual disclosure.

The following table illustrates the effect on net income and earnings per share for the three months and six months ended June 30, 2005, as if FirstEnergy had adopted SFAS 123(R) as of January 1, 2005:

 
 
Three Months
 
Six Months
 
 
 
(In millions, except per share amounts)
 
 
 
 
 
 
 
 
 
Net Income, as reported
 
$
178
 
$
338
 
 
 
 
 
 
 
 
 
Add back compensation expense
 
 
 
 
 
 
 
reported in net income, net of tax (based on
 
 
 
 
 
 
 
APB 25)*
 
 
14
 
 
22
 
 
 
 
 
 
 
 
 
Deduct compensation expense based
 
 
 
 
 
 
 
upon estimated fair value, net of tax*
 
 
(17
)
 
(28
)
 
 
 
 
 
 
 
 
Pro forma net income
 
$
175
 
$
332
 
Earnings Per Share of Common Stock -
 
 
 
 
 
 
 
Basic
 
 
 
 
 
 
 
As Reported
 
$
0.54
 
$
1.03
 
ProForma
 
$
0.53
 
$
1.01
 
Diluted
 
 
 
 
 
 
 
As Reported
 
$
0.54
 
$
1.02
 
Pro Forma
 
$
0.53
 
$
1.01
 

* Includes restricted stock, restricted stock units, stock options, performance
shares, ESOP, EDCP and DCPD.

7. - ASSET RETIREMENT OBLIGATIONS

FirstEnergy has recognized applicable legal obligations under SFAS 143 for nuclear power plant decommissioning, reclamation of a sludge disposal pond and closure of two coal ash disposal sites. In addition, FirstEnergy has recognized conditional retirement obligations (primarily for asbestos remediation) in accordance with FIN 47, which was implemented on December 31, 2005. Had FIN 47 been applied in the six months ended June 30, 2005, the impact on earnings would have been immaterial.

4



The ARO liability of $1.2 billion as of June 30, 2006 primarily relates to the nuclear decommissioning of the Beaver Valley, Davis-Besse, Perry and TMI-2 nuclear generating facilities. The obligation to decommission these units was developed based on site specific studies performed by an independent engineer. FirstEnergy uses an expected cash flow approach to measure the fair value of the nuclear decommissioning ARO.
 
                   FirstEnergy maintains nuclear decommissioning trust funds that are legally restricted for purposes of settling the nuclear decommissioning ARO. As of June 30, 2006, the fair value of the decommissioning trust assets was $1.8 billion.

The following tables analyze changes to the ARO balances during the three months and six months ended June 30, 2006 and 2005, respectively.

Three Months Ended
 
FirstEnergy
 
OE
 
CEI
 
TE
 
Penn
 
JCP&L
 
Met-Ed
 
Penelec
 
 
 
(In millions)
 
ARO Reconciliation
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Balance, April 1, 2006
 
$
1,148
 
$
84
 
$
8
 
$
25
 
$
-
 
$
81
 
$
144
 
$
73
 
Liabilities incurred
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Liabilities settled
 
 
(6
)
 
-
 
 
(6
)
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Accretion
 
 
18
 
 
1
 
 
-
 
 
1
 
 
-
 
 
1
 
 
2
 
 
1
 
Revisions in estimated
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
cashflows
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Balance, June 30, 2006
 
$
1,160
 
$
85
 
$
2
 
$
26
 
$
-
 
$
82
 
$
146
 
$
74
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Balance, April 1, 2005
 
$
1,095
 
$
204
 
$
276
 
$
198
 
$
141
 
$
74
 
$
135
 
$
67
 
Liabilities incurred
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Liabilities settled
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Accretion
 
 
18
 
 
4
 
 
5
 
 
3
 
 
2
 
 
1
 
 
2
 
 
1
 
Revisions in estimated
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
cashflows
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Balance, June 30, 2005
 
$
1,113
 
$
208
 
$
281
 
$
201
 
$
143
 
$
75
 
$
137
 
$
68
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


Six Months Ended
 
FirstEnergy
 
OE
 
CEI
 
TE
 
Penn
 
JCP&L
 
Met-Ed
 
Penelec
 
 
 
(In millions)
 
ARO Reconciliation
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Balance, January 1, 2006
 
$
1,126
 
$
83
 
$
8
 
$
25
 
$
-
 
$
80
 
$
142
 
$
72
 
Liabilities incurred
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Liabilities settled
 
 
(6
)
 
-
 
 
(6
)
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Accretion
 
 
36
 
 
2
 
 
-
 
 
1
 
 
-
 
 
2
 
 
4
 
 
2
 
Revisions in estimated
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
cashflows
 
 
4
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Balance, June 30, 2006
 
$
1,160
 
$
85
 
$
2
 
$
26
 
$
-
 
$
82
 
$
146
 
$
74
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Balance, January 1, 2005
 
$
1,078
 
$
201
 
$
272
 
$
195
 
$
138
 
$
72
 
$
133
 
$
67
 
Liabilities incurred
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Liabilities settled
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Accretion
 
 
35
 
 
7
 
 
9
 
 
6
 
 
5
 
 
3
 
 
4
 
 
1
 
Revisions in estimated
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
cashflows
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Balance, June 30, 2005
 
$
1,113
 
$
208
 
$
281
 
$
201
 
$
143
 
$
75
 
$
137
 
$
68
 

8. - PENSION AND OTHER POSTRETIREMENT BENEFITS
 
                    FirstEnergy provides noncontributory defined benefit pension plans that cover substantially all of its employees. The trusteed plans provide defined benefits based on years of service and compensation levels. FirstEnergy also provides a minimum amount of noncontributory life insurance to retired employees in addition to optional contributory insurance. Health care benefits, which include certain employee contributions, deductibles and co-payments, are available upon retirement to employees hired prior to January 1, 2005, their dependents and, under certain circumstances, their survivors. FirstEnergy recognizes the expected cost of providing other postretirement benefits to employees, their beneficiaries and covered dependents from the time employees are hired until they become eligible to receive those benefits.

5



The components of FirstEnergy's net periodic pension and other postretirement benefit costs (including amounts capitalized) for the three months and six months ended June 30, 2006 and 2005 consisted of the following:

 
 
Three Months Ended
Six Months Ended
 
 
 
June 30,
 
June 30,
 
Pension Benefits
 
2006
 
2005
 
2006
 
2005
 
 
 
(In millions)
 
Service cost
 
$
21
 
$
19
 
$
41
 
$
38
 
Interest cost
 
 
66
 
 
64
 
 
133
 
 
128
 
Expected return on plan assets
 
 
(99
)
 
(86
)
 
(198
)
 
(173
)
Amortization of prior service cost
 
 
2
 
 
2
 
 
5
 
 
4
 
Recognized net actuarial loss
 
 
15
 
 
9
 
 
29
 
 
18
 
Net periodic cost
 
$
5
 
$
8
 
$
10
 
$
15
 

 
 
Three Months Ended
Six Months Ended
 
 
 
June 30,
 
June 30,
 
Other Postretirement Benefits
 
2006
 
2005
 
2006
 
2005
 
 
 
(In millions)
 
Service cost
 
$
9
 
$
10
 
$
17
 
$
20
 
Interest cost
 
 
26
 
 
27
 
 
52
 
 
55
 
Expected return on plan assets
 
 
(12
)
 
(11
)
 
(23
)
 
(22
)
Amortization of prior service cost
 
 
(19
)
 
(11
)
 
(37
)
 
(22
)
Recognized net actuarial loss
 
 
14
 
 
10
 
 
27
 
 
20
 
Net periodic cost
 
$
18
 
$
25
 
$
36
 
$
51
 

Pension and postretirement benefit obligations are allocated to FirstEnergy’s subsidiaries employing the plan participants. FirstEnergy’s subsidiaries capitalize employee benefits related to construction projects. The net periodic pension costs (credits) and net periodic postretirement benefit costs (including amounts capitalized) recognized by each of the Companies for the three months and six months ended June 30, 2006 and 2005 were as follows:

 
 
Three Months Ended
 
Six Months Ended
 
 
 
June 30,
 
June 30,
 
Pension Benefit Cost (Credit)
 
2006
 
2005
 
2006
 
2005
 
 
 
(In millions)
 
OE
 
$
(1.1
)
$
0.2
 
$
(2.1
)
$
0.4
 
Penn
 
 
(0.4
)
 
(0.2
)
 
(0.8
)
 
(0.4
)
CEI
 
 
1.0
 
 
0.3
 
 
1.9
 
 
0.7
 
TE
 
 
0.2
 
 
0.3
 
 
0.4
 
 
0.6
 
JCP&L
 
 
(1.4
)
 
(0.3
)
 
(2.7
)
 
(0.5
)
Met-Ed
 
 
(1.7
)
 
(1.1
)
 
(3.5
)
 
(2.2
)
Penelec
 
 
(1.3
)
 
(1.3
)
 
(2.7
)
 
(2.7
)
Other FirstEnergy subsidiaries
 
 
9.9
 
 
9.6
 
 
20.0
 
 
19.1
 
 
 
$
5.2
 
$
7.5
 
$
10.5
 
$
15.0
 

 
 
Three Months Ended
 
Six Months Ended
 
 
 
June 30,
 
June 30,
 
Other Postretirement Benefit Cost
 
2006
 
2005
 
2006
 
2005
 
 
 
(In millions)
 
OE
 
$
3.4
 
$
5.8
 
$
6.8
 
$
11.5
 
Penn
 
 
0.8
 
 
1.2
 
 
1.6
 
 
2.4
 
CEI
 
 
2.8
 
 
3.8
 
 
5.5
 
 
7.6
 
TE
 
 
2.0
 
 
2.2
 
 
4.0
 
 
4.3
 
JCP&L
 
 
0.6
 
 
1.5
 
 
1.2
 
 
4.2
 
Met-Ed
 
 
0.7
 
 
0.4
 
 
1.5
 
 
0.8
 
Penelec
 
 
1.8
 
 
2.0
 
 
3.6
 
 
4.0
 
Other FirstEnergy subsidiaries
 
 
6.1
 
 
8.1
 
 
12.1
 
 
16.2
 
 
 
$
18.2
 
$
25.0
 
$
36.3
 
$
51.0
 


6


9. - VARIABLE INTEREST ENTITIES
 
                   FIN 46R addresses the consolidation of VIEs, including special-purpose entities, that are not controlled through voting interests or in which the equity investors do not bear the entity's residual economic risks and rewards. FirstEnergy and its subsidiaries consolidate VIEs when they are determined to be the VIE's primary beneficiary as defined by FIN 46R.

Leases
 
                   FirstEnergy’s consolidated financial statements include PNBV and Shippingport, VIEs created in 1996 and 1997, respectively, to refinance debt originally issued in connection with sale and leaseback transactions. PNBV and Shippingport financial data are included in the consolidated financial statements of OE and CEI, respectively.
 
                   PNBV was established to purchase a portion of the lease obligation bonds issued in connection with OE’s 1987 sale and leaseback of its interests in the Perry Plant and Beaver Valley Unit 2. OE used debt and available funds to purchase the notes issued by PNBV. Ownership of PNBV includes a 3% equity interest by an unaffiliated third party and a 3% equity interest held by OES Ventures, a wholly owned subsidiary of OE. Shippingport was established to purchase all of the lease obligation bonds issued in connection with CEI’s and TE’s Bruce Mansfield Plant sale and leaseback transaction in 1987. CEI and TE used debt and available funds to purchase the notes issued by Shippingport.
 
                   OE, CEI and TE are exposed to losses under the applicable sale-leaseback agreements upon the occurrence of certain contingent events that each company considers unlikely to occur. OE, CEI and TE each have a maximum exposure to loss under these provisions of approximately $1 billion, which represents the net amount of casualty value payments upon the occurrence of specified casualty events that render the applicable plant worthless. Under the applicable sale-leaseback agreements, OE, CEI and TE have net minimum discounted lease payments of $640 million, $98 million and $498 million, respectively, that would not be payable if the casualty value payments are made.

Power Purchase Agreements
 
                   In accordance with FIN 46R, FirstEnergy evaluated its power purchase agreements and determined that certain NUG entities may be VIEs to the extent they own a plant that sells substantially all of its output to the Companies and the contract price for power is correlated with the plant’s variable costs of production. FirstEnergy, through its subsidiaries JCP&L, Met-Ed and Penelec, maintains approximately 30 long-term power purchase agreements with NUG entities. The agreements were entered into pursuant to the Public Utility Regulatory Policies Act of 1978. FirstEnergy was not involved in the creation of, and has no equity or debt invested in, these entities.
 
                   FirstEnergy has determined that for all but eight of these entities, neither JCP&L, Met-Ed nor Penelec have variable interests in the entities or the entities are governmental or not-for-profit organizations not within the scope of FIN 46R. JCP&L, Met-Ed or Penelec may hold variable interests in the remaining eight entities, which sell their output at variable prices that correlate to some extent with the operating costs of the plants. As required by FIN 46R, FirstEnergy periodically requests from these eight entities the information necessary to determine whether they are VIEs or whether JCP&L, Met-Ed or Penelec is the primary beneficiary. FirstEnergy has been unable to obtain the requested information, which in most cases was deemed by the requested entity to be proprietary. As such, FirstEnergy applied the scope exception that exempts enterprises unable to obtain the necessary information to evaluate entities under FIN 46R.

Since FirstEnergy has no equity or debt interests in the NUG entities, its maximum exposure to loss relates primarily to the above-market costs it incurs for power. FirstEnergy expects any above-market costs it incurs to be recovered from customers. As of June 30, 2006, the net above-market loss liability projected for these eight NUG agreements was $74 million. Purchased power costs from these entities during the three months and six months ended June 30, 2006 and 2005 are shown in the following table:
 
 
Three Months Ended
 
Six Months Ended
 
 
June 30,
 
June 30,
 
 
2006
 
2005
 
2006
 
2005
 
(In millions)
JCP&L
$
19
 
$
21
 
$
34
 
$
42
 
Met-Ed
 
16
 
 
14
 
 
33
 
 
30
 
Penelec
 
7
 
 
7
 
 
14
 
 
14
 
Total
$
42
 
$
42
 
$
81
 
$
86
 


7



Securitized Transition Bonds

The consolidated financial statements of FirstEnergy and JCP&L include the results of JCP&L Transition, a wholly owned limited liability company of JCP&L. In June 2002, JCP&L Transition sold $320 million of transition bonds to securitize the recovery of JCP&L's bondable stranded costs associated with the previously divested Oyster Creek Nuclear Generating Station.

JCP&L did not purchase and does not own any of the transition bonds, which are included as long-term debt on FirstEnergy's and JCP&L's Consolidated Balance Sheets. The transition bonds are obligations of JCP&L Transition only and are collateralized solely by the equity and assets of JCP&L Transition, which consist primarily of bondable transition property. The bondable transition property is solely the property of JCP&L Transition.

Bondable transition property represents the irrevocable right under New Jersey law of a utility company to charge, collect and receive from its customers, through a non-bypassable TBC, the principal amount and interest on the transition bonds and other fees and expenses associated with their issuance. JCP&L sold the bondable transition property to JCP&L Transition and, as servicer, manages and administers the bondable transition property, including the billing, collection and remittance of the TBC, pursuant to a servicing agreement with JCP&L Transition. JCP&L is entitled to a quarterly servicing fee of $100,000 that is payable from TBC collections.

10. - COMMITMENTS, GUARANTEES AND CONTINGENCIES

(A)  GUARANTEES AND OTHER ASSURANCES
 
                   As part of normal business activities, FirstEnergy enters into various agreements on behalf of its subsidiaries to provide financial or performance assurances to third parties. These agreements include contract guarantees, surety bonds and LOCs. As of June 30, 2006, outstanding guarantees and other assurances totaled approximately $3.5 billion consisting of contract guarantees ($1.9 billion), surety bonds ($0.1 billion) and LOCs ($1.5 billion).

FirstEnergy guarantees energy and energy-related payments of its subsidiaries involved in energy commodity activities principally to facilitate normal physical transactions involving electricity, gas, emission allowances and coal. FirstEnergy also provides guarantees to various providers of subsidiary financing principally for the acquisition of property, plant and equipment. These agreements legally obligate FirstEnergy to fulfill the obligations of those subsidiaries directly involved in energy and energy-related transactions or financing where the law might otherwise limit the counterparties' claims. If demands of a counterparty were to exceed the ability of a subsidiary to satisfy existing obligations, FirstEnergy's guarantee enables the counterparty's legal claim to be satisfied by other FirstEnergy assets. The likelihood is remote that such parental guarantees of $0.8 billion (included in the $1.9 billion discussed above) as of June 30, 2006 would increase amounts otherwise payable by FirstEnergy to meet its obligations incurred in connection with financings and ongoing energy and energy-related activities.

While these types of guarantees are normally parental commitments for the future payment of subsidiary obligations, subsequent to the occurrence of a credit rating-downgrade or “material adverse event” the immediate posting of cash collateral or provision of an LOC may be required of the subsidiary. As of June 30, 2006, FirstEnergy's maximum exposure under these collateral provisions was $501 million.

Most of FirstEnergy's surety bonds are backed by various indemnities common within the insurance industry. Surety bonds and related FirstEnergy guarantees of $146 million provide additional assurance to outside parties that contractual and statutory obligations will be met in a number of areas including construction jobs, environmental commitments and various retail transactions.

The Companies, with the exception of TE and JCP&L, each have a wholly owned subsidiary whose borrowings are secured by customer accounts receivable purchased from its respective parent company. The CEI subsidiary's borrowings are also secured by customer accounts receivable purchased from TE. Each subsidiary company has its own receivables financing arrangement and, as a separate legal entity with separate creditors, would have to satisfy its obligations to creditors before any of its remaining assets could be available to its parent company.
 
 
 
 
 
Borrowing
 
Subsidiary Company
 
Parent Company
 
Capacity
 
 
 
 
 
(In millions)
 
OES Capital, Incorporated
 
 
OE
 
$
170
 
Centerior Funding Corp.
 
 
CEI
 
 
200
 
Penn Power Funding LLC
 
 
Penn
 
 
25
 
Met-Ed Funding LLC
 
 
Met-Ed
 
 
80
 
Penelec Funding LLC
 
 
Penelec
 
 
75
 
 
 
 
 
 
$
550
 
 
    
8

 
                   FirstEnergy has also guaranteed the obligations of the operators of the TEBSA project up to a maximum of $6 million (subject to escalation) under the project's operations and maintenance agreement. In connection with the sale of TEBSA in January 2004, the purchaser indemnified FirstEnergy against any loss under this guarantee. FirstEnergy has also provided an LOC ($36 million as of June 30, 2006), which is renewable and declines yearly based upon the senior outstanding debt of TEBSA.

(B) ENVIRONMENTAL MATTERS

Various federal, state and local authorities regulate FirstEnergy with regard to air and water quality and other environmental matters. The effects of compliance on the Companies with regard to environmental matters could have a material adverse effect on FirstEnergy's earnings and competitive position to the extent that it competes with companies that are not subject to such regulations and therefore do not bear the risk of costs associated with compliance, or failure to comply, with such regulations. Overall, FirstEnergy believes it is in compliance with existing regulations but is unable to predict future changes in regulatory policies and what, if any, the effects of such changes would be. FirstEnergy estimates additional capital expenditures for environmental compliance of approximately $1.8 billion for 2006 through 2010.
 
                   FirstEnergy accrues environmental liabilities only when it concludes that it is probable that it has an obligation for such costs and can reasonably estimate the amount of such costs. Unasserted claims are reflected in FirstEnergy’s determination of environmental liabilities and are accrued in the period that they are both probable and reasonably estimable.
 
                   On December 1, 2005, FirstEnergy issued a comprehensive report to shareholders regarding air emissions regulations and an assessment of its future risks and mitigation efforts.

Clean Air Act Compliance
 
                   FirstEnergy is required to meet federally approved SO2 regulations. Violations of such regulations can result in shutdown of the generating unit involved and/or civil or criminal penalties of up to $32,500 for each day the unit is in violation. The EPA has an interim enforcement policy for SO2 regulations in Ohio that allows for compliance based on a 30-day averaging period. FirstEnergy cannot predict what action the EPA may take in the future with respect to the interim enforcement policy.
 
                   The EPA Region 5 issued a Finding of Violation and NOV to the Bay Shore Power Plant dated June 15, 2006 alleging violations to various sections of the Clean Air Act. A meeting has been scheduled for August 8, 2006 to discuss the alleged violations with the EPA.
 
                   FirstEnergy believes it is complying with SO2 reduction requirements under the Clean Air Act Amendments of 1990 by burning lower-sulfur fuel, generating more electricity from lower-emitting plants, and/or using emission allowances. NOX reductions required by the 1990 Amendments are being achieved through combustion controls and the generation of more electricity at lower-emitting plants. In September 1998, the EPA finalized regulations requiring additional NOX reductions from FirstEnergy's facilities. The EPA's NOX Transport Rule imposes uniform reductions of NOX emissions (an approximate 85% reduction in utility plant NOX emissions from projected 2007 emissions) across a region of nineteen states (including Michigan, New Jersey, Ohio and Pennsylvania) and the District of Columbia based on a conclusion that such NOX emissions are contributing significantly to ozone levels in the eastern United States. FirstEnergy believes its facilities are also complying with the NOX budgets established under State Implementation Plans through combustion controls and post-combustion controls, including Selective Catalytic Reduction and Selective Non-Catalytic Reduction systems, and/or using emission allowances.

National Ambient Air Quality Standards
 
                   In July 1997, the EPA promulgated changes in the NAAQS for ozone and fine particulate matter. In March 2005, the EPA finalized the CAIR covering a total of 28 states (including Michigan, New Jersey, Ohio and Pennsylvania) and the District of Columbia based on proposed findings that air emissions from 28 eastern states and the District of Columbia significantly contribute to non-attainment of the NAAQS for fine particles and/or the "8-hour" ozone NAAQS in other states. CAIR provides each affected state until 2006 to develop implementing regulations to achieve additional reductions of NOX and SO2 emissions in two phases (Phase I in 2009 for NOX, 2010 for SO2 and Phase II in 2015 for both NOX and SO2). FirstEnergy's Michigan, Ohio and Pennsylvania fossil-fired generation facilities will be subject to caps on SO2 and NOX emissions, whereas its New Jersey fossil-fired generation facility will be subject to only a cap on NOX emissions. According to the EPA, SO2 emissions will be reduced by 45% (from 2003 levels) by 2010 across the states covered by the rule, with reductions reaching 73% (from 2003 levels) by 2015, capping SO2 emissions in affected states to just 2.5 million tons annually. NOX emissions will be reduced by 53% (from 2003 levels) by 2009 across the states covered by the rule, with reductions reaching 61% (from 2003 levels) by 2015, achieving a regional NOX cap of 1.3 million tons annually. The future cost of compliance with these regulations may be substantial and will depend on how they are ultimately implemented by the states in which FirstEnergy operates affected facilities.

9



Mercury Emissions
 
                   In December 2000, the EPA announced it would proceed with the development of regulations regarding hazardous air pollutants from electric power plants, identifying mercury as the hazardous air pollutant of greatest concern. In March 2005, the EPA finalized the CAMR, which provides a cap-and-trade program to reduce mercury emissions from coal-fired power plants in two phases. Initially, mercury emissions will be capped nationally at 38 tons by 2010 (as a "co-benefit" from implementation of SO2 and NOX emission caps under the EPA's CAIR program). Phase II of the mercury cap-and-trade program will cap nationwide mercury emissions from coal-fired power plants at 15 tons per year by 2018. However, the final rules give states substantial discretion in developing rules to implement these programs. In addition, both the CAIR and the CAMR have been challenged in the United States Court of Appeals for the District of Columbia. FirstEnergy's future cost of compliance with these regulations may be substantial and will depend on how they are ultimately implemented by the states in which FirstEnergy operates affected facilities.
 
                   The model rules for both CAIR and CAMR contemplate an input-based methodology to allocate allowances to affected facilities. Under this approach, allowances would be allocated based on the amount of fuel consumed by the affected sources. FirstEnergy would prefer an output-based generation-neutral methodology in which allowances are allocated based on megawatts of power produced. Since this approach is based on output, new and non-emitting generating facilities, including renewables and nuclear, would be entitled to their proportionate share of the allowances. Consequently, FirstEnergy would be disadvantaged if these model rules were implemented because FirstEnergy’s substantial reliance on non-emitting (largely nuclear) generation is not recognized under the input-based allocation.
 
                    Pennsylvania has proposed a new rule to regulate mercury emissions from coal-fired power plants that does not provide a cap and trade approach as in CAMR, but rather follows a command and control approach imposing emission limits on individual sources. If adopted as proposed, Pennsylvania’s mercury regulation would deprive FirstEnergy of mercury emission allowances that were to be allocated to the Mansfield Plant under CAMR and that would otherwise be available for achieving FirstEnergy system-wide compliance. The future cost of compliance with these regulations, if adopted and implemented as proposed, may be substantial.

W. H. Sammis Plant
 
                   In 1999 and 2000, the EPA issued NOV or Compliance Orders to nine utilities alleging violations of the Clean Air Act based on operation and maintenance of 44 power plants, including the W. H. Sammis Plant, which was owned at that time by OE and Penn. In addition, the DOJ filed eight civil complaints against various investor-owned utilities, including a complaint against OE and Penn in the U.S. District Court for the Southern District of Ohio. These cases are referred to as New Source Review cases. On March 18, 2005, OE and Penn announced that they had reached a settlement with the EPA, the DOJ and three states (Connecticut, New Jersey, and New York) that resolved all issues related to the W. H. Sammis Plant New Source Review litigation. This settlement agreement was approved by the Court on July 11, 2005, and requires reductions of NOX and SO2 emissions at the W. H. Sammis Plant and other coal fired plants through the installation of pollution control devices and provides for stipulated penalties for failure to install and operate such pollution controls in accordance with that agreement. Consequently, if FirstEnergy fails to install such pollution control devices, for any reason, including, but not limited to, the failure of any third-party contractor to timely meet its delivery obligations for such devices, FirstEnergy could be exposed to penalties under the settlement agreement. Capital expenditures necessary to meet those requirements are currently estimated to be $1.5 billion (the primary portion of which is expected to be spent in the 2008 to 2011 time period). On August 26, 2005, FGCO entered into an agreement with Bechtel Power Corporation under which Bechtel will engineer, procure, and construct air quality control systems for the reduction of sulfur dioxide emissions. The settlement agreement also requires OE and Penn to spend up to $25 million toward environmentally beneficial projects, which include wind energy purchased power agreements over a 20-year term. OE and Penn agreed to pay a civil penalty of $8.5 million. Results for the first quarter of 2005 included the penalties paid by OE and Penn of $7.8 million and $0.7 million, respectively. OE and Penn also recognized liabilities in the first quarter of 2005 of $9.2 million and $0.8 million, respectively, for probable future cash contributions toward environmentally beneficial projects.

Climate Change
 
                   In December 1997, delegates to the United Nations' climate summit in Japan adopted an agreement, the Kyoto Protocol, to address global warming by reducing the amount of man-made GHG emitted by developed countries by 5.2% from 1990 levels between 2008 and 2012. The United States signed the Kyoto Protocol in 1998 but it failed to receive the two-thirds vote required for ratification by the United States Senate. However, the Bush administration has committed the United States to a voluntary climate change strategy to reduce domestic GHG intensity - the ratio of emissions to economic output - by 18% through 2012. The EPACT established a Committee on Climate Change Technology to coordinate federal climate change activities and promote the development and deployment of GHG reducing technologies.

10

 
                   FirstEnergy cannot currently estimate the financial impact of climate change policies, although the potential restrictions on CO2 emissions could require significant capital and other expenditures. The CO2 emissions per KWH of electricity generated by FirstEnergy is lower than many regional competitors due to its diversified generation sources, which include low or non-CO2 emitting gas-fired and nuclear generators.

Clean Water Act
 
                   Various water quality regulations, the majority of which are the result of the federal Clean Water Act and its amendments, apply to FirstEnergy's plants. In addition, Ohio, New Jersey and Pennsylvania have water quality standards applicable to FirstEnergy's operations. As provided in the Clean Water Act, authority to grant federal National Pollutant Discharge Elimination System water discharge permits can be assumed by a state. Ohio, New Jersey and Pennsylvania have assumed such authority.
 
                   On September 7, 2004, the EPA established new performance standards under Section 316(b) of the Clean Water Act for reducing impacts on fish and shellfish from cooling water intake structures at certain existing large electric generating plants. The regulations call for reductions in impingement mortality, when aquatic organisms are pinned against screens or other parts of a cooling water intake system, and entrainment, which occurs when aquatic species are drawn into a facility's cooling water system. FirstEnergy is conducting comprehensive demonstration studies, due in 2008, to determine the operational measures, equipment or restoration activities, if any, necessary for compliance by its facilities with the performance standards. FirstEnergy is unable to predict the outcome of such studies. Depending on the outcome of such studies, the future cost of compliance with these standards may require material capital expenditures.

Regulation of Hazardous Waste
 
                   As a result of the Resource Conservation and Recovery Act of 1976, as amended, and the Toxic Substances Control Act of 1976, federal and state hazardous waste regulations have been promulgated. Certain fossil-fuel combustion waste products, such as coal ash, were exempted from hazardous waste disposal requirements pending the EPA's evaluation of the need for future regulation. The EPA subsequently determined that regulation of coal ash as a hazardous waste is unnecessary. In April 2000, the EPA announced that it will develop national standards regulating disposal of coal ash under its authority to regulate nonhazardous waste.

The Companies have been named as PRPs at waste disposal sites, which may require cleanup under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980. Allegations of disposal of hazardous substances at historical sites and the liability involved are often unsubstantiated and subject to dispute; however, federal law provides that all PRPs for a particular site are liable on a joint and several basis. Therefore, environmental liabilities that are considered probable have been recognized on the Consolidated Balance Sheet as of June 30, 2006, based on estimates of the total costs of cleanup, the Companies' proportionate responsibility for such costs and the financial ability of other unaffiliated entities to pay. In addition, JCP&L has accrued liabilities for environmental remediation of former manufactured gas plants in New Jersey; those costs are being recovered by JCP&L through a non-bypassable SBC. Total liabilities of approximately $70 million (JCP&L - $55 million, CEI - $2 million, and other subsidiaries- $13 million) have been accrued through June 30, 2006.

(C) OTHER LEGAL PROCEEDINGS

Power Outages and Related Litigation
 
                   In July 1999, the Mid-Atlantic States experienced a severe heat wave, which resulted in power outages throughout the service territories of many electric utilities, including JCP&L's territory. In an investigation into the causes of the outages and the reliability of the transmission and distribution systems of all four of New Jersey’s electric utilities, the NJBPU concluded that there was not a prima facie case demonstrating that, overall, JCP&L provided unsafe, inadequate or improper service to its customers. Two class action lawsuits (subsequently consolidated into a single proceeding) were filed in New Jersey Superior Court in July 1999 against JCP&L, GPU and other GPU companies, seeking compensatory and punitive damages arising from the July 1999 service interruptions in the JCP&L territory.
 
                   In August 2002, the trial court granted partial summary judgment to JCP&L and dismissed the plaintiffs' claims for consumer fraud, common law fraud, negligent misrepresentation, and strict product liability. In November 2003, the trial court granted JCP&L's motion to decertify the class and denied plaintiffs' motion to permit into evidence their class-wide damage model indicating damages in excess of $50 million. These class decertification and damage rulings were appealed to the Appellate Division. The Appellate Division issued a decision on July 8, 2004, affirming the decertification of the originally certified class, but remanding for certification of a class limited to those customers directly impacted by the outages of JCP&L transformers in Red Bank, New Jersey. On September 8, 2004, the New Jersey Supreme Court denied the motions filed by plaintiffs and JCP&L for leave to appeal the decision of the Appellate Division. In December 2005, JCP&L argued its motion for summary judgment before the New Jersey Superior Court on its renewed motion to decertify the class and on remaining plaintiffs' negligence and breach of contract claims. These motions remain pending. FirstEnergy is unable to predict the outcome of these matters and no liability has been accrued as of June 30, 2006.

11


                   On August 14, 2003, various states and parts of southern Canada experienced widespread power outages. The outages affected approximately 1.4 million customers in FirstEnergy's service area. The U.S. - Canada Power System Outage Task Force’s final report in April 2004 on the outages concluded, among other things, that the problems leading to the outages began in FirstEnergy’s Ohio service area. Specifically, the final report concluded, among other things, that the initiation of the August 14, 2003 power outages resulted from an alleged failure of both FirstEnergy and ECAR to assess and understand perceived inadequacies within the FirstEnergy system; inadequate situational awareness of the developing conditions; and a perceived failure to adequately manage tree growth in certain transmission rights of way. The Task Force also concluded that there was a failure of the interconnected grid's reliability organizations (MISO and PJM) to provide effective real-time diagnostic support. The final report is publicly available through the Department of Energy’s Web site (www.doe.gov). FirstEnergy believes that the final report does not provide a complete and comprehensive picture of the conditions that contributed to the August 14, 2003 power outages and that it does not adequately address the underlying causes of the outages. FirstEnergy remains convinced that the outages cannot be explained by events on any one utility's system. The final report contained 46 “recommendations to prevent or minimize the scope of future blackouts.” Forty-five of those recommendations related to broad industry or policy matters while one, including subparts, related to activities the Task Force recommended be undertaken by FirstEnergy, MISO, PJM, ECAR, and other parties to correct the causes of the August 14, 2003 power outages. FirstEnergy implemented several initiatives, both prior to and since the August 14, 2003 power outages, which were independently verified by NERC as complete in 2004 and were consistent with these and other recommendations and collectively enhance the reliability of its electric system. FirstEnergy’s implementation of these recommendations in 2004 included completion of the Task Force recommendations that were directed toward FirstEnergy. FirstEnergy is also proceeding with the implementation of the recommendations that were to be completed subsequent to 2004 and will continue to periodically assess the FERC-ordered Reliability Study recommendations for forecasted 2009 system conditions, recognizing revised load forecasts and other changing system conditions which may impact the recommendations. Thus far, implementation of the recommendations has not required, nor is expected to require, substantial investment in new or material upgrades to existing equipment. The FERC or other applicable government agencies and reliability coordinators may, however, take a different view as to recommended enhancements or may recommend additional enhancements in the future as the result of adoption of mandatory reliability standards pursuant to the EPACT that could require additional material expenditures.
 
                   FirstEnergy companies also are defending six separate complaint cases before the PUCO relating to the August 14, 2003 power outage. Two cases were originally filed in Ohio State courts but were subsequently dismissed for lack of subject matter jurisdiction and further appeals were unsuccessful. In these cases the individual complainants—three in one case and four in the other—sought to represent others as part of a class action. The PUCO dismissed the class allegations, stating that its rules of practice do not provide for class action complaints. Three other pending PUCO complaint cases were filed by various insurance carriers either in their own name as subrogees or in the name of their insured. In each of these three cases, the carrier seeks reimbursement from various FirstEnergy companies (and, in one case, from PJM, MISO and American Electric Power Company, Inc., as well) for claims paid to insureds for damages allegedly arising as a result of the loss of power on August 14, 2003. The listed insureds in these cases, in many instances, are not customers of any FirstEnergy company. The sixth case involves the claim of a non-customer seeking reimbursement for losses incurred when its store was burglarized on August 14, 2003. FirstEnergy filed a Motion to Dismiss on June 13, 2006. It is currently expected that this case will be summarily dismissed, although the Motion is still pending. On March 7, 2006, the PUCO issued a ruling applicable to all pending cases. Among its various rulings, the PUCO consolidated all of the pending outage cases for hearing; limited the litigation to service-related claims by customers of the Ohio operating companies; dismissed FirstEnergy as a defendant; ruled that the U.S.-Canada Power System Outage Task Force Report was not admissible into evidence; and gave the plaintiffs additional time to amend their complaints to otherwise comply with the PUCO’s underlying order. Also, most complainants, along with the FirstEnergy companies, filed applications for rehearing with the PUCO over various rulings contained in the March 7, 2006 order. On April 26, 2006, the PUCO granted rehearing to allow the insurance company claimants, as insurers, to prosecute their claims in their name so long as they also identify the underlying insured entities and the Ohio utilities that provide their service. The PUCO denied all other motions for rehearing. The plaintiffs in each case have since filed an amended complaint and the named FirstEnergy companies have answered and also have filed a motion to dismiss each action. These motions are pending. Additionally, on June 23, 2006, one of the insurance carrier complainants filed an appeal with the Ohio Supreme Court over the PUCO’s denial of motion for rehearing on the issue of the admissibility of the Task Force Report and the dismissal of FirstEnergy Corp. as a respondent. Briefing is expected to be completed on this appeal by mid-September. It is unknown when the Supreme Court will rule on the appeal. No estimate of potential liability is available for any of these cases.
 
                   In addition to the above proceedings, FirstEnergy was named in a complaint filed in Michigan State Court by an individual who is not a customer of any FirstEnergy company. FirstEnergy's motion to dismiss the matter was denied on June 2, 2006. FirstEnergy has since filed an appeal, which is pending. A responsive pleading to this matter has been filed. Also, the complaint has been amended to include an additional party. No estimate of potential liability has been undertaken in this matter.

12

 
                   FirstEnergy was also named, along with several other entities, in a complaint in New Jersey State Court. The allegations against FirstEnergy were based, in part, on an alleged failure to protect the citizens of Jersey City from an electrical power outage. None of FirstEnergy’s subsidiaries serve customers in Jersey City. A responsive pleading has been filed. On April 28, 2006, the Court granted FirstEnergy's motion to dismiss. The plaintiff has not appealed.
 
                   FirstEnergy is vigorously defending these actions, but cannot predict the outcome of any of these proceedings or whether any further regulatory proceedings or legal actions may be initiated against the Companies. Although unable to predict the impact of these proceedings, if FirstEnergy or its subsidiaries were ultimately determined to have legal liability in connection with these proceedings, it could have a material adverse effect on FirstEnergy's or its subsidiaries' financial condition, results of operations and cash flows.

Nuclear Plant Matters
 
                    On January 20, 2006, FENOC announced that it had entered into a deferred prosecution agreement with the U.S. Attorney’s Office for the Northern District of Ohio and the Environmental Crimes Section of the Environment and Natural Resources Division of the DOJ related to FENOC’s communications with the NRC during the fall of 2001 in connection with the reactor head issue at the Davis-Besse Nuclear Power Station. Under the agreement, which expires on December 31, 2006, the United States acknowledged FENOC’s extensive corrective actions at Davis-Besse, FENOC’s cooperation during investigations by the DOJ and the NRC, FENOC’s pledge of continued cooperation in any related criminal and administrative investigations and proceedings, FENOC’s acknowledgement of responsibility for the behavior of its employees, and its agreement to pay a monetary penalty. The DOJ will refrain from seeking an indictment or otherwise initiating criminal prosecution of FENOC for all conduct related to the statement of facts attached to the deferred prosecution agreement, as long as FENOC remains in compliance with the agreement, which FENOC fully intends to do. FENOC paid a monetary penalty of $28 million (not deductible for income tax purposes) which reduced FirstEnergy's earnings by $0.09 per common share in the fourth quarter of 2005.
 
                   On April 21, 2005, the NRC issued a NOV and proposed a $5.45 million civil penalty related to the degradation of the Davis-Besse reactor vessel head issue discussed above. FirstEnergy accrued $2 million for a potential fine prior to 2005 and accrued the remaining liability for the proposed fine during the first quarter of 2005. On September 14, 2005, FENOC filed its response to the NOV with the NRC. FENOC accepted full responsibility for the past failure to properly implement its boric acid corrosion control and corrective action programs. The NRC NOV indicated that the violations do not represent current licensee performance. FirstEnergy paid the penalty in the third quarter of 2005. On January 23, 2006, FENOC supplemented its response to the NRC's NOV on the Davis-Besse head degradation to reflect the deferred prosecution agreement that FENOC had reached with the DOJ.
 
                   On August 12, 2004, the NRC notified FENOC that it would increase its regulatory oversight of the Perry Nuclear Power Plant as a result of problems with safety system equipment over the preceding two years and the licensee's failure to take prompt and corrective action. FENOC operates the Perry Nuclear Power Plant.
 
                    On April 4, 2005, the NRC held a public meeting to discuss FENOC’s performance at the Perry Nuclear Power Plant as identified in the NRC's annual assessment letter to FENOC. Similar public meetings are held with all nuclear power plant licensees following issuance by the NRC of their annual assessments. According to the NRC, overall the Perry Nuclear Power Plant operated "in a manner that preserved public health and safety" even though it remained under heightened NRC oversight. During the public meeting and in the annual assessment, the NRC indicated that additional inspections will continue and that the plant must improve performance to be removed from the Multiple/Repetitive Degraded Cornerstone Column of the Action Matrix.
 
                   On September 28, 2005, the NRC sent a CAL to FENOC describing commitments that FENOC had made to improve the performance at the Perry Plant and stated that the CAL would remain open until substantial improvement was demonstrated. The CAL was anticipated as part of the NRC's Reactor Oversight Process. In the NRC's 2005 annual assessment letter dated March 2, 2006 and associated meetings to discuss the performance of Perry on March 14, 2006, the NRC again stated that the Perry Plant continued to operate in a manner that "preserved public health and safety." However, the NRC also stated that increased levels of regulatory oversight would continue until sustained improvement in the performance of the facility was realized. If performance does not improve, the NRC has a range of options under the Reactor Oversight Process, from increased oversight to possible impact to the plant’s operating authority. Although FirstEnergy is unable to predict the impact of the ultimate disposition of this matter, it could have a material adverse effect on FirstEnergy's or its subsidiaries' financial condition, results of operations and cash flows.
 
                   As of December 16, 2005, NGC acquired ownership of the nuclear generation assets transferred from OE, CEI, TE and Penn with the exception of leasehold interests of OE and TE in certain of the nuclear plants that are subject to sale and leaseback arrangements with non-affiliates.

13


Other Legal Matters
 
                   There are various lawsuits, claims (including claims for asbestos exposure) and proceedings related to FirstEnergy's normal business operations pending against FirstEnergy and its subsidiaries. The other potentially material items not otherwise discussed above are described below.
 
                   On October 20, 2004, FirstEnergy was notified by the SEC that the previously disclosed informal inquiry initiated by the SEC's Division of Enforcement in September 2003 relating to the restatements in August 2003 of previously reported results by FirstEnergy and the Ohio Companies, and the Davis-Besse extended outage, have become the subject of a formal order of investigation. The SEC's formal order of investigation also encompasses issues raised during the SEC's examination of FirstEnergy and the Companies under the now repealed PUHCA. Concurrent with this notification, FirstEnergy received a subpoena asking for background documents and documents related to the restatements and Davis-Besse issues. On December 30, 2004, FirstEnergy received a subpoena asking for documents relating to issues raised during the SEC's PUHCA examination. On August 24, 2005, additional information was requested regarding Davis-Besse-related disclosures, which has been provided. FirstEnergy has cooperated fully with the informal inquiry and continues to do so with the formal investigation.
 
                   On August 22, 2005, a class action complaint was filed against OE in Jefferson County, Ohio Common Pleas Court, seeking compensatory and punitive damages to be determined at trial based on claims of negligence and eight other tort counts alleging damages from W.H. Sammis Plant air emissions. The two named plaintiffs are also seeking injunctive relief to eliminate harmful emissions and repair property damage and the institution of a medical monitoring program for class members.
 
                   JCP&L's bargaining unit employees filed a grievance challenging JCP&L's 2002 call-out procedure that required bargaining unit employees to respond to emergency power outages. On May 20, 2004, an arbitration panel concluded that the call-out procedure violated the parties' collective bargaining agreement. At the conclusion of the June 1, 2005 hearing, the Arbitrator decided not to hear testimony on damages and closed the proceedings. On September 9, 2005, the Arbitrator issued an opinion to award approximately $16 million to the bargaining unit employees. On February 6, 2006, the federal court granted a Union motion to dismiss JCP&L's appeal of the award as premature. JCP&L will file its appeal again in federal district court once the damages associated with this case are identified at an individual employee level. JCP&L recognized a liability for the potential $16 million award in 2005.
 
                   The City of Huron filed a complaint against OE with the PUCO challenging the ability of electric distribution utilities to collect transition charges from a customer of a newly-formed municipal electric utility. The complaint was filed on May 28, 2003, and OE timely filed its response on June 30, 2003. In a related filing, the Ohio Companies filed for approval with the PUCO of a tariff that would specifically allow the collection of transition charges from customers of municipal electric utilities formed after 1998. Both filings were consolidated for hearing and decision described above. An adverse ruling could negatively affect full recovery of transition charges by the utility. Hearings on the matter were held in August 2005. Initial briefs from all parties were filed on September 22, 2005 and reply briefs were filed on October 14, 2005. On May 10, 2006, the PUCO issued its Opinion and Order dismissing the City’s complaint and approving the related tariffs, thus affirming OE’s entitlement to recovery of its transition charges. The City of Huron filed an application for rehearing of the PUCO’s decision on June 9, 2006 and OE filed a memorandum in opposition to that application on June 19, 2006. The PUCO denied the City’s application for rehearing on June 28, 2006. The City of Huron has 60 days from the denial of rehearing to appeal the PUCO’s decision.
 
                   If it were ultimately determined that FirstEnergy or its subsidiaries have legal liability or are otherwise made subject to liability based on the above matters, it could have a material adverse effect on FirstEnergy's or its subsidiaries' financial condition, results of operations and cash flows.

14


11. - REGULATORY MATTERS

RELIABILITY INITIATIVES
 
                    In late 2003 and early 2004, a series of letters, reports and recommendations were issued from various entities, including governmental, industry and ad hoc reliability entities (PUCO, FERC, NERC and the U.S. - Canada Power System Outage Task Force) regarding enhancements to regional reliability. In 2004, FirstEnergy completed implementation of all actions and initiatives related to enhancing area reliability, improving voltage and reactive management, operator readiness and training and emergency response preparedness recommended for completion in 2004. On July 14, 2004, NERC independently verified that FirstEnergy had implemented the various initiatives to be completed by June 30 or summer 2004, with minor exceptions noted by FirstEnergy, which exceptions are now essentially complete. FirstEnergy is proceeding with the implementation of the recommendations that were to be completed subsequent to 2004 and will continue to periodically assess the FERC-ordered Reliability Study recommendations for forecasted 2009 system conditions, recognizing revised load forecasts and other changing system conditions which may impact the recommendations. Thus far, implementation of the recommendations has not required, nor is expected to require, substantial investment in new, or material upgrades to existing equipment. The FERC or other applicable government agencies and reliability coordinators may, however, take a different view as to recommended enhancements or may recommend additional enhancements in the future as the result of adoption of mandatory reliability standards pursuant to the EPACT that could require additional, material expenditures.

   As a result of outages experienced in JCP&L’s service area in 2002 and 2003, the NJBPU had implemented reviews into JCP&L’s service reliability. In 2004, the NJBPU adopted an MOU that set out specific tasks related to service reliability to be performed by JCP&L and a timetable for completion and endorsed JCP&L’s ongoing actions to implement the MOU. On June 9, 2004, the NJBPU approved a Stipulation that incorporates the final report of an SRM who made recommendations on appropriate courses of action necessary to ensure system-wide reliability. The Stipulation also incorporates the Executive Summary and Recommendation portions of the final report of a focused audit of JCP&L’s Planning and Operations and Maintenance programs and practices (Focused Audit). A final order in the Focused Audit docket was issued by the NJBPU on July 23, 2004. On February 11, 2005, JCP&L met with the DRA to discuss reliability improvements. The SRM completed his work and issued his final report to the NJBPU on June 1, 2006. A meeting was held between JCP&L and the NJBPU on June 29, 2006 to discuss the SRM’s final report. JCP&L filed a comprehensive response to the NJBPU on July 14, 2006. JCP&L continues to file compliance reports reflecting activities associated with the MOU and Stipulation.
 
                   The EPACT provides for the creation of an ERO to establish and enforce reliability standards for the bulk power system, subject to FERC review. On February 3, 2006, the FERC adopted a rule establishing certification requirements for the ERO, as well as regional entities envisioned to assume monitoring responsibility for the new reliability standards. The FERC issued an order on rehearing on March 30, 2006, providing certain clarifications and essentially affirming the rule.
 
                    The NERC has been preparing the implementation aspects of reorganizing its structure to meet the FERC’s certification requirements for the ERO. The NERC made a filing with the FERC on April 4, 2006 to obtain certification as the ERO and to obtain FERC approval of delegation agreements with regional entities. The new FERC rule referred to above, further provides for reorganizing regional reliability organizations (regional entities) that would replace the current regional councils and for rearranging the relationship with the ERO. The “regional entity” may be delegated authority by the ERO, subject to FERC approval, for enforcing reliability standards adopted by the ERO and approved by the FERC. The ERO filing was noticed on April 7, 2006 and comments and reply comments were filed in May, June and July 2006. On July 20, 2006, the FERC certified NERC as the ERO to implement the provisions of Section 215 of the Federal Power Act. The FERC directed NERC to make a compliance filing within ninety days addressing such issues as the regional delegation agreements.

                     On April 4, 2006, NERC also submitted a filing with the FERC seeking approval of mandatory reliability standards. These reliability standards are based, with some modifications, on the current NERC Version O reliability standards with some additional standards. The reliability standards filing was noticed by the FERC on April 18, 2006. In that notice, the FERC announced its intent to issue a Notice of Proposed Rulemaking on the proposed reliability standards at a future date. On May 11, 2006, the FERC staff released a preliminary assessment that cited many deficiencies in the proposed reliability standards. The NERC and industry participants filed comments in response to the Staff’s preliminary assessment. The FERC held a technical conference on the proposed reliability standards on July 6, 2006. The chairman has indicated that the FERC intends to act on the proposed reliability standards by issuing a NOPR in September of this year. Interested parties will be given the opportunity to comment on the NOPR. NERC has requested an effective date of January 1, 2007 for the proposed reliability standards.

                  
15


The ECAR, Mid-Atlantic Area Council, and Mid-American Interconnected Network reliability councils have completed the consolidation of these regions into a single new regional reliability organization known as ReliabilityFirst Corporation. ReliabilityFirst began operations as a regional reliability council under NERC on January 1, 2006 and intends to file and obtain certification consistent with the final rule as a “regional entity” under the ERO during 2006. All of FirstEnergy’s facilities are located within the ReliabilityFirst region.
 
                   On May 2, 2006, the NERC Board of Trustees adopted eight new cyber security standards that replaced interim standards put in place in the wake of the September 11, 2001 terrorist attacks, and thirteen additional reliability standards. The security standards became effective on June 1, 2006, and the remaining standards will become effective throughout 2006 and 2007. NERC intends to file the standards with the FERC and relevant Canadian authorities for approval.

FirstEnergy believes it is in compliance with all current NERC reliability standards. However, it is expected that the FERC will adopt stricter reliability standards than those contained in the current NERC standards. The financial impact of complying with the new standards cannot be determined at this time. However, the EPACT required that all prudent costs incurred to comply with the new reliability standards be recovered in rates.

OHIO

On October 21, 2003 the Ohio Companies filed their RSP case with the PUCO. On August 5, 2004, the Ohio Companies accepted the RSP as modified and approved by the PUCO in an August 4, 2004 Entry on Rehearing, subject to a CBP. The RSP was intended to establish generation service rates beginning January 1, 2006, in response to the PUCO’s concerns about price and supply uncertainty following the end of the Ohio Companies' transition plan market development period. In October 2004, the OCC and NOAC filed appeals with the Supreme Court of Ohio to overturn the original June 9, 2004 PUCO order in the proceeding as well as the associated entries on rehearing. On September 28, 2005, the Supreme Court of Ohio heard oral arguments on the appeals. On May 3, 2006, the Supreme Court of Ohio issued an opinion affirming the PUCO's order with respect to the approval of the rate stabilization charge, approval of the shopping credits, the granting of interest on shopping credit incentive deferral amounts, and approval of the Ohio Companies’ financial separation plan. It remanded one matter back to the PUCO for further consideration of the issue as to whether the RSP, as adopted by the PUCO, provided for sufficient means for customer participation in the competitive marketplace. On May 12, 2006, the Ohio Companies filed a Motion for Reconsideration with the Supreme Court of Ohio which was denied by the Court on June 21, 2006. The RSP contained a provision that permitted the Ohio Companies to withdraw and terminate the RSP in the event that the PUCO, or the Supreme Court of Ohio, rejected all or part of the RSP. In such event, the Ohio Companies have 30 days from the final order or decision to provide notice of termination. On July 20, 2006 the Ohio Companies filed with the PUCO a Request to Initiate a Proceeding on Remand. In their Request, the Ohio Companies provided notice of termination to those provisions of the RSP subject to termination, subject to being withdrawn, and also set forth a framework for addressing the Supreme Court of Ohio’s findings on customer participation, requesting the PUCO to initiate a proceeding to consider the Ohio Companies’ proposal. If the PUCO approves a resolution to the issues raised by the Supreme Court of Ohio that is acceptable to the Ohio Companies, the Ohio Companies’ termination will be withdrawn and considered to be null and void. Separately, the OCC and NOAC also submitted to the PUCO on July 20, 2006 a conceptual proposal dealing with the issue raised by the Supreme Court of Ohio. On July 26, 2006, the PUCO issued an Entry acknowledging the July 20, 2006 filings of the Ohio Companies and the OCC and NOAC, and giving the Ohio Companies 45 days to file a plan in a new docket to address the Court’s concern.
 
                   The Ohio Companies filed an application and stipulation with the PUCO on September 9, 2005 seeking approval of the RCP. On November 4, 2005, the Ohio Companies filed a supplemental stipulation with the PUCO, which constituted an additional component of the RCP filed on September 9, 2005. Major provisions of the RCP include:

 
Maintaining the existing level of base distribution rates through December 31, 2008 for OE and TE, and April 30, 2009 for CEI;
 
 
 
 
Deferring and capitalizing for future recovery (over a 25-year period) with carrying charges certain distribution costs to be incurred during the period January 1, 2006 through December 31, 2008, not to exceed $150 million in each of the three years;
 
 
 
 
Adjusting the RTC and extended RTC recovery periods and rate levels so that full recovery of authorized costs will occur as of December 31, 2008 for OE and TE and as of December 31, 2010 for CEI;
 
 
 
 
Reducing the deferred shopping incentive balances as of January 1, 2006 by up to $75 million for OE, $45 million for TE, and $85 million for CEI by accelerating the application of each respective company's accumulated cost of removal regulatory liability; and

16



 
Recovering increased fuel costs (compared to a 2002 baseline) of up to $75 million, $77 million, and $79 million, in 2006, 2007, and 2008, respectively, from all OE and TE distribution and transmission customers through a fuel recovery mechanism. OE, TE, and CEI may defer and capitalize (for recovery over a 25-year period) increased fuel costs above the amount collected through the fuel recovery mechanism.

On January 4, 2006, the PUCO approved, with modifications, the Ohio Companies’ RCP to supplement the RSP to provide customers with more certain rate levels than otherwise available under the RSP during the plan period. On January 10, 2006, the Ohio Companies filed a Motion for Clarification of the PUCO order approving the RCP. The Ohio Companies sought clarity on issues related to distribution deferrals, including requirements of the review process, timing for recognizing certain deferrals and definitions of the types of qualified expenditures. The Ohio Companies also sought confirmation that the list of deferrable distribution expenditures originally included in the revised stipulation fall within the PUCO order definition of qualified expenditures. On January 25, 2006, the PUCO issued an Entry on Rehearing granting in part, and denying in part, the Ohio Companies’ previous requests and clarifying issues referred to above. The PUCO granted the Ohio Companies’ requests to:

 
Recognize fuel and distribution deferrals commencing January 1, 2006;
 
 
 
 
Recognize distribution deferrals on a monthly basis prior to review by the PUCO Staff;
 
 
 
 
Clarify that the types of distribution expenditures included in the Supplemental Stipulation may be deferred; and
 
 
 
 
Clarify that distribution expenditures do not have to be “accelerated” in order to be deferred.
 
                   The PUCO approved the Ohio Companies’ methodology for determining distribution deferral amounts, but denied the Motion in that the PUCO Staff must verify the level of distribution expenditures contained in current rates, as opposed to simply accepting the amounts contained in the Ohio Companies’ Motion. On February 3, 2006, several other parties filed applications for rehearing on the PUCO's January 4, 2006 Order. The Ohio Companies responded to the applications for rehearing on February 8, 2006. In an Entry on Rehearing issued by the PUCO on March 1, 2006, all motions for rehearing were denied. Certain of these parties have subsequently filed notices of appeal with the Supreme Court of Ohio alleging various errors made by the PUCO in its order approving the RCP. The Ohio Companies’ Motion to Intervene in the appeals was granted by the Supreme Court on June 8, 2006. The Appellants’ Merit Briefs were filed at the Supreme Court on July 5, 2006. The Appellees include the PUCO and the Ohio Companies. The Appellees’ Merit Briefs are due on August 4, 2006. Appellants’ Reply Briefs will then be due on August 24, 2006.

                   On December 30, 2004, the Ohio Companies filed with the PUCO two applications related to the recovery of transmission and ancillary service related costs. The first application sought recovery of these costs beginning January 1, 2006. The Ohio Companies requested that these costs be recovered through a rider that would be effective on January 1, 2006 and adjusted each July 1 thereafter. The parties reached a settlement agreement that was approved by the PUCO on August 31, 2005. The incremental transmission and ancillary service revenues recovered from January 1 through June 30, 2006 were approximately $61 million. That amount included the recovery of a portion of the 2005 deferred MISO expenses as described below. On May 1, 2006, the Ohio Companies filed a modification to the rider to determine revenues ($141 million) from July 2006 through June 2007.
 
                   The second application sought authority to defer costs associated with transmission and ancillary service related costs incurred during the period October 1, 2003 through December 31, 2005. On May 18, 2005, the PUCO granted the accounting authority for the Ohio Companies to defer incremental transmission and ancillary service-related charges incurred as a participant in MISO, but only for those costs incurred during the period December 30, 2004 through December 31, 2005. Permission to defer costs incurred prior to December 30, 2004 was denied. The PUCO also authorized the Ohio Companies to accrue carrying charges on the deferred balances. On August 31, 2005, the OCC appealed the PUCO's decision. On January 20, 2006, the OCC sought rehearing of the PUCO’s approval of the recovery of deferred costs through the rider during the period January 1, 2006 through June 30, 2006. The PUCO denied the OCC's application on February 6, 2006. On March 23, 2006, the OCC appealed the PUCO's order to the Ohio Supreme Court. On March 27, 2006, the OCC filed a motion to consolidate this appeal with the deferral appeals discussed above and to postpone oral arguments in the deferral appeal until after all briefs are filed in this most recent appeal of the rider recovery mechanism. On March 20, 2006, the Ohio Supreme Court, on its own motion, consolidated the OCC's appeal of the Ohio Companies' case with a similar case involving Dayton Power & Light Company. Oral arguments were heard on May 10, 2006. The Ohio Companies are unable to predict when a decision may be issued.

17



PENNSYLVANIA
 
                    A February 2002 Commonwealth Court of Pennsylvania decision affirmed the June 2001 PPUC decision regarding approval of the FirstEnergy/GPU merger, remanded the issues of quantification and allocation of merger savings to the PPUC and denied Met-Ed and Penelec the rate relief initially approved in the PPUC decision. On October 2, 2003, the PPUC issued an order concluding that the Commonwealth Court reversed the PPUC’s June 2001 order in its entirety. In accordance with the PPUC's direction, Met-Ed and Penelec filed supplements to their tariffs that became effective in October 2003 and that reflected the CTC rates and shopping credits in effect prior to the June 2001 order.
 
                   Met-Ed’s and Penelec’s combined portion of total net merger savings during 2001 - 2004 is estimated to be approximately $51 million. A procedural schedule was established by the ALJ on January 17, 2006 and the companies filed initial testimony on March 1, 2006. On May 4, 2006, the PPUC consolidated this proceeding with the April 10, 2006 comprehensive rate filing proceeding discussed below. Met-Ed and Penelec are unable to predict the outcome of this matter.
 
                   In an October 16, 2003 order, the PPUC approved September 30, 2004 as the date for Met-Ed's and Penelec's NUG trust fund refunds. The PPUC order also denied their accounting treatment request regarding the CTC rate/shopping credit swap by requiring Met-Ed and Penelec to treat the stipulated CTC rates that were in effect from January 1, 2002 on a retroactive basis. On October 22, 2003, Met-Ed and Penelec filed an Objection with the Commonwealth Court asking that the Court reverse this PPUC finding; a Commonwealth Court judge subsequently denied their Objection on October 27, 2003 without explanation. On October 31, 2003, Met-Ed and Penelec filed an Application for Clarification of the Court order with the Commonwealth Court, a Petition for Review of the PPUC's October 2 and October 16, 2003 Orders, and an Application for Reargument, if the judge, in his clarification order, indicates that Met-Ed's and Penelec's Objection was intended to be denied on the merits. The Reargument Brief before the Commonwealth Court was filed on January 28, 2005. Oral arguments were held on June 8, 2006. On July 19, 2006, the Commonwealth Court issued its decision affirming the PPUC’s prior orders. Although the decision denied the appeal of Met-Ed and Penelec, they had previously accounted for the treatment of costs required by the PPUC’s October 2003 orders.
 
                   As of June 30, 2006, Met-Ed's and Penelec's regulatory deferrals pursuant to the 1998 Restructuring Settlement (including the Phase 2 Proceedings) and the FirstEnergy/GPU Merger Settlement Stipulation were $335 million and $57 million, respectively. Penelec's $57 million is subject to the pending resolution of taxable income issues associated with NUG trust fund proceeds. The PPUC is reviewing a January 2006 change in Met-Ed’s and Penelec’s NUG purchase power stranded cost accounting methodology. If the PPUC orders Met-Ed and Penelec to reverse the change in accounting methodology, this would result in a pre-tax loss of $10.3 million for Met-Ed.

On January 12, 2005, Met-Ed and Penelec filed, before the PPUC, a request for deferral of transmission-related costs beginning January 1, 2005. The OCA, OSBA, OTS, MEIUG, PICA, Allegheny Electric Cooperative and Pennsylvania Rural Electric Association all intervened in the case. Met-Ed and Penelec sought to consolidate this proceeding (and modified their request to provide deferral of 2006 transmission-related costs only) with the comprehensive rate filing they made on April 10, 2006 as described below. On May 4, 2006, the PPUC approved the modified request. Accordingly, Met-Ed and Penelec have deferred approximately $46 million and $12 million, respectively, representing transmission costs that were incurred from January 1, 2006 through June 30, 2006. On June 5, 2006, the OCA filed before the Commonwealth Court a petition for review of the PPUC’s approval of the deferral. On July 12, 2006, the Commonwealth Court granted the PPUC’s motion to quash the OCA’s appeal. The ratemaking treatment of the deferrals will be determined in the comprehensive rate filing proceeding discussed further below.
 
                   Met-Ed and Penelec purchase a portion of their PLR requirements from FES through a wholesale power sales agreement. Under this agreement, FES retains the supply obligation and the supply profit and loss risk for the portion of power supply requirements not self-supplied by Met-Ed and Penelec under their contracts with NUGs and other unaffiliated suppliers. The FES arrangement reduces Met-Ed's and Penelec's exposure to high wholesale power prices by providing power at a fixed price for their uncommitted PLR energy costs during the term of the agreement with FES. The wholesale power sales agreement with FES could automatically be extended for each successive calendar year unless any party elects to cancel the agreement by November 1 of the preceding year. On November 1, 2005, FES and the other parties thereto amended the agreement to provide FES the right in 2006 to terminate the agreement at any time upon 60 days notice. On April 7, 2006, the parties to the wholesale power sales agreement entered into a Tolling Agreement that arises out of FES’ notice to Met-Ed and Penelec that FES elected to exercise its right to terminate the wholesale power sales agreement effective midnight December 31, 2006, because that agreement is not economically sustainable to FES.

18


 
                   In lieu of allowing such termination to become effective as of December 31, 2006, the parties agreed, pursuant to the Tolling Agreement, to amend the wholesale power sales agreement to provide as follows:

1.   The termination provisions of the wholesale power sales agreement will be tolled for one year until December 31, 2007, provided that during such tolling period:

 a.   FES will be permitted to terminate the wholesale power sales agreement at any time with sixty days written notice;
 b.  Met-Ed and Penelec will procure through arrangements other than the wholesale power sales agreement beginning December 1, 2006 and ending     December 31, 2007, approximately 33% of the amounts of capacity and energy necessary to satisfy their PLR obligations for which Committed Resources (i.e., non-utility generation under contract to Met-Ed and Penelec, Met-Ed- and Penelec-owned generating facilities, purchased power contracts and distributed generation) have not been obtained; and
 c.    FES will not be obligated to supply additional quantities of capacity and energy in the event that a supplier of Committed Resources defaults on its supply agreement.
   
2.   During the tolling period, FES will not act as an agent for Met-Ed or Penelec in procuring the services under 1.(b) above; and

3.   The pricing provision of the wholesale power sales agreement shall remain unchanged provided Met-Ed and Penelec comply with the provisions of the Tolling Agreement and any applicable provision of the wholesale power sales agreement.
 
                   In the event that FES elects not to terminate the wholesale power sales agreement effective midnight December 31, 2007, similar tolling agreements effective after December 31, 2007 are expected to be considered by FES for subsequent years if Met-Ed and Penelec procure through arrangements other than the wholesale power sales agreement approximately 64%, 83% and 95% of the additional amounts of capacity and energy necessary to satisfy their PLR obligations for 2008, 2009 and 2010, respectively, for which Committed Resources have not been obtained from the market.
 
                  The wholesale power sales agreement, as modified by the Tolling Agreement, requires Met-Ed and Penelec to satisfy the portion of their PLR obligations currently supplied by FES from unaffiliated suppliers at prevailing prices, which are likely to be higher than the current price charged by FES under the current agreement and, as a result, Met-Ed’s and Penelec’s purchased power costs could materially increase. If Met-Ed and Penelec were to replace the entire FES supply at current market power prices without corresponding regulatory authorization to increase their generation prices to customers, each company would likely incur a significant increase in operating expenses and experience a material deterioration in credit quality metrics. Under such a scenario, each company's credit profile would no longer be expected to support an investment grade rating for its fixed income securities. There can be no assurance, however, that if FES ultimately determines to terminate, or significantly modify the agreement, timely regulatory relief will be granted by the PPUC pursuant to the April 10, 2006 comprehensive rate filing discussed below, or, to the extent granted, adequate to mitigate such adverse consequences.
 
                   Met-Ed and Penelec made a comprehensive rate filing with the PPUC on April 10, 2006 that addresses a number of transmission, distribution and supply issues. If Met-Ed's and Penelec's preferred approach involving accounting deferrals is approved, the filing would increase annual revenues by $216 million and $157 million, respectively. That filing includes, among other things, a request to charge customers for an increasing amount of market priced power procured through a CBP as the amount of supply provided under the existing FES agreement is phased out in accordance with the April 7, 2006 Tolling Agreement described above. Met-Ed and Penelec also requested approval of the January 12, 2005 petition for the deferral of transmission-related costs discussed above, but only for those costs incurred during 2006. In this rate filing, Met-Ed and Penelec also requested recovery of annual transmission and related costs incurred on or after January 1, 2007, plus the amortized portion of 2006 costs over a ten-year period, along with applicable carrying charges, through an adjustable rider similar to that implemented in Ohio. Changes in the recovery of NUG expenses and the recovery of Met-Ed's non-NUG stranded costs are also included in the filing. The filing contemplates a reduction in distribution rates for Met-Ed of $37 million annually and an increase in distribution rates for Penelec of $20 million annually. The PPUC suspended the effective date (June 10, 2006) of these rate changes for seven months after the filing as permitted under Pennsylvania law. If the PPUC adopts the overall positions taken in the intervenors’ testimony as filed, this would have a material adverse effect on the financial statements of FirstEnergy, Met-Ed and Penelec. Hearings are scheduled for late August 2006 and a PPUC decision is expected early in the first quarter of 2007.

19

 
                   Under Pennsylvania's electric competition law, Penn is required to secure generation supply for customers who do not choose alternative suppliers for their electricity. On October 11, 2005, Penn filed a plan with the PPUC to secure electricity supply for its customers at set rates following the end of its transition period on December 31, 2006. Penn recommended that the RFP process cover the period January 1, 2007 through May 31, 2008. To the extent that an affiliate of Penn supplies a portion of the PLR load included in the RFP, authorization to make the affiliate sale must be obtained from the FERC. Hearings before the PPUC were held on January 10, 2006 with main briefs filed on January 27, 2006 and reply briefs filed on February 3, 2006. On February 16, 2006, the ALJ issued a Recommended Decision to adopt Penn's RFP process with modifications. On April 20, 2006, the PPUC approved the Recommended Decision with additional modifications to use an RFP process to obtain Penn's power supply requirements after 2006 through two separate solicitations. An initial solicitation was held for Penn in May 2006 with all tranches fully subscribed. On June 2, 2006, the PPUC approved the bid results for the first solicitation. On July 18, 2006, the second PLR solicitation was held for Penn. The tranches for the Residential Group and Small Commercial Group were fully subscribed. However, supply was only acquired for three of the five tranches for the Large Commercial Group. On July 20, 2006, the PPUC approved the submissions for the second bid. A residual solicitation is scheduled to be held on August 15, 2006 for the two remaining Large Commercial Group tranches. Acceptance of the winning bids is subject to approval by the PPUC.
 
                   On May 25, 2006, Penn filed a Petition for Review of the PPUC’s Orders of April 28, 2006 and May 4, 2006, which together decided the issues associated with Penn’s proposed Interim PLR Supply Plan. Penn has asked the Commonwealth Court to review the PPUC’s decision to deny its recovery of certain PLR costs via a reconciliation mechanism and its decision to impose a geographic limitation on the sources of alternative energy credits. On June 7, 2006, the PaDEP filed a Petition for Review appealing the PPUC’s ruling on the method by which alternative energy credits may be acquired and traded. Penn is unable to predict the outcome of this appeal.

NEW JERSEY
 
                    JCP&L is permitted to defer for future collection from customers the amounts by which its costs of supplying BGS to non-shopping customers and costs incurred under NUG agreements exceed amounts collected through BGS and NUGC rates and market sales of NUG energy and capacity. As of June 30, 2006, the accumulated deferred cost balance totaled approximately $638 million. New Jersey law allows for securitization of JCP&L's deferred balance upon application by JCP&L and a determination by the NJBPU that the conditions of the New Jersey restructuring legislation are met. On February 14, 2003, JCP&L filed for approval to securitize the July 31, 2003 deferred balance. On June 8, 2006, the NJBPU approved JCP&L’s request to issue securitization bonds associated with BGS stranded cost deferrals. On August 4, 2006, JCP&L Transition Funding II, a wholly owned subsidiary of JCP&L, secured pricing on the issuance of $182 million of transition bonds with a weighted average interest rate of 5.5%.
 
                   On December 2, 2005, JCP&L filed its request for recovery of $165 million of actual above-market NUG costs incurred from August 1, 2003 through October 31, 2005 and forecasted above-market NUG costs for November and December 2005. On February 23, 2006, JCP&L filed updated data reflecting actual amounts through December 31, 2005 of $154 million of costs incurred since July 31, 2003. On March 29, 2006, a pre-hearing conference was held with the presiding ALJ. A schedule for the proceeding was established, including a discovery period and evidentiary hearings scheduled for September 2006.
 
                   An NJBPU Decision and Order approving a Phase II Stipulation of Settlement and resolving the Motion for Reconsideration of the Phase I Order was issued on May 31, 2005. The Phase II Settlement includes a performance standard pilot program with potential penalties of up to 0.25% of allowable equity return. The Order requires that JCP&L file quarterly reliability reports (CAIDI and SAIFI information related to the performance pilot program) through December 2006 and updates to reliability related project expenditures until all projects are completed. The last of the quarterly reliability reports was submitted on June 12, 2006. As of June 30, 2006, there were no performance penalties issued by the NJBPU.
 
                   In a reaction to the higher closing prices of the 2006 BGS fixed rate auction, the NJBPU, on March 16, 2006, initiated a generic proceeding to evaluate the auction process and potential options for the future. On April 6, 2006, initial comments were submitted. A public meeting was held on April 21, 2006 and a legislative-type hearing was held on April 28, 2006. On June 21, 2006, the NJBPU approved the continued use of a descending block auction for the Fixed Price Residential Class. A final decision as to the procurement method for the Commercial Industrial Energy Price Class is expected in October 2006.
 
                    In accordance with an April 28, 2004 NJBPU order, JCP&L filed testimony on June 7, 2004 supporting a continuation of the current level and duration of the funding of TMI-2 decommissioning costs by New Jersey customers without a reduction, termination or capping of the funding. On September 30, 2004, JCP&L filed an updated TMI-2 decommissioning study. This study resulted in an updated total decommissioning cost estimate of $729 million (in 2003 dollars) compared to the estimated $528 million (in 2003 dollars) from the prior 1995 decommissioning study. The DRA filed comments on February 28, 2005 requesting that decommissioning funding be suspended. On March 18, 2005, JCP&L filed a response to those comments. A schedule for further proceedings has not yet been set.

20



On August 1, 2005, the NJBPU established a proceeding to determine whether additional ratepayer protections are required at the state level in light of the repeal of PUHCA pursuant to the EPACT. An NJBPU proposed rulemaking to address the issues was published in the NJ Register on December 19, 2005. The proposal would prevent a holding company that owns a gas or electric public utility from investing more than 25% of the combined assets of its utility and utility-related subsidiaries into businesses unrelated to the utility industry. A public hearing was held on February 7, 2006 and comments were submitted to the NJBPU. The NJBPU Staff issued a draft proposal on March 31, 2006 addressing various issues including access to books and records, ring-fencing, cross subsidization, corporate governance and related matters. With the approval of the NJBPU Staff, the affected utilities jointly submitted an alternative proposal on June 1, 2006. Comments on the alternative proposal were submitted on June 15, 2006. JCP&L is unable to predict the outcome of this proceeding.
 
                   On December 21, 2005, the NJBPU initiated a generic proceeding and requested comments in order to formulate an appropriate regulatory treatment for investment tax credits related to generation assets divested by New Jersey’s four electric utility companies. Comments were filed by the utilities and by the DRA. JCP&L was advised by the IRS on April 10, 2006 that the ruling was tentatively adverse. On April 28, 2006, the NJBPU directed JCP&L to withdraw its request for a private letter ruling on this issue, which had been previously filed with the IRS as ordered by the NJBPU. On May 11, 2006, after a JCP&L Motion for Reconsideration was denied by the NJBPU, JCP&L filed to withdraw the request for a private letter ruling. On July 19, 2006, the IRS acknowledged that the JCP&L ruling request was withdrawn.

FERC MATTERS

On November 1, 2004, ATSI filed with the FERC a request to defer approximately $54 million of costs to be incurred from 2004 through 2007 in connection with ATSI’s VMEP, which represents ATSI’s adoption of newly identified industry “best practices” for vegetation management. On March 4, 2005, the FERC approved ATSI’s request to defer the VMEP costs (approximately $33 million has been deferred as of June 30, 2006). On March 28, 2006, ATSI and MISO filed with the FERC a request to modify ATSI’s Attachment O formula rate to include revenue requirements associated with recovery of deferred VMEP costs over a five-year period. The requested effective date to begin recovery was June 1, 2006. Various parties filed comments responsive to the March 28, 2006 submission. The FERC conditionally approved the filing on May 22, 2006, subject to a compliance filing that ATSI made on June 13, 2006. A request for rehearing of the FERC’s May 22, 2006 Order was filed by a party, which ATSI answered. On July 21, 2006, the FERC issued an order stating that it needs more time to consider the matter. In light of that order, there is no time period by which the FERC must act on the pending rehearing request. On July 14, 2006, the FERC accepted ATSI’s June 13, 2006 compliance filing. The estimated annual revenues to ATSI from the VMEP cost recovery is $12 million.
 
                   On January 24, 2006, ATSI and MISO filed a request with the FERC to correct ATSI’s Attachment O formula rate to reverse revenue credits associated with termination of revenue streams from transitional rates stemming from FERC’s elimination of RTOR. Revenues formerly collected under these rates were included in, and served to reduce, ATSI’s zonal transmission rate under the Attachment O formula. Absent the requested correction, elimination of these revenue streams would not be fully reflected in ATSI’s formula rate until June 1, 2008. On March 16, 2006, the FERC approved the revenue credit correction without suspension, effective April 1, 2006. One party sought rehearing of the FERC's order. The request for rehearing of this order was denied on June 27, 2006. The FERC accepted MISO’s and ATSI’s revised tariff sheets for filing on June 7, 2006. The estimated annual revenue impact of the correction mechanism is approximately $40 million effective on June 1, 2006.
 
                   On November 18, 2004, the FERC issued an order eliminating the RTOR for transmission service between the MISO and PJM regions. The FERC also ordered the MISO, PJM and the transmission owners within MISO and PJM to submit compliance filings containing a SECA mechanism to recover lost RTOR revenues during a 16-month transition period from load serving entities. The FERC issued orders in 2005 setting the SECA for hearing. ATSI, JCP&L, Met-Ed, Penelec, and FES continue to be involved in the FERC hearings concerning the calculation and imposition of the SECA charges. The hearing was held in May 2006. Initial briefs were submitted on June 9, 2006, and reply briefs were filed on June 27, 2006. The FERC has ordered the Presiding Judge to issue an initial decision by August 11, 2006.

21


       On January 31, 2005, certain PJM transmission owners made three filings with the FERC pursuant to a settlement agreement previously approved by the FERC. JCP&L, Met-Ed and Penelec were parties to that proceeding and joined in two of the filings. In the first filing, the settling transmission owners submitted a filing justifying continuation of their existing rate design within the PJM RTO. In the second filing, the settling transmission owners proposed a revised Schedule 12 to the PJM tariff designed to harmonize the rate treatment of new and existing transmission facilities. Interventions and protests were filed on February 22, 2005. In the third filing, Baltimore Gas and Electric Company and Pepco Holdings, Inc. requested a formula rate for transmission service provided within their respective zones. On May 31, 2005, the FERC issued an order on these cases. First, it set for hearing the existing rate design and indicated that it will issue a final order within six months. American Electric Power Company, Inc. filed in opposition proposing to create a "postage stamp" rate for high voltage transmission facilities across PJM. Second, the FERC approved the proposed Schedule 12 rate harmonization. Third, the FERC accepted the proposed formula rate, subject to refund and hearing procedures. On June 30, 2005, the settling PJM transmission owners filed a request for rehearing of the May 31, 2005 order. On March 20, 2006, a settlement was filed with FERC in the formula rate proceeding that generally accepts the companies' formula rate proposal. The FERC issued an order approving this settlement on April 19, 2006. Hearings in the PJM rate design case concluded in April 2006. On July 13, 2006, an Initial Decision was issued by the ALJ. The ALJ adopted the Trial Staff’s position that the cost of all PJM transmission facilities should be recovered through a postage stamp rate. The ALJ recommended an April 1, 2006 effective date for this change in rate design. If the FERC accepts this recommendation, the transmission rate applicable to many load zones in PJM would increase. FirstEnergy believes that significant additional transmission revenues would have to be recovered from the JCP&L, Met-Ed and Penelec transmission zones within PJM. The Companies, as part of the Responsible Pricing Alliance, intend to submit a brief on exceptions within thirty days of the initial decision. Following submission of reply exceptions, the case is expected to be reviewed by the FERC with a decision anticipated in the fourth quarter of 2006.
 
                   On November 1, 2005, FES filed two power sales agreements for approval with the FERC. One power sales agreement provided for FES to provide the PLR requirements of the Ohio Companies at a price equal to the retail generation rates approved by the PUCO for a period of three years beginning January 1, 2006. The Ohio Companies will be relieved of their obligation to obtain PLR power requirements from FES if the Ohio CBP results in a lower price for retail customers. A similar power sales agreement between FES and Penn permits Penn to obtain its PLR power requirements from FES at a fixed price equal to the retail generation price during 2006. The PPUC approved Penn's plan with modifications on April 20, 2006 to use an RFP process to obtain its power supply requirements after 2006 through two separate solicitations. An initial solicitation was held for Penn in May 2006 with all tranches fully subscribed. On June 2, 2006, the PPUC approved the bid results for the first solicitation. On July 18, 2006, the second PLR solicitation was held for Penn. The tranches for the Residential Group and Small Commercial Group were fully subscribed. However, supply was only acquired for three of the five tranches for the Large Commercial Group. On July 20, 2006, the PPUC approved the submission for the second bid. A residual solicitation is scheduled to be held on August 15, 2006 for the two remaining Large Commercial Group tranches. Acceptance of the winning bids is subject to approval by the PPUC.
 
                   On December 29, 2005, the FERC issued an order setting the two power sales agreements for hearing. The order criticized the Ohio CBP, and required FES to submit additional evidence in support of the reasonableness of the prices charged in the power sales agreements. A pre-hearing conference was held on January 18, 2006 to determine the hearing schedule in this case. Under the procedural schedule approved in this case, FES expected an initial decision to be issued in late January 2007. However, on July 14, 2006, the Chief Judge granted the joint motion of FES and the Trial Staff to appoint a settlement judge in this proceeding. The procedural schedule has been suspended pending settlement discussions among the parties.

12. - NEW ACCOUNTING STANDARDS AND INTERPRETATIONS

FSP FIN 46(R)-6 - “Determining the Variability to Be Considered in Applying FASB interpretation No. 46(R)”

In April 2006, the FASB issued FSP FIN 46(R)-6 that addresses how a reporting enterprise should determine the variability to be considered in applying FASB interpretation No. 46 (revised December 2003). FirstEnergy adopted FIN 46(R) in the first quarter of 2004, consolidating VIE’s when FirstEnergy or one of its subsidiaries is determined to be the VIE’s primary beneficiary. The variability that is considered in applying interpretation 46(R) affects the determination of (a) whether the entity is a VIE; (b) which interests are variable interests in the entity; and (c) which party, if any, is the primary beneficiary of the VIE. This FSP states that the variability to be considered shall be based on an analysis of the design of the entity, involving two steps:

Step 1:
Analyze the nature of the risks in the entity
Step 2:
Determine the purpose(s) for which the entity was created and determine the variability the entity is designed to create and pass along to its interest holders.

22



After determining the variability to consider, the reporting enterprise can determine which interests are designed to absorb that variability. The guidance in this FSP is applied prospectively to all entities (including newly created entities) with which that enterprise first becomes involved and to all entities previously required to be analyzed under interpretation 46(R) when a reconsideration event has occurred after July 1, 2006. FirstEnergy does not expect this Statement to have a material impact on its financial statements.

FIN 48 - “Accounting for Uncertainty in Income Taxes - an interpretation of FASB Statement No. 109.”

In June 2006, the FASB issued FIN 48 which clarifies the accounting for uncertainty in income taxes recognized in an enterprise’s financial statements in accordance with FASB Statement No. 109, “Accounting for Income Taxes.” This interpretation prescribes a recognition threshold and measurement attribute for the financial statement recognition and measurement of a tax position taken or expected to be taken on a tax return. This interpretation also provides guidance on derecognition, classification, interest, penalties, accounting in interim periods, disclosure and transition. The evaluation of a tax position in accordance with this interpretation will be a two-step process. The first step will determine if it is more likely than not that a tax position will be sustained upon examination and should therefore be recognized. The second step will measure a tax position that meets the more likely than not recognition threshold to determine the amount of benefit to recognize in the financial statements. This interpretation is effective for fiscal years beginning after December 15, 2006. FirstEnergy is currently evaluating the impact of this Statement.

13. - SEGMENT INFORMATION
 
                   FirstEnergy has two reportable segments: regulated services and power supply management services. The aggregate “Other” segments do not individually meet the criteria to be considered a reportable segment. The regulated services segment's operations include the regulated sale of electricity and distribution and transmission services by its eight utility subsidiaries in Ohio, Pennsylvania and New Jersey. The power supply management services segment primarily consists of the subsidiaries (FES, FGCO, NGC and FENOC) that sell electricity in deregulated markets and operate and now own the generation facilities of OE, CEI, TE and Penn resulting from the deregulation of the Companies' electric generation business. “Other” consists of telecommunications services, the recently sold MYR (a construction service company) and retail natural gas operations (see Note 4). The assets and revenues for the other business operations are below the quantifiable threshold for operating segments for separate disclosure as “reportable segments.”
 
                   The regulated services segment designs, constructs, operates and maintains FirstEnergy's regulated transmission and distribution systems. Its revenues are primarily derived from electricity delivery and transition cost recovery. Assets of the regulated services segment as of June 30, 2005 included generating units that were leased or whose output had been sold to the power supply management services segment. The regulated services segment’s 2005 internal revenues represented the rental revenues for the generating unit leases which ceased in the fourth quarter of 2005 as a result of the intra-system generation asset transfers (see Note 14).
 
                  The power supply management services segment supplies all of the electric power needs of FirstEnergy’s end-use customers through retail and wholesale arrangements, including regulated retail sales to meet the PLR requirements of FirstEnergy's Ohio and Pennsylvania companies and competitive retail sales to customers primarily in Ohio, Pennsylvania, Maryland and Michigan. This business segment owns and operates FirstEnergy's generating facilities and purchases electricity from the wholesale market when needed to meet sales obligations. The segment's net income is primarily derived from all electric generation sales revenues less the related costs of electricity generation, including purchased power and net transmission, congestion and ancillary costs charged by PJM and MISO to deliver energy to retail customers.
 
                   Segment reporting for interim periods in 2005 was revised to conform to the current year business segment organization and operations and the reclassification of discontinued operations (see Note 4). Changes in the current year operations reporting reflected in the revised 2005 segment reporting primarily includes the transfer of retail transmission revenues and PJM/MISO transmission revenues and expenses associated with serving electricity load previously included in the regulated services segment to the power supply management services segment. In addition, as a result of the 2005 Ohio tax legislation reducing the effective state income tax rate, the calculated composite income tax rates used in the two reportable segments’ results for 2005 and 2006 have been changed to 40% from the 41% previously reported in their 2005 segment results. The net amounts of the changes in the 2005 reportable segments' income taxes reclassifications have been correspondingly offset in the 2005 "Reconciling Adjustments." FSG is being disclosed as a reportable segment due to its subsidiaries qualifying as held for sale. Interest expense on holding company debt and corporate support services revenues and expenses are included in "Reconciling Adjustments."

23




Segment Financial Information
 
 
 
Power
 
 
 
 
 
 
 
 
 
 
 
 
 
Supply
 
 
 
 
 
 
 
 
 
 
 
Regulated
 
Management
 
Facilities
 
 
 
Reconciling
 
 
 
Three Months Ended
 
Services
 
Services
 
Services
 
Other
 
Adjustments
 
Consolidated
 
 
 
(In millions)
 
June 30, 2006
 
 
 
 
 
 
 
 
 
 
 
 
 
External revenues
 
$
1,045
 
$
1,678
 
$
58
 
$
16
 
$
(11
)
$
2,786
 
Internal revenues
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Total revenues
 
 
1,045
 
 
1,678
 
 
58
 
 
16
 
 
(11
)
 
2,786
 
Depreciation and amortization
 
 
228
 
 
(36
)
 
-
 
 
1
 
 
5
 
 
198
 
Investment Income
 
 
75
 
 
2
 
 
-
 
 
1
 
 
(47
)
 
31
 
Net interest charges
 
 
96
 
 
54
 
 
1
 
 
1
 
 
21
 
 
173
 
Income taxes
 
 
155
 
 
90
 
 
1
 
 
2
 
 
(31
)
 
217
 
Net income
 
 
229
 
 
135
 
 
(11
)
 
(4
)
 
(45
)
 
304
 
Total assets
 
 
24,630
 
 
6,740
 
 
56
 
 
299
 
 
853
 
 
32,578
 
Total goodwill
 
 
5,916
 
 
24
 
 
-
 
 
-
 
 
-
 
 
5,940
 
Property additions
 
 
161
 
 
103
 
 
-
 
 
1
 
 
13
 
 
278
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
June 30, 2005
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
External revenues
 
$
1,226
 
$
1,416
 
$
59
 
$
135
 
$
7
 
$
2,843
 
Internal revenues
 
 
80
 
 
-
 
 
-
 
 
-
 
 
(80
)
 
-
 
Total revenues
 
 
1,306
 
 
1,416
 
 
59
 
 
135
 
 
(73
)
 
2,843
 
Depreciation and amortization
 
 
344
 
 
(16
)
 
-
 
 
-
 
 
7
 
 
335
 
Investment income
 
 
47
 
 
-
 
 
-
 
 
-
 
 
-
 
 
47
 
Net interest charges
 
 
99
 
 
9
 
 
-
 
 
2
 
 
51
 
 
161
 
Income taxes
 
 
193
 
 
(5
)
 
5
 
 
1
 
 
47
 
 
241
 
Income before discontinued operations
 
 
288
 
 
(5
)
 
(2
)
 
6
 
 
(108
)
 
179
 
Discontinued operations
 
 
-
 
 
-
 
 
-
 
 
(1
)
 
-
 
 
(1
)
Net income
 
 
288
 
 
(5
)
 
(2
)
 
5
 
 
(108
)
 
178
 
Total assets
 
 
28,454
 
 
1,601
 
 
78
 
 
512
 
 
566
 
 
31,211
 
Total goodwill
 
 
5,946
 
 
24
 
 
-
 
 
63
 
 
-
 
 
6,033
 
Property additions
 
 
158
 
 
66
 
 
-
 
 
2
 
 
7
 
 
233
 

Six Months Ended
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
June 30, 2006
 
 
 
 
 
 
 
 
 
 
 
 
 
External revenues
 
$
2,128
 
$
3,297
 
$
104
 
$
136
 
$
(34
)
$
5,631
 
Internal revenues
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Total revenues
 
 
2,128
 
 
3,297
 
 
104
 
 
136
 
 
(34
)
 
5,631
 
Depreciation and amortization
 
 
486
 
 
(11
)
 
-
 
 
2
 
 
10
 
 
487
 
Investment Income
 
 
137
 
 
17
 
 
-
 
 
1
 
 
(81
)
 
74
 
Net interest charges
 
 
189
 
 
103
 
 
1
 
 
2
 
 
38
 
 
333
 
Income taxes
 
 
299
 
 
117
 
 
1
 
 
(5
)
 
(61
)
 
351
 
Net income
 
 
440
 
 
175
 
 
(12
)
 
11
 
 
(89
)
 
525
 
Total assets
 
 
24,630
 
 
6,740
 
 
56
 
 
299
 
 
853
 
 
32,578
 
Total goodwill
 
 
5,916
 
 
24
 
 
-
 
 
-
 
 
-
 
 
5,940
 
Property additions
 
 
356
 
 
347
 
 
-
 
 
2
 
 
20
 
 
725
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
June 30, 2005
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
External revenues
 
$
2,442
 
$
2,793
 
$
102
 
$
247
 
$
9
 
$
5,593
 
Internal revenues
 
 
158
 
 
-
 
 
-
 
 
-
 
 
(158
)
 
-
 
Total revenues
 
 
2,600
 
 
2,793
 
 
102
 
 
247
 
 
(149
)
 
5,593
 
Depreciation and amortization
 
 
718
 
 
(3
)
 
-
 
 
1
 
 
13
 
 
729
 
Investment income
 
 
88
 
 
-
 
 
-
 
 
-
 
 
-
 
 
88
 
Net interest charges
 
 
197
 
 
19
 
 
-
 
 
3
 
 
113
 
 
332
 
Income taxes
 
 
350
 
 
(35
)
 
2
 
 
11
 
 
34
 
 
362
 
Income before discontinued operations
 
 
524
 
 
(51
)
 
(4
)
 
11
 
 
(160
)
 
320
 
Discontinued operations
 
 
-
 
 
-
 
 
13
 
 
5
 
 
-
 
 
18
 
Net income
 
 
524
 
 
(51
)
 
9
 
 
16
 
 
(160
)
 
338
 
Total assets
 
 
28,454
 
 
1,601
 
 
78
 
 
512
 
 
566
 
 
31,211
 
Total goodwill
 
 
5,946
 
 
24
 
 
-
 
 
63
 
 
-
 
 
6,033
 
Property additions
 
 
299
 
 
147
 
 
1
 
 
4
 
 
11
 
 
462
 
 
                    Reconciling adjustments to segment operating results from internal management reporting to consolidated external financial reporting primarily consist of interest expense related to holding company debt, corporate support services revenues and expenses, fuel marketing revenues (which are reflected as reductions to expenses for internal management reporting purposes) and elimination of intersegment transactions.

24



14. - FIRSTENERGY INTRA-SYSTEM GENERATION ASSET TRANSFERS
 
                   On May 13, 2005, Penn, and on May 18, 2005, the Ohio Companies, entered into certain agreements implementing a series of intra-system generation asset transfers that were completed in the fourth quarter of 2005. The asset transfers resulted in the respective undivided ownership interests of the Ohio Companies and Penn in FirstEnergy’s nuclear and non-nuclear generation assets being owned by NGC and FGCO, respectively. The generating plant interests transferred do not include leasehold interests of CEI, TE and OE in certain of the plants that are currently subject to sale and leaseback arrangements with non-affiliates.
 
                   On October 24, 2005, the Ohio Companies and Penn completed the intra-system transfer of non-nuclear generation assets to FGCO. Prior to the transfer, FGCO, as lessee under a Master Facility Lease with the Ohio Companies and Penn, leased, operated and maintained the non-nuclear generation assets that it now owns. The asset transfers were consummated pursuant to FGCO's purchase option under the Master Facility Lease.
 
                   On December 16, 2005, the Ohio Companies and Penn completed the intra-system transfer of their respective ownership in the nuclear generation assets to NGC through, in the case of OE and Penn, an asset spin-off by way of dividend and, in the case of CEI and TE, a sale at net book value. FENOC continues to operate and maintain the nuclear generation assets.
 
                    These transactions were pursuant to the Ohio Companies’ and Penn’s restructuring plans that were approved by the PUCO and the PPUC, respectively, under applicable Ohio and Pennsylvania electric utility restructuring legislation. Consistent with the restructuring plans, generation assets that had been owned by the Ohio Companies and Penn were required to be separated from the regulated delivery business of those companies through transfer to a separate corporate entity. The transactions essentially completed the divestitures contemplated by the restructuring plans by transferring the ownership interests to NGC and FGCO without impacting the operation of the plants.
 
15. - JCP&L RESTATEMENT

JCP&L's earnings for the three months and six months ended June 30, 2005 have been restated to reflect the results of a tax audit by the State of New Jersey, in which JCP&L became aware that the New Jersey Transitional Energy Facilities Assessment (TEFA) is not an allowable deduction for state income tax purposes. JCP&L had incorrectly claimed a state income tax deduction for TEFA payments and as a result, income taxes and interest expense were understated by $0.4 million and $0.6 million, respectively, in the second quarter of 2005 and understated by $0.9 million and $1.2 million, respectively, in the first six months of 2005. The effects of these adjustments on JCP&L's Consolidated Statements of Income for the three months and six months ended June 30, 2005 are as follows:

 
 
Three Months
 
Six Months
 
 
As Previously
 
 
As
 
As Previously
 
As
 
 
Reported
 
 
Restated
 
Reported
 
Restated
 
 
(In millions)
Operating Revenues
$
595.3
 
$
595.3
 
$
1,124.4
 
$
1,124.4
Operating Expenses and
 
 
 
 
 
 
 
 
 
 
 
Taxes
 
521.2
 
 
521.6
 
 
1,015.9
 
 
1,016.8
Operating Income
 
74.1
 
 
73.7
 
 
108.5
 
 
107.6
Other Income
 
0.3
 
 
0.3
 
 
0.3
 
 
0.3
Net Interest Charges
 
19.1
 
 
19.7
 
 
39.0
 
 
40.2
Net Income
$
55.3
 
$
54.3
 
$
69.8
 
$
67.7
Earnings Applicable
 
 
 
 
 
 
 
 
 
 
 
to Common Stock
$
55.2
 
$
54.2
 
$
69.6
 
$
67.5

These adjustments were not material to FirstEnergy's consolidated financial statements, nor JCP&L's Consolidated Balance Sheets or Consolidated Statements of Cash Flows.

16. - SUBSEQUENT EVENTS

Pennsylvania Law Change

On July 12, 2006, the Governor of Pennsylvania signed House Bill 859, which increases the net operating loss deduction allowed for the corporate net income tax from $2 million to $3 million, or the greater of 12.5% of taxable income. As a result, FirstEnergy expects to recognize a net operating loss benefit of $2.2 million (net of federal tax benefit) in the third quarter of 2006.

25



New Jersey Law Change

On July 8, 2006, the Governor of New Jersey signed tax legislation that increased the current New Jersey Corporate Business tax by an additional 4% surtax, which increases the effective tax rate from 9% to 9.36%. This increase applies to JCP&L’s 2006 through 2008 tax years and is not expected to have a material impact on FirstEnergy’s or JCP&L’s results of operations.


26


 

FIRSTENERGY CORP.
 
CONSOLIDATED STATEMENTS OF INCOME
 
(Unaudited)
 
 
 
 
 
 
 
 
 
 
 
 
 
Three Months Ended
 
Six Months Ended
 
 
 
June 30,
 
June 30,
 
 
 
2006
 
2005
 
2006
 
2005
 
 
 
(In millions, except per share amounts)
 
REVENUES:
 
 
 
 
 
 
 
 
 
Electric utilities
 
$
2,341
 
$
2,283
 
$
4,681
 
$
4,550
 
Unregulated businesses
 
 
445
 
 
560
 
 
950
 
 
1,043
 
 Total revenues
 
 
2,786
 
 
2,843
 
 
5,631
 
 
5,593
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
EXPENSES:
 
 
 
 
 
 
 
 
 
 
 
 
 
Fuel and purchased power
 
 
992
 
 
933
 
 
1,990
 
 
1,828
 
Other operating expenses
 
 
760
 
 
873
 
 
1,653
 
 
1,757
 
Provision for depreciation
 
 
144
 
 
149
 
 
292
 
 
292
 
Amortization of regulatory assets
 
 
199
 
 
306
 
 
421
 
 
617
 
Deferral of new regulatory assets
 
 
(145
)
 
(120
)
 
(226
)
 
(180
)
General taxes
 
 
173
 
 
168
 
 
366
 
 
353
 
 Total expenses
 
 
2,123
 
 
2,309
 
 
4,496
 
 
4,667
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
OPERATING INCOME
 
 
663
 
 
534
 
 
1,135
 
 
926
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
OTHER INCOME (EXPENSE):
 
 
 
 
 
 
 
 
 
 
 
 
 
Investment income
 
 
31
 
 
47
 
 
74
 
 
88
 
Interest expense
 
 
(178
)
 
(162
)
 
(343
)
 
(326
)
Capitalized interest
 
 
7
 
 
5
 
 
14
 
 
4
 
Subsidiaries’ preferred stock dividends
 
 
(2
)
 
(4
)
 
(4
)
 
(10
)
 Net interest charges
 
 
(142
)
 
(114
)
 
(259
)
 
(244
)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
INCOME TAXES
 
 
217
 
 
241
 
 
351
 
 
362
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
INCOME BEFORE DISCONTINUED OPERATIONS
 
 
304
 
 
179
 
 
525
 
 
320
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Discontinued operations (net of income tax benefits of
 
 
 
 
 
 
 
 
 
 
 
 
 
$1 million and $9 million in the three months and
 
 
 
 
 
 
 
 
 
 
 
 
 
six months ended June 30, 2005, respectively) (Note 4)
 
 
-
 
 
(1
)
 
-
 
 
18
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
NET INCOME
 
$
304
 
$
178
 
$
525
 
$
338
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
BASIC EARNINGS PER SHARE OF COMMON STOCK:
 
 
 
 
 
 
 
 
 
 
 
 
 
Earnings before discontinued operations (Note 2)
 
$
0.92
 
$
0.54
 
$
1.59
 
$
0.98
 
Discontinued operations (Note 4)
 
 
-
 
 
-
 
 
-
 
 
0.05
 
Net earnings per basic share
 
$
0.92
 
$
0.54
 
$
1.59
 
$
1.03
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
WEIGHTED AVERAGE NUMBER OF BASIC SHARES
 
 
 
 
 
 
 
 
 
 
 
 
 
OUTSTANDING
 
 
328
 
 
328
 
 
328
 
 
328
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
DILUTED EARNINGS PER SHARE OF COMMON STOCK:
 
 
 
 
 
 
 
 
 
 
 
 
 
Earnings before discontinued operations (Note 2)
 
$
0.91
 
$
0.54
 
$
1.58
 
$
0.97
 
Discontinued operations (Note 4)
 
 
-
 
 
-
 
 
-
 
 
0.05
 
Net earnings per diluted share
 
$
0.91
 
$
0.54
 
$
1.58
 
$
1.02
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
WEIGHTED AVERAGE NUMBER OF DILUTED SHARES
 
 
 
 
 
 
 
 
 
 
 
 
 
OUTSTANDING
 
 
330
 
 
330
 
 
330
 
 
330
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
DIVIDENDS DECLARED PER SHARE OF COMMON STOCK
 
$
0.45
 
$
0.4125
 
$
0.90
 
$
0.825
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 The preceding Notes to Consolidated Financial Statements as they relate to FirstEnergy Corp. are an integral part of these statements.
 
 
 
27

 

FIRSTENERGY CORP.
 
CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME
 
(Unaudited)
 
                   
   
Three Months Ended
 
Six Months Ended
 
   
June 30,
 
June 30,
 
   
2006
 
2005
 
2006
 
2005
 
   
(In millions)
 
                   
NET INCOME
 
$
304
 
$
178
 
$
525
 
$
338
 
                           
OTHER COMPREHENSIVE INCOME (LOSS):
                         
Unrealized gain (loss) on derivative hedges
   
36
   
(6
)
 
73
   
1
 
Unrealized gain (loss) on available for sale securities
   
(24
)
 
(16
)
 
13
   
(24
)
 Other comprehensive income (loss)
   
12
   
(22
)
 
86
   
(23
)
Income tax expense (benefit) related to other
                         
 comprehensive income
   
4
   
(6
)
 
31
   
(6
)
 Other comprehensive income (loss), net of tax
   
8
   
(16
)
 
55
   
(17
)
                           
COMPREHENSIVE INCOME
 
$
312
 
$
162
 
$
580
 
$
321
 
                           
The preceding Notes to Consolidated Financial Statements as they relate to FirstEnergy Corp. are an integral part of these statements.
 
                         
 
 

 
 
 
 
28

 
FIRSTENERGY CORP.
CONSOLIDATED BALANCE SHEETS
(Unaudited)
         
June 30,
 
December 31,
         
2006
 
2005
         
(In millions)
ASSETS
         
                   
CURRENT ASSETS:
         
 
Cash and cash equivalents
$
583
 
$
64
 
Receivables -
         
   
Customers (less accumulated provisions of $36 million and
         
     
$38 million, respectively, for uncollectible accounts)
 
1,173
   
1,293
   
Other (less accumulated provisions of $27 million
         
     
for uncollectible accounts in both periods)
 
173
   
205
 
Materials and supplies, at average cost
 
629
   
518
 
Prepayments and other
 
254
 
 
237
         
 
2,812
 
 
2,317
PROPERTY, PLANT AND EQUIPMENT:
         
 
In service
 
23,661
 
 
22,893
 
Less - Accumulated provision for depreciation
 
9,883
 
 
9,792
           
13,778
   
13,101
 
Construction work in progress
 
642
 
 
897
         
 
14,420
 
 
13,998
INVESTMENTS:
         
 
Nuclear plant decommissioning trusts
 
1,796
 
 
1,752
 
Investments in lease obligation bonds
 
830
 
 
890
 
Other
 
 
745
 
 
709
         
 
3,371
 
 
3,351
DEFERRED CHARGES AND OTHER ASSETS:
         
 
Goodwill
 
5,940
 
 
6,010
 
Regulatory assets
 
4,396
 
 
4,486
 
Prepaid pension costs
 
1,013
 
 
1,023
 
Other
 
 
626
 
 
656
 
 
 
 
 
 
11,975
 
 
12,175
         
$
32,578
 
$
31,841
LIABILITIES AND CAPITALIZATION
         
                   
CURRENT LIABILITIES:
         
 
Currently payable long-term debt
$
2,004
 
$
2,043
 
Short-term borrowings
 
1,101
 
 
731
 
Accounts payable
 
682
 
 
727
 
Accrued taxes
 
750
 
 
800
 
Other
 
 
852
 
 
1,152
         
 
5,389
 
 
5,453
CAPITALIZATION:
         
 
Common stockholders’ equity -
         
   
Common stock, $.10 par value, authorized 375,000,000 shares -
         
     
329,836,276 shares outstanding
 
33
 
 
33
   
Other paid-in capital
 
7,052
 
 
7,043
   
Accumulated other comprehensive income (loss)
 
35
 
 
(20)
   
Retained earnings
 
2,385
 
 
2,159
   
Unallocated employee stock ownership plan common stock -
 
 
     
     
960,651 and 1,444,796 shares, respectively
 
(17)
 
 
(27)
       
Total common stockholders' equity
 
9,488
 
 
9,188
 
Preferred stock of consolidated subsidiaries
 
154
 
 
184
 
Long-term debt and other long-term obligations
 
8,729
 
 
8,155
         
 
18,371
 
 
17,527
NONCURRENT LIABILITIES:
         
 
Accumulated deferred income taxes
 
2,792
 
 
2,726
 
Asset retirement obligations
 
1,160
 
 
1,126
 
Power purchase contract loss liability
 
1,123
 
 
1,226
 
Retirement benefits
 
1,355
 
 
1,316
 
Lease market valuation liability
 
809
 
 
851
 
Other
 
 
1,579
 
 
1,616
         
 
8,818
 
 
8,861
COMMITMENTS, GUARANTEES AND CONTINGENCIES (Note 10)
 
   
 
 
         
$
32,578
 
$
31,841
                   
The preceding Notes to Consolidated Financial Statements as they relate to FirstEnergy Corp. are an integral part of these balance sheets.
 
 
29

 

FIRSTENERGY CORP.
 
CONSOLIDATED STATEMENTS OF CASH FLOWS
 
(Unaudited)
 
          
 
Six Months Ended
 
 
June 30,
 
 
2006
 
2005
 
 
(In millions)
 
             
CASH FLOWS FROM OPERATING ACTIVITIES:
           
Net income
$
525
 
$
338
 
Adjustments to reconcile net income to net cash from operating activities -
           
Provision for depreciation
 
292
   
292
 
Amortization of regulatory assets
 
421
   
617
 
Deferral of new regulatory assets
 
(226
)
 
(180
)
Nuclear fuel and lease amortization
 
30
   
38
 
Deferred purchased power and other costs
 
(239
)
 
(210
)
Deferred income taxes and investment tax credits, net
 
32
   
62
 
Deferred rents and lease market valuation liability
 
(105
)
 
(101
)
Accrued compensation and retirement benefits
 
33
   
11
 
Commodity derivative transactions, net
 
25
   
(6
)
Income from discontinued operations
 
-
   
(18
)
Cash collateral
 
(55
)
 
22
 
Decrease (increase) in operating assets -
           
Receivables
 
83
   
(135
)
Materials and supplies
 
(71
)
 
(52
)
Prepayments and other current assets
 
(81
)
 
(159
)
Increase (decrease) in operating liabilities -
         
Accounts payable
 
(40
)
 
104
 
Accrued taxes
 
(45
)
 
39
 
Accrued interest
 
-
   
(4
)
Electric service prepayment programs
 
(29
)
 
226
 
Other
 
1
   
37
 
Net cash provided from operating activities
 
551
   
921
 
             
CASH FLOWS FROM FINANCING ACTIVITIES:
           
New Financing -
           
Long-term debt
 
1,053
   
245
 
Short-term borrowings, net
 
371
   
386
 
Redemptions and Repayments -
           
Preferred stock
 
(30
)
 
(140
)
Long-term debt
 
(487
)
 
(689
)
Net controlled disbursement activity
 
5
   
-
 
Common stock dividend payments
 
(296
)
 
(270
)
Net cash provided from (used for) financing activities
 
616
   
(468
)
             
CASH FLOWS FROM INVESTING ACTIVITIES:
           
Property additions
 
(725
)
 
(462
)
Proceeds from asset sales
 
59
   
61
 
Proceeds from nuclear decommissioning trust fund sales
 
925
   
608
 
Investments in nuclear decommissioning trust funds
 
(932
)
 
(659
)
Cash investments
 
40
   
35
 
Other
 
(15
)
 
(39
)
Net cash used for investing activities
 
(648
)
 
(456
)
             
Net increase (decrease) in cash and cash equivalents
 
519
   
(3
)
Cash and cash equivalents at beginning of period
 
64
   
53
 
Cash and cash equivalents at end of period
$
583
 
$
50
 
             
The preceding Notes to Consolidated Financial Statements as they relate to FirstEnergy Corp. are an integral part of these statements.
 
 
30



 

Report of Independent Registered Public Accounting Firm









To the Stockholders and Board of
Directors of FirstEnergy Corp.:

We have reviewed the accompanying consolidated balance sheet of FirstEnergy Corp. and its subsidiaries as of June 30, 2006, and the related consolidated statements of income and comprehensive income for each of the three-month and six-month periods ended June 30, 2006 and 2005 and the consolidated statement of cash flows for the six-month period ended June 30, 2006 and 2005. These interim financial statements are the responsibility of the Company’s management.

We conducted our review in accordance with the standards of the Public Company Accounting Oversight Board (United States). A review of interim financial information consists principally of applying analytical procedures and making inquiries of persons responsible for financial and accounting matters. It is substantially less in scope than an audit conducted in accordance with the standards of the Public Company Accounting Oversight Board, the objective of which is the expression of an opinion regarding the financial statements taken as a whole. Accordingly, we do not express such an opinion.

Based on our review, we are not aware of any material modifications that should be made to the accompanying consolidated interim financial statements for them to be in conformity with accounting principles generally accepted in the United States of America.

We have previously audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated balance sheet as of December 31, 2005, and the related consolidated statements of income, capitalization, common stockholders’ equity, preferred stock, cash flows and taxes for the year then ended, management’s assessment of the effectiveness of the Company’s internal control over financial reporting as of December 31, 2005 and the effectiveness of the Company’s internal control over financial reporting as of December 31, 2005; and in our report [which contained references to the Company’s change in its method of accounting for asset retirement obligations as of January 1, 2003 and conditional asset retirement obligations as of December 31, 2005 as discussed in Note 2(K) and Note 12 to those consolidated financial statements and the Company’s change in its method of accounting for the consolidation of variable interest entities as of December 31, 2003 as discussed in Note 7 to those consolidated financial statements] dated February 27, 2006, we expressed unqualified opinions thereon. The consolidated financial statements and management’s assessment of the effectiveness of internal control over financial reporting referred to above are not presented herein. In our opinion, the information set forth in the accompanying consolidated balance sheet as of December 31, 2005, is fairly stated in all material respects in relation to the consolidated balance sheet from which it has been derived.




PricewaterhouseCoopers LLP
Cleveland, Ohio
August 4, 2006



31


FIRSTENERGY CORP.

MANAGEMENT’S DISCUSSION AND ANALYSIS OF
RESULTS OF OPERATIONS AND FINANCIAL CONDITION


EXECUTIVE SUMMARY

Net income in the second quarter of 2006 was $304 million, or basic earnings of $0.92 per share of common stock ($0.91 diluted), compared with net income of $178 million, or basic and diluted earnings of $0.54 per share of common stock in the second quarter of 2005. FirstEnergy’s earnings increase was driven primarily by increased electric sales revenues, reduced nuclear operating expenses, cost deferrals authorized by the PUCO and PPUC, and reduced transition cost amortization for the Ohio Companies. Earnings in the second quarter and the first six months of 2005 were reduced by $0.22 per share of common stock due to additional income tax expense of $71 million from the enactment of tax legislation in Ohio. Net income in the second quarter and the first six months of 2006 reflected net after-tax charges associated with the sale and impairment of non-core assets of $9 million (or $0.03 per share) and $11 million (or $0.03 per share), respectively. The following Non-GAAP Reconciliation displays the unusual items resulting in the difference between GAAP and non-GAAP earnings.

Reconciliation of non-GAAP to GAAP
 
2006
 
2005
 
 
 
After-tax
 
Basic
 
After-tax
 
Basic
 
 
 
Amount
 
Earnings
 
Amount
 
Earnings
 
Three Months Ended June 30,
 
(Millions)
 
Per Share
 
(Millions)
 
Per Share
 
Earnings Before Unusual Items (Non-GAAP)
 
$
313
 
$
0.95
 
$
233
 
$
0.71
 
Unusual Items:
 
 
                   
 
Non-core asset sales/impairments
 
 
(9
)
 
(0.03
)
 
-
   
-
 
New regulatory assets - JCP&L rate settlement
 
 
-
   
-
   
16
   
0.05
 
Ohio tax write-off
 
 
-
   
-
   
(71
)
 
(0.22
)
Net Income (GAAP)
 
$
304
 
$
0.92
 
$
178
 
$
0.54
 
 
 
 
                   
 
Six Months Ended June 30,
 
 
                   
 
Earnings Before Unusual Items (Non-GAAP)
 
$
536
 
$
1.62
 
$
388
 
$
1.18
 
Unusual Items:
 
 
                   
 
Non-core asset sales/impairments
 
 
(11
)
 
(0.03
)
 
22
   
0.07
 
Sammis plant New Source Review settlement
 
 
-
   
-
   
(14
)
 
(0.04
)
Davis-Besse NRC fine
 
 
-
   
-
   
(3
)
 
(0.01
)
New regulatory assets - JCP&L rate settlement
 
 
-
   
-
   
16
   
0.05
 
Ohio tax write-off
 
 
-
   
-
   
(71
)
 
(0.22
)
Net Income (GAAP)
 
$
525
 
$
1.59
 
$
338
 
$
1.03
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

The Non-GAAP measure above, earnings before unusual items, is not calculated in accordance with GAAP because it excludes the impact of "unusual items." Unusual items reflect the impact on earnings of events that are not routine or for which FirstEnergy believes the financial impact will disappear or become immaterial within a near-term finite period. By removing the earnings effect of such issues that have been resolved or are expected to be resolved over the near term, management and investors can better measure FirstEnergy’s business and earnings potential. In particular, the non-core asset sales item refers to a finite set of energy-related assets that had been previously disclosed as held for sale, a substantial portion of which has already been sold. Similarly, the NRC fine in 2005 and further litigation settlements similar to the class action settlements in 2005 are not reasonably expected over the near term. Furthermore, FirstEnergy believes presenting normalized earnings calculated in this manner provides useful information to investors in evaluating the ongoing results of FirstEnergy’s businesses over the longer term and assists investors in comparing FirstEnergy’s operating performance to the operating performance of others in the energy sector.

Total electric generation sales were up by 3.9% over last year’s second quarter. For the six months ended June 30, 2006, electric generation sales rose 3.0% compared to the same period last year. The increase for both periods was primarily due to the return of customers to the Ohio Companies from third-party suppliers that exited the Ohio marketplace. Electric distribution deliveries were down 1.8% and 2.2% for the quarter and year-to-date periods ending June 30, reflecting milder weather conditions in 2006.

FirstEnergy's generating fleet produced a second quarter record 20.3 billion KWH during the second quarter of 2006 compared to 19.1 billion KWH in the second quarter of 2005. FirstEnergy's non-nuclear fleet produced a record 13.4 billion KWH, while its nuclear facilities produced 6.9 billion KWH.

32

 
                   Ohio Supreme Court Decision - On May 3, 2006, the Ohio Supreme Court affirmed, in all but one aspect, the provisions of FirstEnergy's RSP for its Ohio customers. An issue related to customer pricing options was remanded to the PUCO for further consideration. The Court found that FirstEnergy must provide an alternative market-based offering to customers in addition to that which they already have through their rate stabilization price, even if the alternative is higher than that offered through the RSP. On July 20, 2006, FirstEnergy filed a notice with the PUCO to address this issue through a proposed RFP program under which Ohio customers would have the opportunity to switch to alternative generation suppliers at prices established through the RFP program. FirstEnergy also provided notice of potential termination of certain portions of the RSP in the event that the issue is not resolved within a reasonable time frame or if modifications to the RSP are not acceptable. On July 26, 2006, the PUCO directed FirstEnergy to file within 45 days its plan to address the Court’s concern.

Pennsylvania Rate Matters - On May 31, 2006, the ALJ in the Met-Ed and Penelec rate transition plan filing established a procedural schedule with a goal of reaching a recommended decision in this proceeding by November 8, 2006. In accordance with this schedule, intervening parties submitted their written testimony by July 10, 2006. Ten public input hearings were held in various locations throughout the Met-Ed and Penelec service areas between June 20, 2006 and July 20, 2006.

Met-Ed and Penelec Transmission Charges - On May 4, 2006, the PPUC granted authority for Met-Ed and Penelec to defer, for accounting and financial reporting purposes, certain incremental transmission charges during 2006. The PPUC order allows Met-Ed and Penelec to defer, commencing January 1, 2006, the costs that are incremental to the levels currently reflected in the transmission component of Met-Ed’s and Penelec’s base rate tariffs. Recovery of the deferred costs will be considered in their pending comprehensive rate transition plan filing.
 
                   Penn RFP - On June 2, 2006, the PPUC approved the bid results for the first bid. On July 18, 2006, the second PLR bid process was held for Penn. On July 20, 2006, the PPUC approved the submissions for the second bid. As a result of bids one and two, supply has been successfully acquired for all seven tranches of the Residential Group and all six of the Small Commercial Group. However, supply has only been acquired for three of the five tranches for the Large Commercial Group. Therefore, a residual third bid is scheduled to be held on August 15, 2006 for the two remaining Large Commercial Group tranches.
 
                   Environmental Update - In June 2006, FirstEnergy finalized its air quality compliance strategy for 2006 through 2011. The program, which is expected to cost approximately $1.7 billion with the majority of those expenditures occurring between 2007 and 2009, is consistent with previous estimates and assumptions reflected in FirstEnergy’s long-term financial planning for air and water quality and other environmental matters.
 
                   Share Repurchase Program - On June 20, 2006, FirstEnergy's Board of Directors authorized a share repurchase program for up to 12 million shares of common stock. At management’s discretion, shares may be acquired on the open market or through privately negotiated transactions, subject to market conditions and other factors. The Board’s authorization of the repurchase program does not require FirstEnergy to purchase any shares and the program may be terminated at any time. The 12 million shares represent 3.6% of the approximately 330 million shares of common stock currently outstanding.
 
                   OE Senior Notes Offering - On June 26, 2006, OE issued $600 million of unsecured senior notes, comprised of $250 million due 2016 and $350 million due 2036. Proceeds from these offerings were used in July 2006 to repurchase $500 million of OE’s common stock from FirstEnergy, to redeem $61 million of OE’s preferred stock and to reduce short-term debt. FirstEnergy primarily used the proceeds to redeem, on July 31, 2006, $400 million principal amount of its $1 billion, 5.5% Notes, Series A, in advance of the November 15, 2006 maturity date. This represents an important part of FirstEnergy’s 2006 financing strategy to obtain additional financing flexibility at the holding company level and to capitalize its regulated utilities more appropriately from a regulatory context.
 
                    JCP&L Senior Notes Offering - On May 12, 2006, JCP&L issued $200 million of 6.40% secured Senior Notes due 2036. The proceeds of the offering were used to repay at maturity $150 million aggregate principal amount of JCP&L’s 6.45% Senior Notes due May 15, 2006 and for general corporate purposes.
 
                    JCP&L Securitization - On June 8, 2006, the NJBPU approved JCP&L's request to issue securitization bonds associated with BGS stranded cost deferrals. On August 4, 2006, JCP&L Transition Funding II, a wholly owned subsidiary of JCP&L, secured pricing on the issuance of $182 million of transition bonds with a weighted average interest rate of 5.5%.
 
                    New Coal Supply Agreement - On June 22, 2006, FGCO entered into a new coal supply agreement with CONSOL Energy, Inc. under which CONSOL will supply a total of more than 128 million tons of high-Btu coal to FirstEnergy for a 20-year period beginning in 2009. The new agreement replaces an existing coal supply agreement that took effect in January 2003 and ran through 2020. Under the new agreement, CONSOL will increase its coal shipments by approximately 2 million tons per year.

33


 
                   Ratified Contract Agreements - On May 11, 2006, employees represented by Local 270 of the Utility Workers Union of America (UWUA) voted to ratify a five-year contract agreement. UWUA Local 270 represents approximately 1,075 linemen, substation electricians, meter readers, and support personnel in the greater Cleveland area. On May 26, 2006, employees of Penelec represented by the International Brotherhood of Electrical Workers (IBEW) Local 459 ratified a three-year collective bargaining agreement. IBEW Local 459 includes 482 linemen, substation electricians, meter readers and support personnel.

FIRSTENERGY’S BUSINESS
 
                   FirstEnergy is a public utility holding company headquartered in Akron, Ohio that operates primarily through two core business segments (see Results of Operations).


                   Other operating segments provide a wide range of services, including heating, ventilation, air-conditioning, refrigeration, electrical and facility control systems, high-efficiency electrotechnologies and telecommunication services. FirstEnergy is in the process of divesting its remaining non-core businesses (see Note 4). The assets and revenues for the other business operations are below the quantifiable threshold for separate disclosure as “reportable operating segments”.

FIRSTENERGY INTRA-SYSTEM GENERATION ASSET TRANSFERS
 
                    In 2005, the Ohio Companies and Penn entered into certain agreements implementing a series of intra-system generation asset transfers that were completed in the fourth quarter of 2005. The asset transfers resulted in the respective undivided ownership interests of the Ohio Companies and Penn in FirstEnergy’s nuclear and non-nuclear generation assets being owned by NGC and FGCO, respectively. The generating plant interests transferred do not include leasehold interests of CEI, TE and OE in certain of the plants that are currently subject to sale and leaseback arrangements with non-affiliates.
 
                    On October 24, 2005, the Ohio Companies and Penn completed the intra-system transfer of non-nuclear generation assets to FGCO. Prior to the transfer, FGCO, as lessee under a Master Facility Lease with the Ohio Companies and Penn, leased, operated and maintained the non-nuclear generation assets that it now owns. The asset transfers were consummated pursuant to FGCO's purchase option under the Master Facility Lease.
 
                   On December 16, 2005, the Ohio Companies and Penn completed the intra-system transfer of their respective ownership in the nuclear generation assets to NGC through, in the case of OE and Penn, an asset spin-off by way of dividend and, in the case of CEI and TE, a sale at net book value. FENOC continues to operate and maintain the nuclear generation assets.
 
                   These transactions were pursuant to the Ohio Companies’ and Penn’s restructuring plans that were approved by the PUCO and the PPUC, respectively, under applicable Ohio and Pennsylvania electric utility restructuring legislation. Consistent with the restructuring plans, generation assets that had been owned by the Ohio Companies and Penn were required to be separated from the regulated delivery business of those companies through transfer to a separate corporate entity. The transactions essentially completed the divestitures contemplated by the restructuring plans by transferring the ownership interests to NGC and FGCO without impacting the operation of the plants. The transfers were intercompany transactions and, therefore, had no impact on FirstEnergy’s consolidated results.

34



RESULTS OF OPERATIONS

The financial results discussed below include revenues and expenses from transactions among FirstEnergy's business segments. A reconciliation of segment financial results is provided in Note 13 to the consolidated financial statements. The FSG business segment is included in “Other and Reconciling Adjustments” in this discussion due to its
immaterial impact on current period financial results, but is presented separately in segment information provided in Note 13 to the consolidated financial statements. Net income (loss) by major business segment was as follows:

 
 
 
 
Three Months Ended June 30,
 
Six Months Ended June 30,
 
 
 
 
 
 
 
Increase
 
 
 
Increase
 
 
 
 
 
2006
 
2005
 
(Decrease)
 
2006
 
2005
 
(Decrease)
 
 
 
 
 
(In millions, except per share amounts)
 
Net Income (Loss)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
By Business Segment:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Regulated Services
 
 
 
 
$
229
 
$
288
 
$
(59
)
$
440
 
$
524
 
$
(84
)
Power supply management services
 
 
 
 
 
135
 
 
(5
 
140
 
 
175
 
 
(51
)
 
226
 
Other and reconciling adjustments*
 
 
 
 
 
(60
)
 
(105
)
 
45
 
 
(90
)
 
(135
)
 
45
 
Total
 
 
 
 
$
304
 
$
178
 
$
126
 
$
525
 
$
338
 
$
187
 
 
 
 
 
 
 
   
 
 
 
 
   
 
   
 
 
 
 
   
Basic Earnings Per Share:
 
 
 
 
 
   
 
 
 
 
   
 
   
 
 
 
 
   
Income before discontinued operations
 
 
 
 
$
0.92
 
$
0.54
 
$
0.38
 
$
1.59
 
$
0.98
 
$
0.61
 
Discontinued operations
 
 
 
 
 
-
   
-
 
 
-
   
-
   
0.05
 
 
(0.05
)
Net earnings per basic share
 
 
 
 
$
0.92
 
$
0.54
 
$
0.38
 
$
1.59
 
$
1.03
 
$
0.56
 
 
 
 
 
 
 
   
 
 
 
 
   
 
   
 
 
 
 
   
Diluted Earnings Per Share:
 
 
 
 
 
   
 
 
 
 
   
 
   
 
 
 
 
   
Income before discontinued operations
 
 
 
 
$
0.91
 
$
0.54
 
$
0.37
 
$
1.58
 
$
0.97
 
$
0.61
 
Discontinued operations
 
 
 
 
 
-
   
-
 
 
-
   
-
   
0.05
 
 
(0.05
)
Net earnings per diluted share
 
 
 
 
$
0.91
 
$
0.54
 
$
0.37
 
$
1.58
 
$
1.02
 
$
0.56
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
*
Represents other operating segments and reconciling items including interest expense on holding company debt and corporate support services revenues and expenses.

Net income in the second quarter and the first six months of 2006 included net losses associated with the sale and impairment of non-core assets of $9 million (or $0.03 per share) and $11 million (or $0.03 per share), respectively.
 
                   Net income in the second quarter of 2005 included a net gain resulting from the JCP&L rate settlement of $16 million (or $0.05 per share) and additional income tax expense of $71 million (or $0.22 per share) from the enactment of tax legislation in Ohio. In the first six months of 2005, net income was also increased by $0.02 per share from the combined impact of $0.07 per share of gains from the sale of non-core assets, offset by $0.04 per share of expense associated with the W. H. Sammis Plant New Source Review settlement and $0.01 per share of expense related to the fine by the NRC regarding the Davis-Besse Nuclear Power Station.

35



Summary of Results of Operations - Second Quarter of 2006 Compared with the Second Quarter of 2005

Financial results for FirstEnergy's major business segments in the second quarter of 2006 and 2005 were as follows:

 
 
 
 
Power
 
 
 
 
 
 
 
 
 
Supply
 
Other and
 
 
 
 
 
Regulated
 
Management
 
Reconciling
 
FirstEnergy
 
2nd Quarter 2006 Financial Results
 
Services
 
Services
 
Adjustments
 
Consolidated
 
 
 
(In millions)
 
Revenues:
 
 
 
 
 
 
 
 
 
External
 
 
 
 
 
 
 
 
 
Electric
 
$
913
 
$
1,640
 
$
-
 
$
2,553
 
Other 
 
 
132
 
 
38
 
 
63
 
 
233
 
Internal
 
 
-
 
 
-
 
 
-
 
 
-
 
Total Revenues
 
 
1,045
 
 
1,678
 
 
63
 
 
2,786
 
 
 
 
   
 
   
 
   
 
   
Expenses:
 
 
   
 
   
 
   
 
   
Fuel and purchased power
 
 
-
 
 
992
 
 
-
 
 
992
 
Other operating expenses
 
 
283
 
 
406
 
 
71
 
 
760
 
Provision for depreciation
 
 
88
   
50
 
 
6
 
 
144
 
Amortization of regulatory assets
 
 
195
 
 
4
 
 
-
 
 
199
 
Deferral of new regulatory assets
 
 
(55
)
 
(90
)
 
-
 
 
(145
)
General taxes
 
 
129
 
 
39
 
 
5
 
 
173
 
Total Expenses
 
 
640
 
 
1.401
 
 
82
 
 
2,123
 
 
 
 
   
 
   
 
   
 
   
Operating Income (Loss)
 
 
405
 
 
277
 
 
(19
)
 
663
 
Other Income (Expense):
 
 
   
 
   
 
   
 
   
Investment income
 
 
75
 
 
2
 
 
(46
)
 
31
 
Interest expense
 
 
(96
)
 
(56
)
 
(26
)
 
(178
)
Capitalized interest
 
 
5
 
 
2
 
 
-
 
 
7
 
Subsidiaries' preferred stock dividends
 
 
(5
)
 
-
 
 
3
 
 
(2
)
Total Other Income (Expense)
 
 
(21
)
 
(52
)
 
(69
)
 
(142
)
 
 
 
   
 
   
 
   
 
   
Income taxes (benefit)
 
 
155
 
 
90
 
 
(28
)
 
217
 
Income before discontinued operations
 
 
229
 
 
135
 
 
(60
)
 
304
 
Discontinued operations
 
 
-
 
 
-
 
 
-
 
 
-
 
Net Income (Loss)
 
$
229
 
$
135
 
$
(60
)
$
304
 

 
 
 
 
Power
 
 
 
 
 
 
 
 
 
Supply
 
Other and
 
 
 
 
 
Regulated
 
Management
 
Reconciling
 
FirstEnergy
 
2nd Quarter 2005 Financial Results
 
Services
 
Services
 
Adjustments
 
Consolidated
 
 
 
(In millions)
 
Revenues:
 
 
 
 
 
 
 
 
 
External
 
 
 
 
 
 
 
 
 
Electric
 
$
1,087
 
$
1,391
 
$
-
 
$
2,478
 
Other 
 
 
139
 
 
25
 
 
201
 
 
365
 
Internal
 
 
80
 
 
-
 
 
(80
)
 
-
 
Total Revenues
 
 
1,306
 
 
1,416
 
 
121
 
 
2,843
 
 
 
 
   
 
   
 
   
 
   
Expenses:
 
 
   
 
   
 
   
 
   
Fuel and purchased power
 
 
-
 
 
933
 
 
-
 
 
933
 
Other operating expenses
 
 
297
 
 
469
 
 
107
 
 
873
 
Provision for depreciation
 
 
138
   
4
 
 
7
 
 
149
 
Amortization of regulatory assets
 
 
306
 
 
-
 
 
-
 
 
306
 
Deferral of new regulatory assets
 
 
(100
)
 
(20
)
 
-
 
 
(120
)
General taxes
 
 
132
 
 
31
 
 
5
 
 
168
 
Total Expenses
 
 
773
 
 
1,417
 
 
119
 
 
2,309
 
 
 
 
   
 
   
 
   
 
   
Operating Income (Loss)
 
 
533
 
 
(1
)
 
2
 
 
534
 
Other Income (Expense):
 
 
   
 
   
 
   
 
   
Investment income
 
 
47
 
 
-
 
 
-
 
 
47
 
Interest expense
 
 
(99
)
 
(10
)
 
(53
)
 
(162
)
Capitalized interest
 
 
4
 
 
1
 
 
-
 
 
5
 
Subsidiaries' preferred stock dividends
 
 
(4
)
 
-
 
 
-
 
 
(4
)
Total Other Income (Expense)
 
 
(52
)
 
(9
)
 
(53
)
 
(114
)
 
 
 
   
 
   
 
   
 
   
Income taxes (benefit)
 
 
193
 
 
(5
)
 
53
 
 
241
 
Income before discontinued operations
 
 
288
 
 
(5
)
 
(104
)
 
179
 
Discontinued operations
 
 
-
 
 
-
 
 
(1
)
 
(1
)
Net Income (Loss)
 
$
288
 
$
(5
)
$
(105
)
$
178
 


36



 
 
 
 
Power
 
 
 
 
 
Change Between 2nd Quarter 2006 and
 
 
 
Supply
 
Other and
 
 
 
2nd Quarter 2005 Financial Results
 
Regulated
 
Management
 
Reconciling
 
FirstEnergy
 
Increase (Decrease)
 
Services
 
Services
 
Adjustments
 
Consolidated
 
 
 
(In millions)
 
Revenues:
 
 
 
 
 
 
 
 
 
External
 
 
 
 
 
 
 
 
 
Electric
 
$
(174
)
$
249
 
$
-
 
$
75
 
Other 
 
 
(7
)
 
13
 
 
(138
)
 
(132
)
Internal
 
 
(80
)
 
-
 
 
80
 
 
-
 
Total Revenues
 
 
(261
)
 
262
 
 
(58
)
 
(57
)
 
 
 
 
 
 
   
 
   
 
   
Expenses:
 
 
   
 
   
 
   
 
   
Fuel and purchased power
 
 
-
 
 
59
 
 
-
 
 
59
 
Other operating expenses
 
 
(14
)
 
(63
)
 
(36
)
 
(113
)
Provision for depreciation
 
 
(50
)
 
46
 
 
(1
)
 
(5
)
Amortization of regulatory assets
 
 
(111
)
 
4
 
 
-
 
 
(107
)
Deferral of new regulatory assets
 
 
45
 
 
(70
)
 
-
 
 
(25
)
General taxes
 
 
(3
)
 
8
 
 
-
 
 
5
 
Total Expenses
 
 
(133
)
 
(16
)
 
(37
)
 
(186
)
 
 
 
   
 
   
 
   
 
   
Operating Income
 
 
(128
)
 
278
 
 
(21
)
 
129
 
Other Income (Expense):
 
 
   
 
   
 
   
 
   
Investment income
 
 
28
 
 
2
 
 
(46
)
 
(16
)
Interest expense
 
 
3
 
 
(46
)
 
27
 
 
(16
)
Capitalized interest
 
 
1
 
 
1
 
 
-
 
 
2
 
Subsidiaries' preferred stock dividends
 
 
(1
)
 
-
 
 
3
 
 
2
 
Total Other Income (Expense)
 
 
31
 
 
(43
)
 
(16
)
 
(28
)
 
 
 
   
 
   
 
   
 
   
Income taxes
 
 
(38
)
 
95
 
 
(81
)
 
(24
)
Income before discontinued operations
 
 
(59
)
 
140
 
 
44
 
 
125
 
Discontinued operations
 
 
-
 
 
-
 
 
1
 
 
1
 
Net Income
 
$
(59
)
$
140
 
$
45
 
$
126
 
                           

Regulated Services - Second Quarter 2006 Compared to Second Quarter 2005

Net income decreased $59 million (20.5%) to $229 million in the second quarter of 2006 compared to $288 million in the second quarter of 2005, primarily due to decreased operating revenues partially offset by lower operating expenses and taxes.

Revenues -

The decrease in total revenues resulted from the following sources:

   
Three Months Ended June 30,
 
       
Increase
 
Revenues By Type of Service
 
2006
 
2005
 
(Decrease)
 
   
(In millions)
 
Distribution services
 
$
913
 
$
1,087
 
$
(174
)
Transmission services
   
87
   
105
   
(18
)
Internal lease revenues
   
-
   
80
   
(80
)
Other
   
45
   
34
   
11
 
Total Revenues
 
$
1,045
 
$
1,306
 
$
(261
)

Changes in distribution deliveries by customer class are summarized in the following table:

Electric Distribution Deliveries
     
Residential
   
(4.8
)%
Commercial
   
(1.1
)%
Industrial
   
0.4
%
Total Distribution Deliveries
   
(1.8
)%


37


The completion of the Ohio Companies' generation transition cost recovery under their respective transition plans and Penn's transition plan in 2005 was the primary reason for lower distribution unit prices, which, in conjunction with lower KWH deliveries, resulted in lower distribution delivery revenues.  The decrease in deliveries to customers was primarily due to unseasonably milder weather during the second quarter of 2006.  The following table summarizes major factors contributing to the $174 million decrease in distribution service revenues in the second quarter of 2006: 

Sources of Change in Distribution Revenues
 
Increase
(Decrease)
 
   
(In millions)
 
Changes in customer usage
 
$
(54
)
Ohio shopping incentives
   
58
 
Changes in prices:
       
Rate mix and other
   
(178
)
         
Net Decrease in Distribution Revenues
 
$
(174
)

The decrease in internal revenues reflected the effect of the generation asset transfers discussed above. The 2005 generation assets lease revenue from affiliates ceased as a result of the transfers.

Expenses-

The decrease in revenues discussed above was partially offset by the following decreases in total expenses:
 
·
Other operating expenses were $14 million lower in 2006 due, in part, to the following factors:
 
1)  
The absence in 2006 of expenses for ancillary service refunds to third parties of $6 million in 2005 due to the RCP, which provides that alternate suppliers of ancillary services now bill customers directly for those services;

2)  
A $27 million decrease in employee and contractor costs resulting from lower storm-related expenses, reduced employee benefits (principally postretirement benefits) and the decreased use of outside contractors for tree trimming, reliability work, legal services and jobbing and contracting; and

3)  
An $18 million increase due in part to insurance premium costs, financing fees and other administrative costs.

 
·
Lower depreciation expense of $50 million that resulted from the impact of the generation asset transfers;

 
·
Reduced amortization of regulatory assets of $111 million principally due to the completion of Ohio generation transition cost recovery and Penn's transition plan in 2005; and

 
·
General taxes decreased by $3 million primarily due to lower property taxes as a result of the generation asset transfers.
 
                    The reduction in the deferral of new regulatory assets resulted from the 2005 JCP&L rate decision and the end of shopping incentive deferrals under the Ohio Companies’ transition plan, partially offset by the distribution cost deferrals under the Ohio Companies’ RCP.

Other Income -

                    Higher investment income reflects the impact of the generation asset transfers. Interest income on the affiliated company notes receivable from the power supply management services segment in the second quarter of 2006 was partially offset by the absence in 2006 of the majority of nuclear decommissioning trust income which is now included in the power supply management services segment.

Power Supply Management Services - Second Quarter 2006 Compared to Second Quarter 2005
     
         Net income for this segment was $135 million in the second quarter of 2006 compared to a net loss of $5 million in the same period last year. An improvement in the gross generation margin was partially offset by higher depreciation, general taxes and interest expense resulting from the generation asset transfers.

38



Revenues -
 
                    Electric generation sales revenues increased $224 million in the second quarter of 2006 compared to the same period in 2005. This increase primarily resulted from a 7.7% increase in retail KWH sales, mostly due to the return of customers as a result of third-party suppliers leaving the Ohio marketplace, and higher unit prices resulting from the 2006 rate stabilization and fuel recovery charges. Additional retail sales reduced energy available for sale to the wholesale market. Increased transmission revenues reflected new revenues of approximately $27 million under the MISO transmission rider that began in the first quarter of 2006.

An increase in reported segment revenues resulted from the following sources:

   
Three Months Ended June 30,
 
       
Increase
 
Revenues By Type of Service
 
2006
 
2005
 
(Decrease)
 
   
(In millions)
 
Electric Generation Sales:
             
Retail
 
$
1,285
 
$
989
 
$
296
 
Wholesale
   
253
   
325
   
(72
)
Total Electric Generation Sales
   
1,538
   
1,314
   
224
 
Transmission
   
134
   
93
   
41
 
Other
   
6
   
9
   
(3
)
Total Revenues
 
$
1,678
 
$
1,416
 
$
262
 

The following table summarizes the price and volume factors contributing to changes in sales revenues from retail and wholesale customers:

   
Increase
 
Source of Change in Electric Generation Sales
 
(Decrease)
 
   
(In millions)
 
Retail:
 
 
 
 
Effect of 7.7% increase in customer usage
 
$
76
 
Increased prices
 
 
220
 
 
 
 
296
 
Wholesale:
 
 
   
Effect of 8.4% decrease in KWH sales
 
 
(27
)
Lower prices
 
 
(45
)
 
 
 
(72
)
Net Increase in Electric Generation Sales
 
$
224
 

Expenses -

Total operating expenses decreased by $16 million. The decrease was due to the following factors:

 
·
Lower non-fuel operating expenses of $63 million reflect the absence in 2006 of generating lease rents of $80 million in 2005 due to the generation asset transfers, partially offset by higher transmission expenses of $11 million related to the transmission revenues discussed above; and

 
·
The $70 million increase in the deferral of new regulatory assets represents PJM/MISO costs incurred that are expected to be recovered from customers through future rates. The recognition of these amounts under the Power Supply Management Services segment reflects a change in the current year operations reporting as discussed in Note 13 - Segment Information. Retail transmission revenues and PJM/MISO transmission revenues and expenses associated with serving electricity load are now included in the power supply management services segment results. The deferrals in 2006 also include the Ohio RCP fuel deferral of $29 million.


39



The above decreases were partially offset by the following:

 
·
Higher fuel and purchased power costs of $59 million, including increased fuel costs of $23 million - coal costs increased $40 million as a result of increased generation output, higher coal commodity prices and increased transportation costs for western coal. The increased coal costs were partially offset by lower natural gas and emission allowance costs of $20 million. Purchased power costs increased $36 million due to higher prices and increased volumes. Factors producing the higher costs are summarized in the following table:

 
 
Increase
 
Source of Change in Fuel and Purchased Power
 
(Decrease)
 
 
 
(In millions)
 
Fuel:
 
 
 
 
Change due to increased unit costs
 
 $
5
 
Change due to volume consumed
 
 
18
 
 
 
 
23
 
Purchased Power:
       
Change due to increased unit costs
 
 
53
 
Change due to volume purchased
 
 
2
 
Increase in NUG costs deferred
 
 
(19
)
     
36
 
         
Net Increase in Fuel and Purchased Power Costs
 
$
59
 


 
·
Increased depreciation expenses of $46 million resulted principally from the generation asset transfers; and

 
·
Higher general taxes of $8 million due to additional property taxes resulting from the generation asset transfers.

Other Income and Expense -
 
·
Investment income in the second quarter of 2006 increased by $2 million over the prior year period primarily due to nuclear decommissioning trust investments acquired through the generation asset transfers; and
 
·
Interest expense increased by $46 million, primarily due to the interest expense in 2006 on associated company notes payable that financed the generation asset transfers.
 
Other - Second Quarter 2006 Compared to Second Quarter 2005

                   FirstEnergy’s financial results from other operating segments and reconciling items, including interest expense on holding company debt and corporate support services revenues and expenses, resulted in a $45 million increase to FirstEnergy’s net income in the second quarter of 2006 compared to the same quarter of 2005. The increase was primarily due to the absence of an adjustment from the effect of Ohio tax legislation in June 2005, which resulted in additional 2005 tax expenses of $71 million, and a $3 million gain related to interest rate swap financing arrangements. These increases were partially offset by a $5 million reduction in investment income, non-core asset sales gains/impairments of $9 million and a $7 million reduction in gas commodity trading results.

40



Summary of Results of Operations - First Six Months of 2006 Compared with the First Six Months of 2005

Financial results for FirstEnergy's major business segments in the first six months of 2006 and 2005 were as follows:

 
 
 
 
Power
 
 
 
 
 
 
 
 
 
Supply
 
Other and
 
 
 
 
 
Regulated
 
Management
 
Reconciling
 
FirstEnergy
 
First Six Months of 2006 Financial Results
 
Services
 
Services
 
Adjustments
 
Consolidated
 
 
 
(In millions)
 
Revenues:
 
 
 
 
 
 
 
 
 
External
 
 
 
 
 
 
 
 
 
Electric
 
$
1,848
 
$
3,216
 
$
-
 
$
5,064
 
Other 
 
 
280
   
81
 
 
206
 
 
567
 
Internal
 
 
-
 
 
-
 
 
-
 
 
-
 
Total Revenues
 
 
2,128
 
 
3,297
 
 
206
 
 
5,631
 
 
 
 
   
 
   
 
   
 
   
Expenses:
 
 
   
 
   
 
   
 
   
Fuel and purchased power
 
 
-
 
 
1,990
 
 
-
 
 
1,990
 
Other operating expenses
 
 
582
 
 
856
 
 
215
 
 
1,653
 
Provision for depreciation
 
 
184
   
96
 
 
12
 
 
292
 
Amortization of regulatory assets
 
 
412
 
 
9
 
 
-
 
 
421
 
Deferral of new regulatory assets
 
 
(110
)
 
(116
)
 
-
 
 
(226
)
General taxes
 
 
269
 
 
84
 
 
13
 
 
366
 
Total Expenses
 
 
1,337
 
 
2,919
 
 
240
 
 
4,496
 
 
 
 
   
 
   
 
   
 
   
Operating Income (Loss)
 
 
791
 
 
378
 
 
(34
)
 
1,135
 
Other Income (Expense):
 
 
   
 
   
 
   
 
   
Investment income
 
 
137
 
 
17
 
 
(80
)
 
74
 
Interest expense
 
 
(190
)
 
(109
)
 
(44
)
 
(343
)
Capitalized interest
 
 
8
 
 
6
 
 
-
 
 
14
 
Subsidiaries' preferred stock dividends
 
 
(7
)
 
-
 
 
3
 
 
(4
)
Total Other Income (Expense)
 
 
(52
)
 
(86
)
 
(121
)
 
(259
)
 
 
 
   
 
   
 
   
 
   
Income taxes (benefit)
 
 
299
 
 
117
 
 
(65
)
 
351
 
Income before discontinued operations
 
 
440
 
 
175
 
 
(90
)
 
525
 
Discontinued operations
 
 
-
 
 
-
 
 
-
 
 
-
 
Net Income (Loss)
 
$
440
 
$
175
 
$
(90
)
$
525
 

41



 
 
 
 
Power
 
 
 
 
 
 
 
 
 
Supply
 
Other and
 
 
 
 
 
Regulated
 
Management
 
Reconciling
 
FirstEnergy
 
First Six Months of 2005 Financial Results
 
Services
 
Services
 
Adjustments
 
Consolidated
 
 
 
(In millions)
 
Revenues:
 
 
 
 
 
 
 
 
 
External
 
 
 
 
 
 
 
 
 
Electric
 
$
2,169
 
$
2,746
 
$
-
 
$
4,915
 
Other 
 
 
273
 
 
47
 
 
358
 
 
678
 
Internal
 
 
158
 
 
-
 
 
(158
)
 
-
 
Total Revenues
 
 
2,600
 
 
2,793
 
 
200
 
 
5,593
 
 
 
 
   
 
   
 
   
 
   
Expenses:
 
 
   
 
   
 
   
 
   
Fuel and purchased power
 
 
-
 
 
1,828
 
 
-
 
 
1,828
 
Other operating expenses
 
 
625
 
 
968
 
 
164
 
 
1,757
 
Provision for depreciation
 
 
261
   
17
 
 
14
 
 
292
 
Amortization of regulatory assets
 
 
617
 
 
-
 
 
-
 
 
617
 
Deferral of new regulatory assets
 
 
(160
)
 
(20
)
 
-
 
 
(180
)
General taxes
 
 
274
 
 
67
 
 
12
 
 
353
 
Total Expenses
 
 
1,617
 
 
2,860
 
 
190
 
 
4,667
 
 
 
 
   
 
   
 
   
 
   
Operating Income (Loss)
 
 
983
 
 
(67
)
 
10
 
 
926
 
Other Income (Expense):
 
 
   
 
   
 
   
 
   
Investment income
 
 
88
 
 
-
 
 
-
 
 
88
 
Interest expense
 
 
(194
)
 
(16
)
 
(116
)
 
(326
)
Capitalized interest
 
 
7
 
 
(3
)
 
-
 
 
4
 
Subsidiaries' preferred stock dividends
 
 
(10
)
 
-
 
 
-
 
 
(10
)
Total Other Income (Expense)
 
 
(109
)
 
(19
)
 
(116
)
 
(244
)
 
 
 
   
 
   
 
   
 
   
Income taxes (benefit)
 
 
350
 
 
(35
)
 
47
 
 
362
 
Income before discontinued operations
 
 
524
 
 
(51
)
 
(153
)
 
320
 
Discontinued operations
 
 
-
 
 
-
 
 
18
 
 
18
 
Net Income (Loss)
 
$
524
 
$
(51
)
$
(135
)
$
338
 

 
 
 
 
Power
 
 
 
 
 
Change Between First Six Months of 2006
 
 
 
Supply
 
Other and
 
 
 
and First Six Months of 2005
 
Regulated
 
Management
 
Reconciling
 
FirstEnergy
 
Financial Results - Increase (Decrease)
 
Services
 
Services
 
Adjustments
 
Consolidated
 
 
 
(In millions)
 
Revenues:
 
 
 
 
 
 
 
 
 
External
 
 
 
 
 
 
 
 
 
Electric
 
$
(321
)
$
470
 
$
-
 
$
149
 
Other 
 
 
7
 
 
34
 
 
(152
)
 
(111
)
Internal
 
 
(158
)
 
-
 
 
158
 
 
-
 
Total Revenues
 
 
(472
)
 
504
 
 
6
 
 
38
 
 
 
 
   
 
   
 
   
 
   
Expenses:
 
 
   
 
   
 
   
 
   
Fuel and purchased power
 
 
-
 
 
162
 
 
-
 
 
162
 
Other operating expenses
 
 
(43
)
 
(112
)
 
51
 
 
(104
)
Provision for depreciation
 
 
(77
)
 
79
 
 
(2
)
 
-
 
Amortization of regulatory assets
 
 
(205
)
 
9
 
 
-
 
 
(196
)
Deferral of new regulatory assets
 
 
50
 
 
(96
)
 
-
 
 
(46
)
General taxes
 
 
(5
)
 
17
 
 
1
 
 
13
 
Total Expenses
 
 
(280
)
 
59
 
 
50
 
 
(171
)
 
 
 
   
 
   
 
   
 
   
Operating Income
 
 
(192
)
 
445
 
 
(44
)
 
209
 
Other Income (Expense):
 
 
   
 
   
 
   
 
   
Investment income
 
 
49
 
 
17
 
 
(80
)
 
(14
)
Interest expense
 
 
4
 
 
(93
)
 
72
 
 
(17
)
Capitalized interest
 
 
1
 
 
9
 
 
-
 
 
10
 
Subsidiaries' preferred stock dividends
 
 
3
 
 
-
 
 
3
 
 
6
 
Total Other Income (Expense)
 
 
57
 
 
(67
)
 
(5
)
 
(15
)
 
 
 
   
 
   
 
   
 
   
Income taxes
 
 
(51
)
 
152
 
 
(112
)
 
(11
)
Income before discontinued operations
 
 
(84
)
 
226
 
 
63
 
 
205
 
Discontinued operations
 
 
-
 
 
-
 
 
(18
)
 
(18
)
Net Income
 
$
(84
)
$
226
 
$
45
 
$
187
 

42


Regulated Services - First Six Months of 2006 Compared to First Six Months of 2005

Net income decreased $84 million (16.0%) to $440 million in the first six months of 2006 compared to $524 million in the first six months of 2005, primarily due to decreased operating revenues partially offset by lower operating expenses and taxes.

Revenues -

The decrease in total revenues resulted from the following sources:

   
Six Months Ended June 30,
 
       
Increase
 
Revenues By Type of Service
 
2006
 
2005
 
(Decrease)
 
   
(In millions)
 
Distribution services
 
$
1,848
 
$
2,169
 
$
(321
)
Transmission services
   
181
   
197
   
(16
)
Internal lease revenues
   
-
   
158
   
(158
)
Other
   
99
   
76
   
23
 
Total Revenues
 
$
2,128
 
$
2,600
 
$
(472
)

Decreases in distribution deliveries by customer class are summarized in the following table:

Electric Distribution Deliveries
     
Residential
   
(3.6
)%
Commercial
   
(1.6
)%
Industrial
   
(1.2
)%
Total Distribution Deliveries
   
(2.2
)%

The completion of the Ohio Companies' generation transition cost recovery under their respective transition plans and Penn's transition plan in 2005 was the primary reason for lower distribution unit prices, which, in conjunction with lower KWH deliveries, resulted in lower distribution delivery revenues. The decreases in deliveries to customers were primarily due to unseasonably milder weather during the first six months of 2006 as compared to the same period in 2005. The following table summarizes major factors contributing to the $321 million decrease in distribution service revenues in the first six months of 2006:

Sources of Change in Distribution Revenues
 
Increase
(Decrease)
 
   
(In millions)
 
Changes in customer usage
 
$
(102
)
Ohio shopping incentives
   
100
 
Changes in prices:
       
Rate mix and other
   
(319
)
         
Net Decrease in Distribution Revenues
 
$
(321
)

The decrease in internal revenues reflected the effect of the generation asset transfers discussed above. The 2005 generation assets lease revenue from affiliates ceased as a result of the transfers.

Expenses-

The decrease in revenues discussed above was partially offset by the following decreases in total expenses:

 
·
Other operating expenses were $43 million lower in 2006 due, in part, to the following factors:
  1)  
The absence in 2006 of expenses for ancillary service refunds to third parties of $13 million in 2005 due to the RCP, which provides that alternate suppliers of ancillary services now bill customers directly for those services;

2)  
The absence in 2006 of receivables factoring discount expenses of approximately $6 million incurred in 2005; and

43



3)  
A $33 million decrease in employee and contractor costs resulting from lower storm-related expenses, reduced employee benefits and the decreased use of outside contractors for tree trimming, reliability work, legal services and jobbing and contracting.

 
·
Lower depreciation expense of $77 million resulted from the impact of the generation asset transfers;

 
·
Reduced amortization of regulatory assets of $205 million resulted principally from the completion of Ohio generation transition cost recovery and Penn's transition plan in 2005; and

 
·
General taxes decreased by $5 million primarily due to lower property taxes as a result of the generation asset transfers.

The reduction in the deferral of new regulatory assets resulted from the 2005 JCP&L rate decision and the end of shopping incentive deferrals under the Ohio Companies’ transition plan, partially offset by the distribution cost deferrals under the Ohio Companies’ RCP.

Other Income and Expense -

 
·
Higher investment income reflects the impact of the generation asset transfers. Interest income on the affiliated company notes receivable from the power supply management services segment in the first six months of 2006 is partially offset by the absence in 2006 of the majority of nuclear decommissioning trust income which is now included in the power supply management services segment; and

 
·
Subsidiaries' preferred stock dividends decreased by $3 million in 2006 due to redemption activity in 2005.

Power Supply Management Services - First Six Months of 2006 Compared to First Six Months of 2005

Net income for this segment was $175 million in the first six months of 2006 compared to a net loss of $51 million in the same period last year. An improvement in the gross generation margin was partially offset by higher depreciation, general taxes and interest expense resulting from the generation asset transfers.

Revenues -

Electric generation sales revenues increased $423 million in the first six months of 2006 compared to the same period in 2005. This increase primarily resulted from a 7.2% increase in retail KWH sales, mostly due to the return of customers as a result of third-party suppliers leaving the Ohio marketplace, and higher unit prices resulting from the RSP and RCP that were effective in 2006. The higher retail sales reduced energy available for sale to the wholesale market. Increased transmission revenues reflected new revenues of approximately $54 million under the MISO transmission rider that began in the first quarter of 2006. These increases were partially offset by a reduction in wholesale sales revenue as a result of both lower KWH sales and lower unit prices.

The increase in reported segment revenues resulted from the following sources:

   
Six Months Ended June 30,
 
       
Increase
 
Revenues By Type of Service
 
2006
 
2005
 
(Decrease)
 
   
(In millions)
 
Electric Generation Sales:
             
Retail
 
$
2,524
 
$
1,969
 
$
555
 
Wholesale
   
488
   
620
   
(132
)
Total Electric Generation Sales
   
3,012
   
2,589
   
423
 
Transmission
   
262
   
182
   
80
 
Other
   
23
   
22
   
1
 
Total Revenues
 
$
3,297
 
$
2,793
 
$
504
 


44



The following table summarizes the price and volume factors contributing to changes in sales revenues from retail and wholesale customers:

   
Increase
 
Source of Change in Electric Generation Sales
 
(Decrease)
 
   
(In millions)
 
Retail:
 
 
 
 
Effect of 7.2% increase in customer usage
 
$
141
 
Change in prices
 
 
414
 
 
 
 
555
 
Wholesale:
 
 
   
Effect of 11.9% decrease in KWH sales
 
 
(74
)
Change in prices
 
 
(58
)
 
 
 
(132
)
Net Increase in Electric Generation Sales
 
$
423
 

Expenses -

Total operating expenses increased by $59 million. The increase was due to the following factors:

 
·
Higher fuel and purchased power costs of $162 million, including increased fuel costs of $73 million - coal costs increased $81 million as a result of increased generation output, higher coal commodity prices and increased transportation costs for western coal. The increased coal costs were partially offset by lower natural gas and emission allowance costs of $16 million. Purchased power costs increased $89 million due to higher prices partially offset by lower volumes. Factors contributing to the higher costs are summarized in the following table:

 
 
Increase
 
Source of Change in Fuel and Purchased Power
 
(Decrease)
 
 
 
(In millions)
 
Fuel:
 
 
 
 
Change due to increased unit costs
 
 $
37
 
Change due to volume consumed
 
 
36
 
 
 
 
73
 
Purchased Power:
       
Change due to increased unit costs
 
 
130
 
Change due to volume purchased
 
 
(31
)
Increase in NUG costs deferred
 
 
(10
)
     
89
 
         
Net Increase in Fuel and Purchased Power Costs
 
$
162
 

  
·
Higher transmission expenses of $42 million related to the transmission revenues discussed above;

 
·
Increased depreciation expenses of $79 million, resulting principally from the generation asset transfers; and

 
·
Higher general taxes of $17 million due to additional property taxes resulting from the generation asset transfers.
 
                   Partially offsetting these higher costs were lower non-fuel operating expenses of $112 million, which reflect the absence in 2006 of generating asset lease rents of $158 million charged in 2005 due to the generation asset transfers. Also absent in 2006 were: (1) the 2005 accrual of an $8.5 million civil penalty payable to the DOJ and $10 million for obligations to fund environmentally beneficial projects in connection with the Sammis Plant settlement; and (2) a $3.5 million penalty related to the Davis-Besse outage.
 
                   The $96 million increase in the deferral of new regulatory assets represents PJM/MISO costs incurred that are expected to be recovered from customers through future rates. The deferrals also include the Ohio RCP fuel deferral of $51 million.

45



Other Income and Expense -

 
·
Investment income in the first six months of 2006 was $17 million higher primarily due to nuclear decommissioning trust investments acquired through the generation asset transfers; and
     
 
·
Interest expense increased by $93 million, primarily due to interest on the associated company notes payable from the generation asset transfers. This increase was partially offset by an additional $9 million of capitalized interest.

Other - First Six Months of 2006 Compared to First Six Months of 2005

FirstEnergy’s financial results from other operating segments and reconciling items, including interest expense on holding company debt and corporate support services revenues and expenses, resulted in a $45 million increase to FirstEnergy’s net income in the first six months of 2006 compared to the same period of 2005. The increase was primarily due to the absence of the write-off of income tax benefits due to the 2005 change in Ohio tax legislation, the financing swap gain described in the Other - Second Quarter 2006 Compared to Second Quarter 2005 results analysis above and a $3 million increase in other investment income in the first half of 2006. These increases were partially offset by the FSG impairment charge and gas commodity trading results reduction and the absence of after - tax gains of $17 million from discontinued operations in 2005 (see Note 4). The following table summarizes the sources of income from discontinued operations for the six months ended June 30, 2005:

 
 
(In millions)
 
Discontinued Operations (Net of tax)
 
 
 
Gain on sale:
 
 
 
  Natural gas business
 
$
5
 
      Elliot-Lewis, Spectrum and Power Piping
 
 
12
 
Reclassification of operating income
 
 
1
 
Total
 
$
18
 

CAPITAL RESOURCES AND LIQUIDITY
 
                   During 2006 and thereafter, FirstEnergy expects to meet its contractual obligations primarily with a combination of cash from operations and funds from the capital markets. Borrowing capacity under credit facilities is available to manage working capital requirements.

Changes in Cash Position
 
                   FirstEnergy's primary source of cash required for continuing operations as a holding company is cash from the operations of its subsidiaries. FirstEnergy also has access to $2.0 billion of short-term financing under a revolving credit facility which expires in 2010, subject to short-term debt limitations under current regulatory approvals of $1.5 billion and to outstanding borrowings by subsidiaries of FirstEnergy that are also parties to such facility. FirstEnergy paid cash dividends to common shareholders of $148 million in each quarter of 2006 totaling $296 million for the first six months of 2006. FirstEnergy received $148 million of cash dividends from its subsidiaries in the first quarter of 2006 and borrowed against the $2.0 billion revolving credit facility for the second quarter dividend payment. In July, FirstEnergy received $500 million from OE as a result of OE’s repurchase of common stock. There are no material restrictions on the payment of cash dividends by FirstEnergy's subsidiaries.
 
                   As of June 30, 2006, FirstEnergy had $583 million of cash and cash equivalents compared with $64 million as of December 31, 2005. Temporary cash investments of $544 million were used principally to redeem $400 million of the outstanding $1 billion of FirstEnergy’s 5.5% notes in July 2006, in advance of their November 15, 2006 maturity date. The remainder was used in July 2006 to redeem $61 million of OE’s preferred stock and reduce short-term borrowings. The major sources for changes in cash and cash equivalent balances are summarized below.

46


Cash Flows From Operating Activities

FirstEnergy's consolidated net cash from operating activities is provided primarily by its regulated services and power supply management services businesses (see Results of Operations above). Net cash provided from operating activities was $551 million and $921 million in the first six months of 2006 and 2005, respectively, summarized as follows:

   
Six Months Ended
 
   
June 30,
 
Operating Cash Flows
 
2006
 
2005
 
   
(In millions)
 
Cash earnings *
 
$
771
 
$
827
 
Working capital and other
   
(220
)
 
94
 
Net cash provided from operating activities
 
$
551
 
$
921
 
               
* Cash earnings are a Non-GAAP measure (see reconciliation below).

Cash earnings (in the table above) are not a measure of performance calculated in accordance with GAAP. FirstEnergy believes that cash earnings are a useful financial measure because it provides investors and management with an additional means of evaluating its cash-based operating performance. The following table reconciles cash earnings with net income.

 
 
Six Months Ended
 
 
 
June 30,
 
 Reconciliation of Cash Earnings
 
2006
 
2005
 
   
(In millions)
 
Net income (GAAP)
 
$
525
 
$
338
 
Non-cash charges (credits):
 
 
       
 
Provision for depreciation
 
 
292
 
 
 292
 
Amortization of regulatory assets
 
 
421
 
 
617
 
Deferral of new regulatory assets
 
 
(226
)
 
(180
)
Nuclear fuel and lease amortization
 
 
30
 
 
38
 
Deferred purchased power and other costs
 
 
(239
)
 
(210
)
Deferred income taxes and investment tax credits
 
 
32
 
 
62
 
Deferred rents and lease market valuation liability
 
 
(105
)
 
(101
)
Accrued compensation and retirement benefits
   
33
   
11
 
Income from discontinued operations
 
 
-
 
 
(18
)
Other non-cash expenses
 
 
8
 
 
(22
)
Cash earnings (Non-GAAP)
 
$
771
 
$
827
 

Net cash provided from operating activities decreased by $370 million in the first six months of 2006 compared to the first six months of 2005 primarily due to a $314 million decrease from working capital and a $56 million decrease in cash earnings described under "Results of Operations." The decrease from working capital changes primarily resulted from $242 million of funds received in 2005 for prepaid electric service (under a three-year Energy for Education Program with the Ohio Schools Council), increased outflows of $144 million for payables primarily caused by higher fuel and purchased power costs, and $77 million of cash collateral returned to suppliers. These decreases were partially offset by an increase in cash provided from the settlement of receivables of $218 million, reflecting increased electric sales revenues.

47



Cash Flows From Financing Activities

In the first six months of 2006, cash provided from financing activities was $616 million compared to cash used for financing activities of $468 million in the first six months of 2005. The following table summarizes security issuances and redemptions.

 
 
Six Months Ended
 
 
 
June 30,
 
Securities Issued or Redeemed
 
2006
 
2005
 
   
(In millions)
 
New issues
 
 
 
 
 
Pollution control notes
 
$
253
 
$
245
 
Secured notes
 
 
200
 
 
-
 
Unsecured notes
 
 
600
 
 
-
 
 
 
$
1,053
 
$
245
 
Redemptions
 
 
   
 
 
 
First mortgage bonds
 
$
1
 
$
178
 
Pollution control notes
 
 
307
 
 
247
 
Secured notes
 
 
179
 
 
49
 
Long-term revolving credit
 
 
-
 
 
215
 
Preferred stock
 
 
30
 
 
140
 
 
 
$
517
 
$
829
 
 
 
 
   
 
 
 
Short-term borrowings, net
 
$
371
 
$
386
 

FirstEnergy had approximately $1.1 billion of short-term indebtedness as of June 30, 2006 compared to approximately $731 million as of December 31, 2005. This increase was due primarily to higher capital expenditures and common dividend payments compared to Net Cash from Operating Activities during the first half of the year. Available bank borrowing capability as of June 30, 2006 included the following:

Borrowing Capability
 
 
 
   
(In millions)
 
Short-term credit facilities(1)
 
$
2,120
 
Accounts receivable financing facilities
   
550
 
Utilized
 
 
(1,096
)
LOCs
 
 
(123
)
Net
 
 $
1,451
 
 
 
 
 
 
 (1)A $2 billion revolving credit facility that expires in 2010 is available in various amounts to FirstEnergy and certain of its subsidiaries. A $100 million revolving credit facility that expires in December 2006 and a $20 million uncommitted line of credit facility that expires in September 2006 are both available to FirstEnergy only.
 
                    As of June 30, 2006, the Ohio Companies and Penn had the aggregate capability to issue approximately $1.5 billion of additional FMB on the basis of property additions and retired bonds under the terms of their respective mortgage indentures. The issuance of FMB by OE and CEI are also subject to provisions of their senior note indentures generally limiting the incurrence of additional secured debt, subject to certain exceptions that would permit, among other things, the issuance of secured debt (including FMB) (i) supporting pollution control notes or similar obligations, or (ii) as an extension, renewal or replacement of previously outstanding secured debt. In addition, these provisions would permit OE and CEI to incur additional secured debt not otherwise permitted by a specified exception of up to $735 million and $576 million, respectively, as of June 30, 2006. Under the provisions of its senior note indenture, JCP&L may issue additional FMB only as collateral for senior notes. As of June 30, 2006, JCP&L had the capability to issue $610 million of additional senior notes upon the basis of FMB collateral.
 
                   Based upon applicable earnings coverage tests in their respective charters, OE, Penn, TE and JCP&L could issue a total of $5 billion of preferred stock (assuming no additional debt was issued) as of June 30, 2006. CEI, Met-Ed and Penelec do not have similar restrictions and could issue up to the number of preferred shares authorized under their respective charters. As a result of OE redeeming all of its outstanding preferred stock on July 7, 2006, the applicable earnings coverage test is inoperative for OE. Accordingly, as of July 7, 2006, Penn, TE and JCP&L could issue a total of $2.6 billion of preferred stock (assuming no additional debt was issued). In the event that OE issues preferred stock in the future, the applicable earnings coverage test will govern the amount of additional preferred stock that OE may issue.

48


 
                    As of June 30, 2006, approximately $1 billion of capacity remained unused under an existing shelf registration statement, filed by FirstEnergy with the SEC in 2003, to support future securities issuances. The shelf registration provides the flexibility to issue and sell various types of securities, including common stock, debt securities, and share purchase contracts and related share purchase units. As of June 30, 2006, OE had approximately $400 million of capacity remaining unused under its existing shelf registration for unsecured debt securities.
 
                   FirstEnergy's working capital and short-term borrowing needs are met principally with a $2 billion five-year revolving credit facility (included in the table above). Borrowings under the facility are available to each borrower separately and mature on the earlier of 364 days from the date of borrowing or the June 16, 2010 commitment expiration date.
 
                   The following table summarizes the borrowing sub-limits for each borrower under the facility, as well as the limitations on short-term indebtedness applicable to each borrower under current regulatory approvals and applicable statutory and/or charter limitations:

 
 
Revolving
 
Regulatory and
 
 
 
Credit Facility
 
Other Short-Term
 
Borrower
 
Sub-Limit
 
Debt Limitations1
 
 
 
(In millions)
 
FirstEnergy
 
$
2,000
 
$
1,500
 
OE
 
 
500
 
 
500
 
Penn
 
 
50
 
 
44
 
CEI
 
 
250
 
 
500
 
TE
 
 
250
 
 
500
 
JCP&L
 
 
425
 
 
412
 
Met-Ed
 
 
250
 
 
300
 
Penelec
 
 
250
 
 
300
 
FES
 
 
(2)
 
 
n/a
 
ATSI
 
 
(2)
 
 
26
 

 
(1)
As of June 30, 2006.
 
(2)
Borrowing sub-limits for FES and ATSI may be increased to up to $250 million and $100 million, respectively, by delivering notice to the administrative agent that either (i) such borrower has senior unsecured debt ratings of at least BBB- LC b S&P and Baa3 by Moody's or (ii) FirstEnergy has guaranteed the obligations of such borrower under the facility.
 
The revolving credit facility, combined with an aggregate $550 million ($249 million unused as of June 30, 2006) of accounts receivable financing facilities for OE, CEI, TE, Met-Ed, Penelec and Penn, are intended to provide liquidity to meet short-term working capital requirements for FirstEnergy and its subsidiaries.
 
                   Under the revolving credit facility, borrowers may request the issuance of LOCs expiring up to one year from the date of issuance. The stated amount of outstanding LOCs will count against total commitments available under the facility and against the applicable borrower’s borrowing sub-limit. Total unused borrowing capability under existing credit facilities and accounts receivable financing facilities was $1.5 billion as of June 30, 2006.
 
                   The revolving credit facility contains financial covenants requiring each borrower to maintain a consolidated debt to total capitalization ratio of no more than 65%, measured at the end of each fiscal quarter. As of June 30, 2006, FirstEnergy and its subsidiaries' debt to total capitalization ratios (as defined under the revolving credit facility) were as follows:

Borrower
 
 
FirstEnergy
 
55
%
OE
 
40
%
Penn
 
34
%
CEI
 
49
%
TE
 
28
%
JCP&L
 
29
%
Met-Ed
 
38
%
Penelec
 
36
%
 
                   The revolving credit facility does not contain provisions that either restrict the ability to borrow or accelerate repayment of outstanding advances as a result of any change in credit ratings. Pricing is defined in “pricing grids”, whereby the cost of funds borrowed under the facility is related to the credit ratings of the company borrowing the funds.

49



FirstEnergy's regulated companies also have the ability to borrow from each other and the holding company to meet their short-term working capital requirements. A similar but separate arrangement exists among FirstEnergy's unregulated companies. FESC administers these two money pools and tracks surplus funds of FirstEnergy and the respective regulated and unregulated subsidiaries, as well as proceeds available from bank borrowings. Companies receiving a loan under the money pool agreements must repay the principal amount of the loan, together with accrued interest, within 364 days of borrowing the funds. The rate of interest is the same for each company receiving a loan from their respective pool and is based on the average cost of funds available through the pool. The average interest rate for borrowings in the first six months of 2006 was approximately 4.86% for both the regulated companies’ money pool and the unregulated companies' money pool.

FirstEnergy’s access to capital markets and costs of financing are influenced by the ratings of its securities. The following table displays FirstEnergy’s and the Companies' securities ratings as of July 31, 2006. The ratings outlook from S&P on all securities is stable. The ratings outlook from Moody's and Fitch on all securities is positive.

Issuer
 
Securities
 
S&P
 
Moody’s
 
Fitch
                 
FirstEnergy
 
Senior unsecured
 
BBB-
 
Baa3
 
BBB-
                 
OE
 
Senior unsecured
 
BBB-
 
Baa2
 
BBB
                 
CEI
 
Senior secured
 
BBB
 
Baa2
 
BBB-
   
Senior unsecured
 
BBB-
 
Baa3
 
BB+
                 
TE
 
Senior secured
 
BBB
 
Baa2
 
BBB-
   
Preferred stock
 
BB+
 
Ba2
 
BB
                 
Penn
 
Senior secured
 
BBB+
 
Baa1
 
BBB+
   
Senior unsecured(1)
 
BBB-
 
Baa2
 
BBB
   
Preferred stock
 
BB+
 
Ba1
 
BBB-
                 
JCP&L
 
Senior secured
 
BBB+
 
Baa1
 
BBB+
   
Preferred stock
 
BB+
 
Ba1
 
BBB-
                 
Met-Ed
 
Senior secured
 
BBB+
 
Baa1
 
BBB+
   
Senior unsecured
 
BBB
 
Baa2
 
BBB
                 
Penelec
 
Senior unsecured
 
BBB
 
Baa2
 
BBB
            (1) Penn's only senior unsecured debt obligations are notes underlying pollution control revenue refunding bonds issued by the Ohio Air Quality Development   Authority to which bonds this rating applies.

On January 20, 2006, TE redeemed all 1.2 million of its outstanding shares of Adjustable Rate Series B preferred stock at $25.00 per share, plus accrued dividends to the date of redemption.
 
                  On April 3, 2006, $106.5 million of pollution control revenue refunding bonds were issued on behalf of NGC ($60 million at 3.07% and $46.5 million at 3.25%). The proceeds from the bonds were used to redeem the following Companies' pollution control notes (OE - $60 million at 7.05%, CEI - $27.7 million at 3.32%, TE - $18.8 million at 3.32%). Also, on April 3, 2006, $146.7 million of pollution control revenue refunding bonds were issued on behalf of FGCO ($90.1 million at 3.03% and $56.6 million at 3.10%) which were used to redeem the following Companies' pollution control notes (OE - $14.8 million at 5.45%, Penn - $6.95 million at 5.45%, TE - $34.85 million at 3.18%, CEI - $47.5 million at 3.22%, $39.8 million at 3.20% and $2.8 million at 3.15%) in April and May 2006. These refinancings were undertaken in furtherance of FirstEnergy's intra-system generation asset transfers (see Note 14). The proceeds from NGC's and FGCO's refinancing issuances were used to repay a portion of their associated company notes payable to OE, Penn, CEI and TE, who then redeemed their respective debt.
 
                   On May 12, 2006, JCP&L issued $200 million of 6.40% secured senior notes due 2036. The proceeds of the offering were used to repay at maturity $150 million aggregate principal amount of JCP&L’s 6.45% senior notes due May 15, 2006 and for general corporate purposes.
 
                   On June 8, 2006, the NJBPU approved JCP&L's request to issue securitization bonds associated with BGS stranded cost deferrals. On August 4, 2006, JCP&L Transition Funding II, a wholly owned subsidiary of JCP&L, secured pricing on the issuance of $182 million of transition bonds with a weighted average interest rate of 5.5%.

50


 
                  On June 20, 2006, FirstEnergy's Board of Directors authorized a share repurchase program for up to 12 million shares of common stock. At management’s discretion shares may be acquired on the open market or through privately negotiated transactions, subject to market conditions and other factors. The Board’s authorization of the repurchase program does not require FirstEnergy to purchase any shares and the program may be terminated at any time. The 12 million shares represent 3.6% of the common stock currently outstanding.
 
                   On June 26, 2006, OE issued $600 million of unsecured senior notes, comprised of $250 million of 6.4% notes due 2016 and $350 million of 6.875% notes due 2036. The majority of the proceeds from this offering were used in July 2006 to repurchase $500 million of OE common stock from FirstEnergy, enabling FirstEnergy to accelerate repayment of $400 million of senior notes that were due to mature in November 2006. The remainder of the proceeds were used to redeem approximately $61 million of OE’s preferred stock on July 7, 2006 and to reduce short-term borrowings. This offering represented an important part of FirstEnergy’s 2006 financing strategy to obtain additional financing flexibility at the holding company level and to capitalize the regulated utilities in a way that positions them appropriately in a regulatory context.

Cash Flows From Investing Activities

Net cash flows used in investing activities resulted principally from property additions. Regulated services expenditures for property additions primarily include expenditures supporting the transmission and distribution of electricity. Capital expenditures by the power supply management services segment are principally generation-related. The following table summarizes investments for the six months ended June 30, 2006 and 2005 by segment:

Summary of Cash Flows
 
Property
 
 
 
 
 
 
 
Used for Investing Activities
 
Additions
 
Investments
 
Other
 
Total
 
 Sources (Uses)
 
(In millions)
 
 
 
 
 
 
 
 
 
 
 
Six Months Ended June 30, 2006
 
 
 
 
 
 
 
 
 
Regulated services
 
$
(356
)
$
66
 
$
(9
)
$
(299
)
Power supply management services
 
 
(347
)
 
(24
)
 
1
 
 
(370
)
Other
 
 
(2
)
 
1
 
 
(5
)
 
(6
)
Reconciling items
   
(20
)
 
37
   
10
   
27
 
Total
 
$
(725
)
$
80
 
$
(3
)
$
(648
)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Six Months Ended June 30, 2005
 
 
 
 
 
 
 
 
 
 
 
 
 
Regulated services
 
$
(299
$
9
 
$
(7
$
(297
Power supply management services
 
 
(147
 
14
 
 
(5
)
 
(138
Other
 
 
(5
 
4
 
 
(19
 
(20
Reconciling items
   
(11
)
 
10
   
-
   
(1
)
Total
 
$
(462
$
37
 
$
(31
$
(456
 
                   Net cash used for investing activities in the first six months of 2006 increased by $192 million compared to the first six months of 2005. The increase was principally due to a $263 million increase in property additions which reflects the replacement of the steam generators and reactor head at Beaver Valley Unit 1, air quality control system expenditures and the distribution system Accelerated Reliability Improvement Program. The increase in property additions was partially offset by a $44 million decrease in net nuclear decommissioning trust activities due to the completion of the Ohio Companies' and Penn's transition cost recovery for decommissioning at the end of 2005.
 
                   During the last half of 2006, capital requirements for property additions and capital leases are expected to be approximately $582 million. FirstEnergy and the Companies have additional requirements of approximately $1.2 billion for maturing long-term debt during the remainder of 2006. These cash requirements are expected to be satisfied from a combination of internal cash, funds raised in the long-term debt capital markets and short-term credit arrangements.
 
                   FirstEnergy's capital spending for the period 2006-2010 is expected to be approximately $6.8 billion (excluding nuclear fuel), of which $1.2 billion applies to 2006. Investments for additional nuclear fuel during the 2006-2010 periods are estimated to be approximately $745 million, of which approximately $164 million applies to 2006. During the same period, FirstEnergy's nuclear fuel investments are expected to be reduced by approximately $564 million and $91 million, respectively, as the nuclear fuel is consumed.

51



GUARANTEES AND OTHER ASSURANCES
 
                  As part of normal business activities, FirstEnergy enters into various agreements on behalf of its subsidiaries to provide financial or performance assurances to third parties. These agreements include contract guarantees, surety bonds, and LOCs. Some of the guaranteed contracts contain collateral provisions that are contingent upon FirstEnergy's credit ratings.
 
                   As of June 30, 2006, FirstEnergy's maximum exposure to potential future payments under outstanding guarantees and other assurances totaled approximately $3.5 billion, as summarized below:

   
Maximum
 
Guarantees and Other Assurances
 
Exposure
 
   
(In millions)
 
FirstEnergy Guarantees of Subsidiaries:
     
Energy and Energy-Related Contracts(1)
 
$
814
 
Other(2)
   
1,081
 
     
1,895
 
         
Surety Bonds
   
146
 
LOC(3)(4)
   
1,471
 
         
Total Guarantees and Other Assurances
 
$
3,512
 

 
(1)
Issued for open-ended terms, with a 10-day termination right by FirstEnergy.
 
(2)
Issued for various terms.
 
(3)
Includes $122 million issued for various terms under LOC capacity available under FirstEnergy’s revolving credit agreement and $730 million outstanding in support of pollution control revenue bonds issued with various maturities.
 
(4)
Includes approximately $194 million pledged in connection with the sale and leaseback of Beaver Valley Unit 2 by CEI and TE, $291 million pledged in connection with the sale and leaseback of Beaver Valley Unit 2 by OE and $134 million pledged in connection with the sale and leaseback of Perry by OE.
 
                           FirstEnergy guarantees energy and energy-related payments of its subsidiaries involved in energy commodity activities principally to facilitate normal physical transactions involving electricity, gas, emission allowances and coal. FirstEnergy also provides guarantees to various providers of subsidiary financing principally for the acquisition of property, plant and equipment. These agreements legally obligate FirstEnergy to fulfill the obligations of its subsidiaries directly involved in these energy and energy-related transactions or financings where the law might otherwise limit the counterparties' claims. If demands of a counterparty were to exceed the ability of a subsidiary to satisfy existing obligations, FirstEnergy's guarantee enables the counterparty's legal claim to be satisfied by FirstEnergy's other assets. The likelihood that such parental guarantees will increase amounts otherwise paid by FirstEnergy to meet its obligations incurred in connection with ongoing energy and energy-related contracts is remote.

While these types of guarantees are normally parental commitments for the future payment of subsidiary obligations, subsequent to the occurrence of a credit rating downgrade or “material adverse event” the immediate posting of cash collateral or provision of an LOC may be required of the subsidiary. As of June 30, 2006, FirstEnergy's maximum exposure under these collateral provisions was $501 million.
 
                  Most of FirstEnergy's surety bonds are backed by various indemnities common within the insurance industry. Surety bonds and related guarantees provide additional assurance to outside parties that contractual and statutory obligations will be met in a number of areas including construction contracts, environmental commitments and various retail transactions.
 
                   FirstEnergy has guaranteed the obligations of the operators of the TEBSA project up to a maximum of $6 million (subject to escalation) under the project's operations and maintenance agreement. In connection with the sale of TEBSA in January 2004, the purchaser indemnified FirstEnergy against any loss under this guarantee. FirstEnergy has also provided an LOC ($36 million as of June 30, 2006) which is renewable and declines yearly based upon the senior outstanding debt of TEBSA.

52


OFF-BALANCE SHEET ARRANGEMENTS
 
                   FirstEnergy has obligations that are not included on its Consolidated Balance Sheets related to the sale and leaseback arrangements involving Perry, Beaver Valley Unit 2 and the Bruce Mansfield Plant, which are satisfied through operating lease payments. The present value of these sale and leaseback operating lease commitments, net of trust investments, total $1.2 billion as of June 30, 2006.

      
                    FirstEnergy has equity ownership interests in certain businesses that are accounted for using the equity method. There are no undisclosed material contingencies related to these investments. Certain guarantees that FirstEnergy does not expect to have a material current or future effect on its financial condition, liquidity or results of operations are disclosed under Guarantees and Other Assurances above.

MARKET RISK INFORMATION
 
                   FirstEnergy uses various market risk sensitive instruments, including derivative contracts, primarily to manage the risk of price and interest rate fluctuations. FirstEnergy's Risk Policy Committee, comprised of members of senior management, provides general oversight to risk management activities throughout FirstEnergy and its subsidiaries.

Commodity Price Risk
 
                   FirstEnergy is exposed to financial and market risks resulting from the fluctuation of interest rates and commodity prices primarily due to fluctuations in electricity, energy transmission, natural gas, coal, nuclear fuel and emission allowance prices. To manage the volatility relating to these exposures, FirstEnergy uses a variety of non-derivative and derivative instruments, including forward contracts, options, futures contracts and swaps. The derivatives are used principally for hedging purposes. Derivatives that fall within the scope of SFAS 133 must be recorded at their fair value and marked to market. The majority of FirstEnergy's derivative hedging contracts qualify for the normal purchase and normal sale exception under SFAS 133 and are therefore excluded from the table below. Contracts that are not exempt from such treatment include certain power purchase agreements with NUG entities that were structured pursuant to the Public Utility Regulatory Policies Act of 1978. These non-trading contracts are adjusted to fair value at the end of each quarter, with a corresponding regulatory asset recognized for above-market costs. On April 1, 2006, FirstEnergy elected to apply the normal purchase and normal sale exception to certain NUG power purchase agreements with a fair value of $13 million (included in “Other” in the table below) in accordance with guidance in DIG C20. The change in the fair value of commodity derivative contracts related to energy production during the three months and six months ended June 30, 2006 is summarized in the following table:

 
Three Months Ended
 
Six Months Ended
 
Increase (Decrease) in the Fair Value
June 30, 2006
 
June 30, 2006
 
of Commodity Derivative Contracts
Non-Hedge
 
Hedge
 
Total
 
Non-Hedge
 
Hedge
 
Total
 
 
(In millions)
 
Change in the Fair Value of
 
 
 
 
 
 
 
 
 
 
 
 
Commodity Derivative Contracts:
 
 
 
 
 
 
 
 
 
 
 
 
Outstanding net liability at beginning of period
$
(1,129
)
$
(5
)
$
(1,134
)
$
(1,170
)
$
(3
)
$
(1,173
)
New contract value when entered
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Additions/change in value of existing contracts
 
(17
)
 
(3
)
 
(20
)
 
(30
)
 
(10
)
 
(40
)
Change in techniques/assumptions
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Settled contracts
 
78
 
 
4
 
 
82
 
 
132
 
 
9
 
 
141
 
Other
 
(13
)
 
-
   
(13
)
 
(13
)
 
-
   
(13
)
Outstanding net liability at end of period(1)
 
(1,081
)
 
(4
)
 
(1,085
)
 
(1,081
)
 
(4
)
 
(1,085
)
 
 
   
 
   
 
   
 
   
 
   
 
   
Non-commodity Net Liabilities at End of Period:
 
   
 
   
 
   
 
   
 
   
 
   
Interest Rate Swaps(2)
 
-
 
 
(25
)
 
(25
)
 
-
 
 
(25
)
 
(25
)
Net Liabilities - Derivative Contracts
at End of Period
$
(1,081
)
$
(29
)
$
(1,110
)
$
(1,081
)
$
(29
)
$
(1,110
)
 
 
   
 
   
 
   
 
   
 
   
 
   
Impact of Changes in Commodity Derivative Contracts(3)
 
   
 
   
 
   
 
   
 
   
 
   
Income Statement effects (pre-tax)
$
(1
)
$
-
 
$
(1
)
$
(3
)
$
-
 
$
(3
)
Balance Sheet effects:
 
   
 
   
 
   
 
   
 
   
 
   
Other comprehensive income (pre-tax)
$
-
 
$
1
 
$
1
 
$
-
 
$
(1
)
$
(1
)
Regulatory assets (net)
$
(62
)
$
-
 
$
(62
)
$
(105
)
$
-
 
$
(105
)

(1) Includes $1,078 million in non-hedge commodity derivative contracts (primarily with NUGs), which are offset by a regulatory asset.
(2) Interest rate swaps are treated as cash flow or fair value hedges (see Interest Rate Swap Agreements below).
(3) Represents the change in value of existing contracts, settled contracts and changes in techniques/assumptions.

53



Derivatives are included on the Consolidated Balance Sheet as of June 30, 2006 as follows:

Balance Sheet Classification
 
Non-Hedge
 
Hedge
 
Total
 
   
(In millions)
 
Current-
             
Other assets
 
$
1
 
$
1
 
$
2
 
Other liabilities
   
(6
)
 
(4
)
 
(10
)
                     
Non-Current-
                   
Other deferred charges
   
47
   
29
   
76
 
Other noncurrent liabilities
   
(1,123
)
 
(55
)
 
(1,178
)
                     
Net liabilities
 
$
(1,081
)
$
(29
)
$
(1,110
)

The valuation of derivative contracts is based on observable market information to the extent that such information is available. In cases where such information is not available, FirstEnergy relies on model-based information. The model provides estimates of future regional prices for electricity and an estimate of related price volatility. FirstEnergy uses these results to develop estimates of fair value for financial reporting purposes and for internal management decision making. Sources of information for the valuation of commodity derivative contracts as of June 30, 2006 are summarized by year in the following table:

Source of Information
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
- Fair Value by Contract Year
 
2006(1)
 
2007
 
2008
 
2009
 
2010
 
Thereafter
 
Total
 
   
(In millions)
 
Prices actively quoted(2)
 
$
(1
)
$
(1
)
$
-
 
$
-
 
 $
-
 
$
-
 
$
(2
)
Other external sources(3)
 
 
(144
)
 
(251
)
 
(220
)
 
-
 
 
-
 
 
-
 
 
(615
)
Prices based on models
 
 
-
 
 
-
 
 
-
 
 
(161
)
 
(138
)
 
(169
)
 
(468
)
Total(4)
 
$
(145
)
$
(252
)
$
(220
)
$
(161
)
$
(138
)
$
(169
)
$
(1,085
)

(1) For the last two quarters of 2006.
(2) Exchange traded.
(3) Broker quote sheets.
 
(4)
Includes $1,078 million in non-hedge commodity derivative contracts (primarily with NUGs), which are offset by a regulatory asset.
 
                    FirstEnergy performs sensitivity analyses to estimate its exposure to the market risk of its commodity positions. A hypothetical 10% adverse shift (an increase or decrease depending on the derivative position) in quoted market prices in the near term on its derivative instruments would not have had a material effect on its consolidated financial position (assets, liabilities and equity) or cash flows as of June 30, 2006. Based on derivative contracts held as of June 30, 2006, an adverse 10% change in commodity prices would decrease net income by approximately $1 million during the next 12 months.

Interest Rate Swap Agreements - Fair Value Hedges

FirstEnergy utilizes fixed-for-floating interest rate swap agreements as part of its ongoing effort to manage the interest rate risk associated with its debt portfolio. These derivatives are treated as fair value hedges of fixed-rate, long-term debt issues - designed to protect against the risk of changes in the fair value of fixed-rate debt instruments when interest rates decrease. Swap maturities, call options, fixed interest rates and interest payment dates match those of the underlying obligations. During the first six months of 2006, FirstEnergy unwound swaps with a total notional amount of $350 million, for which FirstEnergy paid $1 million in cash. The loss will be recognized over the remaining maturity of each respective hedged security as increased interest expense. As of June 30, 2006, the debt underlying the $750 million outstanding notional amount of interest rate swaps had a weighted average fixed interest rate of 5.74%, which the swaps have converted to a current weighted average variable rate of 6.68%.

54



   
June 30, 2006
 
December 31, 2005
 
   
Notional
 
Maturity
 
Fair
 
Notional
 
Maturity
 
Fair
 
Interest Rate Swaps
 
Amount
 
Date
 
Value
 
Amount
 
Date
 
Value
 
   
(In millions)
 
(Fair value hedges)
   $
100
   $
2008
   $
(4
)
 
100
   $
2008
 
$
(3
)
     
50
   
2010
   
(2
)
 
50
   
2010
   
-
 
     
-
   
2011
   
-
   
50
   
2011
   
-
 
     
300
   
2013
   
(17
)
 
450
   
2013
   
(4
)
     
150
   
2015
   
(16
)
 
150
   
2015
   
(9
)
     
-
   
2016
   
-
   
150
   
2016
   
-
 
     
50
   
2025
   
(4
)
 
50
   
2025
   
(1
)
     
100
   
2031
   
(11
)
 
100
   
2031
   
(5
)
   
$
750
       
$
(54
)
$
1,100
       
$
(22
)

Forward Starting Swap Agreements - Cash Flow Hedges
 
                   FirstEnergy utilizes forward starting swap agreements (forward swaps) in order to hedge a portion of the consolidated interest rate risk associated with the anticipated future issuances of fixed-rate, long-term debt securities for one or more of its consolidated subsidiaries in 2006 through 2008. These derivatives are treated as cash flow hedges, protecting against the risk of changes in future interest payments resulting from changes in benchmark U.S. Treasury rates between the date of hedge inception and the date of the debt issuance. During the first six months of 2006, FirstEnergy revised the tenor and timing of its financing plans, and in the second quarter terminated forward swaps with an aggregate notional value of $600 million concurrent with its subsidiaries issuing long-term debt. FirstEnergy received $41 million in cash related to the termination. The gain associated with the ineffective portion of the terminated hedges ($6 million) was recognized in earnings, with the remainder to be recognized over the terms of the respective forward swaps. As of June 30, 2006, FirstEnergy had outstanding forward swaps with an aggregate notional amount of $550 million and an aggregate fair value of $29 million.

   
June 30, 2006
 
December 31, 2005
 
   
Notional
 
Maturity
 
Fair
 
Notional
 
Maturity
 
Fair
 
Forward Starting Swaps
 
Amount
 
Date
 
Value
 
Amount
 
Date
 
Value
 
   
(In millions)
 
(Cash flow hedges)
 
$
25
   
2015
 
$
1
 
$
25
   
2015
 
$
-
 
     
300
   
2016
   
14
   
600
   
2016
   
2
 
     
50
   
2017
   
3
   
25
   
2017
   
-
 
     
125
   
2018
   
8
   
275
   
2018
   
1
 
     
50
   
2020
   
3
   
50
   
2020
   
-
 
   
$
550
       
$
29
 
$
975
       
$
3
 

Equity Price Risk

Included in nuclear decommissioning trusts are marketable equity securities carried at their market value of approximately $1.1 billion as of June 30, 2006 and December 31, 2005. A hypothetical 10% decrease in prices quoted by stock exchanges would result in a $111 million reduction in fair value as of June 30, 2006.

CREDIT RISK
 
                   Credit risk is the risk of an obligor’s failure to meet the terms of an investment contract, loan agreement or otherwise perform as agreed. Credit risk arises from all activities in which success depends on issuer, borrower or counterparty performance, whether reflected on or off the balance sheet. FirstEnergy engages in transactions for the purchase and sale of commodities including gas, electricity, coal and emission allowances. These transactions are often with major energy companies within the industry.
 
                   FirstEnergy maintains credit policies with respect to its counterparties to manage overall credit risk. This includes performing independent risk evaluations, actively monitoring portfolio trends and using collateral and contract provisions to mitigate exposure. As part of its credit program, FirstEnergy aggressively manages the quality of its portfolio of energy contracts, evidenced by a current weighted average risk rating for energy contract counterparties of BBB (S&P). As of June 30, 2006, the largest credit concentration with one party (currently rated investment grade) represented 8.1% of FirstEnergy's total credit risk. Within FirstEnergy's unregulated energy subsidiaries, 99% of credit exposures, net of collateral and reserves, were with investment-grade counterparties as of June 30, 2006.

55



OUTLOOK

Regulatory Matters

            In Ohio, New Jersey and Pennsylvania, laws applicable to electric industry restructuring contain similar provisions that are reflected in the Companies' respective state regulatory plans. These provisions include:

·
restructuring the electric generation business and allowing the Companies' customers to select a competitive electric generation supplier other than the Companies;
   
·
establishing or defining the PLR obligations to customers in the Companies' service areas;
   
·
providing the Companies with the opportunity to recover potentially stranded investment (or transition costs) not otherwise recoverable in a competitive generation market;
   
·
itemizing (unbundling) the price of electricity into its component elements - including generation, transmission, distribution and stranded costs recovery charges;
   
·
continuing regulation of the Companies' transmission and distribution systems; and
   
·
requiring corporate separation of regulated and unregulated business activities.

The Companies and ATSI recognize, as regulatory assets, costs which the FERC, PUCO, PPUC and NJBPU have authorized for recovery from customers in future periods or for which authorization is probable. Without the probability of such authorization, costs currently recorded as regulatory assets would have been charged to income as incurred. Regulatory assets that do not earn a current return totaled approximately $237 million as of June 30, 2006. The following table discloses the regulatory assets by company and by source:

 
June 30,
 
December 31,
 
Increase
 
Regulatory Assets*
 
2006
 
2005
 
(Decrease)
 
 
 
(In millions)
 
OE
 
$
 756
 
$
775
 
$
(19
)
CEI
 
 
 859
 
 
862
 
 
(3
)
TE
 
 
 267
 
 
287
 
 
(20
)
JCP&L
 
 
 2,122
 
 
2,227
 
 
(105
)
Met-Ed
 
 
 359
 
 
310
 
 
49
 
ATSI
 
 
 33
 
 
25
 
 
8
 
Total
 
$
 4,396
 
$
4,486
 
$
(90
)

 
*
Penn had net regulatory liabilities of approximately $59 million as of June 30, 2006 and December 31, 2005. Penelec had net regulatory liabilities of approximately $135 million and $163 million as of June 30, 2006 and December 31, 2005, respectively. These net regulatory liabilities are included in Other Noncurrent Liabilities on the Consolidated Balance Sheets.
 
                    Regulatory assets by source are as follows:

 
 
June 30,
 
December 31,
 
Increase
 
Regulatory Assets By Source
 
2006
 
2005
 
(Decrease)
 
 
 
(In millions)
 
Regulatory transition costs
 
 $
3,365
 
$
3,576
 
$
(211
)
Customer shopping incentives
 
 
644
 
 
884
 
 
(240
)
Customer receivables for future income taxes
 
 
219
 
 
217
 
 
2
 
Societal benefits charge
 
 
19
 
 
29
 
 
(10
)
Loss on reacquired debt
 
 
40
 
 
41
 
 
(1
)
Employee postretirement benefits costs
 
 
51
 
 
55
 
 
(4
)
Nuclear decommissioning, decontamination
 
 
 
 
 
 
 
 
 
 
and spent fuel disposal costs
 
 
(124
 
(126
)
 
2
 
Asset removal costs
 
 
(163
 
(365
)
 
202
 
Property losses and unrecovered plant costs
 
 
24
 
 
29
 
 
(5
)
MISO/PJM transmission costs
 
 
135
 
 
91
 
 
44
 
Fuel costs - RCP
 
 
51
 
 
-
 
 
51
 
Distribution costs - RCP
 
 
81
 
 
-
 
 
81
 
JCP&L reliability costs
 
 
19
 
 
23
 
 
(4
Other
 
 
35
 
 
32
 
 
 3
 
Total
 
$
4,396 
 
$
4,486
 
$
(90
)

56


Reliability Initiatives
 
                   FirstEnergy is proceeding with the implementation of the recommendations that were issued from various entities, including governmental, industry and ad hoc reliability entities (PUCO, FERC, NERC and the U.S. - Canada Power System Outage Task Force) in late 2003 and early 2004, regarding enhancements to regional reliability that were to be completed subsequent to 2004. FirstEnergy will continue to periodically assess the FERC-ordered Reliability Study recommendations for forecasted 2009 system conditions, recognizing revised load forecasts and other changing system conditions which may impact the recommendations. Thus far, implementation of the recommendations has not required, nor is expected to require, substantial investment in new, or material upgrades to existing, equipment. The FERC or other applicable government agencies and reliability coordinators, however, may take a different view as to recommended enhancements or may recommend additional enhancements in the future as the result of adoption of mandatory reliability standards pursuant to EPACT that could require additional, material expenditures.
 
                    As a result of outages experienced in JCP&L’s service area in 2002 and 2003, the NJBPU had implemented reviews into JCP&L’s service reliability. In 2004, the NJBPU adopted an MOU that set out specific tasks related to service reliability to be performed by JCP&L and a timetable for completion and endorsed JCP&L’s ongoing actions to implement the MOU. On June 9, 2004, the NJBPU approved a Stipulation that incorporates the final report of an SRM who made recommendations on appropriate courses of action necessary to ensure system-wide reliability. The Stipulation also incorporates the Executive Summary and Recommendation portions of the final report of a focused audit of JCP&L’s Planning and Operations and Maintenance programs and practices (Focused Audit). A final order in the Focused Audit docket was issued by the NJBPU on July 23, 2004. On February 11, 2005, JCP&L met with the DRA to discuss reliability improvements. The SRM completed his work and issued his final report to the NJBPU on June 1, 2006. A meeting was held between JCP&L and the NJBPU on June 29, 2006 to discuss the SRM’s final report. JCP&L filed a comprehensive response to the NJBPU on July 14, 2006. JCP&L continues to file compliance reports reflecting activities associated with the MOU and Stipulation.
 
                    EPACT provides for the creation of an ERO to establish and enforce reliability standards for the bulk power system, subject to FERC review. On February 3, 2006, the FERC adopted a rule establishing certification requirements for the ERO, as well as regional entities envisioned to assume monitoring responsibility for the new reliability standards. The FERC issued an order on rehearing on March 30, 2006, providing certain clarifications and essentially affirming the rule.
 
                   The NERC has been preparing the implementation aspects of reorganizing its structure to meet the FERC’s certification requirements for the ERO. The NERC made a filing with the FERC on April 4, 2006 to obtain certification as the ERO and to obtain FERC approval of delegation agreements with regional entities. The new FERC rule referred to above, further provides for reorganizing regional reliability organizations (regional entities) that would replace the current regional councils and for rearranging the relationship with the ERO. The “regional entity” may be delegated authority by the ERO, subject to FERC approval, for enforcing reliability standards adopted by the ERO and approved by the FERC. The ERO filing was noticed on April 7, 2006 and comments and reply comments were filed in May, June and July 2006. On July 20, 2006, the FERC certified NERC as the ERO to implement the provisions of Section 215 of the Federal Power Act. The FERC directed NERC to make a compliance filing within ninety days addressing such issues as the regional delegation agreements.
                
                    On April 4, 2006, NERC also submitted a filing with the FERC seeking approval of mandatory reliability standards. These reliability standards are based, with some modifications, on the current NERC Version O reliability standards with some additional standards. The reliability standards filing was noticed by the FERC on April 18, 2006. In that notice, the FERC announced its intent to issue a Notice of Proposed Rulemaking on the proposed reliability standards at a future date. On May 11, 2006, the FERC staff released a preliminary assessment that cited many deficiencies in the proposed reliability standards. The NERC and industry participants filed comments in response to the Staff’s preliminary assessment. The FERC held a technical conference on the proposed reliability standards on July 6, 2006. The chairman has indicated that the FERC intends to act on the proposed reliability standards by issuing a NOPR in September of this year. Interested parties will be given the opportunity to comment on the NOPR. NERC has requested an effective date of January 1, 2007 for the proposed reliability standards.
           
                    The ECAR, Mid-Atlantic Area Council, and Mid-American Interconnected Network reliability councils have completed the consolidation of these regions into a single new regional reliability organization known as ReliabilityFirst Corporation. ReliabilityFirst began operations as a regional reliability council under NERC on January 1, 2006 and intends to file and obtain certification consistent with the final rule as a “regional entity” under the ERO during 2006. All of FirstEnergy’s facilities are located within the ReliabilityFirst region.
 
                   On May 2, 2006, the NERC Board of Trustees adopted eight new cyber security standards that replaced interim standards put in place in the wake of the September 11, 2001 terrorist attacks, and thirteen additional reliability standards. The security standards became effective on June 1, 2006, and the remaining standards will become effective throughout 2006 and 2007. NERC intends to file the standards with the FERC and relevant Canadian authorities for approval.

57



FirstEnergy believes that it is in compliance with all current NERC reliability standards. However, it is expected that the FERC will adopt stricter reliability standards than those contained in the current NERC standards. The financial impact of complying with the new standards cannot be determined at this time. However, EPACT requires that all prudent costs incurred to comply with the new reliability standards be recovered in rates. If FirstEnergy is unable to meet the reliability standards for the bulk power system in the future, it could have a material adverse effect on the Company’s and its subsidiaries’ financial condition, results of operations and cash flows.
 
                    See Note 11 to the consolidated financial statements for a more detailed discussion of reliability initiatives.

Ohio

On October 21, 2003 the Ohio Companies filed their RSP case with the PUCO. On August 5, 2004, the Ohio Companies accepted the RSP as modified and approved by the PUCO in an August 4, 2004 Entry on Rehearing, subject to a CBP. The RSP was intended to establish generation service rates beginning January 1, 2006, in response to the PUCO’s concerns about price and supply uncertainty following the end of the Ohio Companies' transition plan market development period. In October 2004, the OCC and NOAC filed appeals with the Supreme Court of Ohio to overturn the original June 9, 2004 PUCO order in the proceeding as well as the associated entries on rehearing. On September 28, 2005, the Supreme Court of Ohio heard oral arguments on the appeals. On May 3, 2006, the Supreme Court of Ohio issued an opinion affirming the PUCO's order with respect to the approval of the rate stabilization charge, approval of the shopping credits, the granting of interest on shopping credit incentive deferral amounts, and approval of the Ohio Companies’ financial separation plan. It remanded one matter back to the PUCO for further consideration of the issue as to whether the RSP, as adopted by the PUCO, provided for sufficient means for customer participation in the competitive marketplace. On May 12, 2006, the Ohio Companies filed a Motion for Reconsideration with the Supreme Court of Ohio which was denied by the Court on June 21, 2006. The RSP contained a provision that permitted the Ohio Companies to withdraw and terminate the RSP in the event that the PUCO, or the Supreme Court of Ohio, rejected all or part of the RSP. In such event, the Ohio Companies have 30 days from the final order or decision to provide notice of termination. On July 20, 2006 the Ohio Companies filed with the PUCO a Request to Initiate a Proceeding on Remand. In their Request, the Ohio Companies provided notice of termination to those provisions of the RSP subject to termination, subject to being withdrawn, and also set forth a framework for addressing the Supreme Court of Ohio’s findings on customer participation, requesting the PUCO to initiate a proceeding to consider the Ohio Companies’ proposal. If the PUCO approves a resolution to the issues raised by the Supreme Court of Ohio that is acceptable to the Ohio Companies, the Ohio Companies’ termination will be withdrawn and considered to be null and void. Separately, the OCC and NOAC also submitted to the PUCO on July 20, 2006 a conceptual proposal dealing with the issue raised by the Supreme Court of Ohio. On July 26, 2006, the PUCO issued an Entry acknowledging the July 20, 2006 filings of the Ohio Companies and the OCC and NOAC, and giving the Ohio Companies 45 days to file a plan in a new docket to address the Court’s concern.
 
                   The Ohio Companies filed an application and stipulation with the PUCO on September 9, 2005 seeking approval of the RCP. On November 4, 2005, the Ohio Companies filed a supplemental stipulation with the PUCO, which constituted an additional component of the RCP filed on September 9, 2005. Major provisions of the RCP include:

 
Maintaining the existing level of base distribution rates through December 31, 2008 for OE and TE, and April 30, 2009 for CEI;
     
 
Deferring and capitalizing for future recovery (over a 25-year period) with carrying charges certain distribution costs to be incurred during the period January 1, 2006 through December 31, 2008, not to exceed $150 million in each of the three years;
     
 
Adjusting the RTC and extended RTC recovery periods and rate levels so that full recovery of authorized costs will occur as of December 31, 2008 for OE and TE and as of December 31, 2010 for CEI;
     
 
Reducing the deferred shopping incentive balances as of January 1, 2006 by up to $75 million for OE, $45 million for TE, and $85 million for CEI by accelerating the application of each respective company's accumulated cost of removal regulatory liability; and
     
 
Recovering increased fuel costs (compared to a 2002 baseline) of up to $75 million, $77 million, and $79 million, in 2006, 2007, and 2008, respectively, from all OE and TE distribution and transmission customers through a fuel recovery mechanism. OE, TE, and CEI may defer and capitalize (for recovery over a 25-year period) increased fuel costs above the amount collected through the fuel recovery mechanism.


58

 
                   The following table provides the estimated net amortization of regulatory transition costs and deferred shopping incentives (including associated carrying charges) under the RCP for the period 2006 through 2010:

Amortization
 
 
 
 
 
 
 
Total
 
Period
 
OE
 
CEI
 
TE
 
Ohio
 
 
 
(In millions)
 
2006
 
$
177
 
$
95
 
$
86
 
$
358
 
2007
 
 
180
 
 
113
 
 
90
 
 
383
 
2008
 
 
208
 
 
130
 
 
111
 
 
449
 
2009
 
 
-
 
 
211
 
 
-
 
 
211
 
2010
 
 
-
 
 
266
 
 
-
 
 
266
 
Total Amortization
 
$
565
 
$
815
 
$
287
 
$
1,667
 
 
                   On January 4, 2006, the PUCO approved, with modifications, the Ohio Companies’ RCP to supplement the RSP to provide customers with more certain rate levels than otherwise available under the RSP during the plan period. On January 10, 2006, the Ohio Companies filed a Motion for Clarification of the PUCO order approving the RCP. The Ohio Companies sought clarity on issues related to distribution deferrals, including requirements of the review process, timing for recognizing certain deferrals and definitions of the types of qualified expenditures. The Ohio Companies also sought confirmation that the list of deferrable distribution expenditures originally included in the revised stipulation fall within the PUCO order definition of qualified expenditures. On January 25, 2006, the PUCO issued an Entry on Rehearing granting in part, and denying in part, the Ohio Companies’ previous requests and clarifying issues referred to above. The PUCO granted the Ohio Companies’ requests to:

 
·
Recognize fuel and distribution deferrals commencing January 1, 2006;
 
   
 
·
Recognize distribution deferrals on a monthly basis prior to review by the PUCO Staff;
     
 
·
Clarify that the types of distribution expenditures included in the Supplemental Stipulation may be deferred; and
     
 
·
Clarify that distribution expenditures do not have to be “accelerated” in order to be deferred.
 
                    The PUCO approved the Ohio Companies’ methodology for determining distribution deferral amounts, but denied the Motion in that the PUCO Staff must verify the level of distribution expenditures contained in current rates, as opposed to simply accepting the amounts contained in the Ohio Companies’ Motion. On February 3, 2006, several other parties filed applications for rehearing on the PUCO's January 4, 2006 Order. The Ohio Companies responded to the applications for rehearing on February 13, 2006. In an Entry on Rehearing issued by the PUCO on March 1, 2006, all motions for rehearing were denied. Certain of these parties have subsequently filed notices of appeal with the Supreme Court of Ohio alleging various errors made by the PUCO in its order approving the RCP. The Ohio Companies’ Motion to Intervene in the appeals was granted by the Supreme Court on June 8, 2006. The Appellants’ Merit Briefs were filed at the Supreme Court on July 5, 2006. The Appellees include the PUCO and the Ohio Companies. The Appellees’ Merit Briefs are due on August 4, 2006. Appellants’ Reply Briefs will then be due on August 24, 2006.
 
                    On December 30, 2004, the Ohio Companies filed with the PUCO two applications related to the recovery of transmission and ancillary service related costs. The first application sought recovery of these costs beginning January 1, 2006. The Ohio Companies requested that these costs be recovered through a rider that would be effective on January 1, 2006 and adjusted each July 1 thereafter. The parties reached a settlement agreement that was approved by the PUCO on August 31, 2005. The incremental transmission and ancillary service revenues recovered from January 1 through June 30, 2006 were approximately $61 million. That amount included the recovery of a portion of the 2005 deferred MISO expenses as described below. On May 1, 2006, the Ohio Companies filed a modification to the rider to determine revenues ($141 million) from July 2006 through June 2007.

59


 
                   The second application sought authority to defer costs associated with transmission and ancillary service related costs incurred during the period October 1, 2003 through December 31, 2005. On May 18, 2005, the PUCO granted the accounting authority for the Ohio Companies to defer incremental transmission and ancillary service-related charges incurred as a participant in MISO, but only for those costs incurred during the period December 30, 2004 through December 31, 2005. Permission to defer costs incurred prior to December 30, 2004 was denied. The PUCO also authorized the Ohio Companies to accrue carrying charges on the deferred balances. On August 31, 2005, the OCC appealed the PUCO's decision. On January 20, 2006, the OCC sought rehearing of the PUCO’s approval of the recovery of deferred costs through the rider during the period January 1, 2006 through June 30, 2006. The PUCO denied the OCC's application on February 6, 2006. On March 23, 2006, the OCC appealed the PUCO's order to the Ohio Supreme Court. On March 27, 2006, the OCC filed a motion to consolidate this appeal with the deferral appeals discussed above and to postpone oral arguments in the deferral appeal until after all briefs are filed in this most recent appeal of the rider recovery mechanism. On March 20, 2006, the Ohio Supreme Court, on its own motion, consolidated the OCC's appeal of the Ohio Companies' case with a similar case involving Dayton Power & Light Company. Oral arguments were heard on May 10, 2006. The Ohio Companies are unable to predict when a decision may be issued.

   See Note 11 to the consolidated financial statements for further details and a complete discussion of regulatory matters in Ohio.

Pennsylvania
 
                   As of June 30, 2006, Met-Ed's and Penelec's regulatory deferrals pursuant to the 1998 Restructuring Settlement (including the Phase 2 Proceedings) and the FirstEnergy/GPU Merger Settlement Stipulation were $335 million and $57 million, respectively. Penelec's $57 million is subject to the pending resolution of taxable income issues associated with NUG trust fund proceeds. The PPUC is reviewing a January 2006 change in Met-Ed’s and Penelec’s NUG purchase power stranded cost accounting methodology. If the PPUC orders Met-Ed and Penelec to reverse the change in accounting methodology, this would result in a pre-tax loss of $10.3 million for Met-Ed.

On January 12, 2005, Met-Ed and Penelec filed, before the PPUC, a request for deferral of transmission-related costs beginning January 1, 2005. The OCA, OSBA, OTS, MEIUG, PICA, Allegheny Electric Cooperative and Pennsylvania Rural Electric Association all intervened in the case. Met-Ed and Penelec sought to consolidate this proceeding (and modified their request to provide deferral of 2006 transmission-related costs only) with the comprehensive rate filing they made on April 10, 2006 as described below. On May 4, 2006, the PPUC approved the modified request. Accordingly, Met-Ed and Penelec have deferred approximately $46 million and $12 million, respectively, representing transmission costs that were incurred from January 1, 2006 through June 30, 2006. On June 5, 2006, the OCA filed before the Commonwealth Court a petition for review of the PPUC's approval of the deferral. On July 12, 2006 the Commonwealth Court granted the PPUC’s motion to quash the OCA’s appeal. The ratemaking treatment of the deferrals will be determined in the comprehensive rate filing proceeding discussed further below.
 
                    Met-Ed and Penelec purchase a portion of their PLR requirements from FES through a wholesale power sales agreement. Under this agreement, FES retains the supply obligation and the supply profit and loss risk for the portion of power supply requirements not self-supplied by Met-Ed and Penelec under their contracts with NUGs and other unaffiliated suppliers. The FES arrangement reduces Met-Ed's and Penelec's exposure to high wholesale power prices by providing power at a fixed price for their uncommitted PLR energy costs during the term of the agreement with FES. The wholesale power sales agreement with FES could automatically be extended for each successive calendar year unless any party elects to cancel the agreement by November 1 of the preceding year. On November 1, 2005, FES and the other parties thereto amended the agreement to provide FES the right in 2006 to terminate the agreement at any time upon 60 days notice. On April 7, 2006, the parties to the wholesale power sales agreement entered into a Tolling Agreement that arises out of FES’ notice to Met-Ed and Penelec that FES elected to exercise its right to terminate the wholesale power sales agreement effective midnight December 31, 2006, because that agreement is not economically sustainable to FES.
 
                    In lieu of allowing such termination to become effective as of December 31, 2006, the parties agreed, pursuant to the Tolling Agreement, to amend the wholesale power sales agreement to provide as follows:

   1.  The termination provisions of the wholesale power sales agreement will be tolled for one year until December 31, 2007, provided that during such tolling period:

  a. FES will be permitted to terminate the wholesale power sales agreement at any time with sixty days written notice;

60


  b.  Met-Ed and Penelec will procure through arrangements other than the wholesale power sales agreement beginning December 1, 2006 and ending December 31, 2007, approximately 33% of the amounts of capacity and energy necessary to satisfy their PLR obligations for which Committed Resources (i.e., non-utility generation under contract to Met-Ed and Penelec, Met-Ed- and Penelec-owned generating facilities, purchased power contracts and distributed generation) have not been obtained; and
 
c.    FES will not be obligated to supply additional quantities of capacity and energy in the event that a supplier of Committed Resources defaults on its supply agreement.

   2.   During the tolling period, FES will not act as an agent for Met-Ed or Penelec in procuring the services under 1.(b) above; and

   3. The pricing provision of the wholesale power sales agreement shall remain unchanged provided Met-Ed and Penelec comply with the provisions of the Tolling Agreement and any applicable provision of the wholesale power sales agreement.

 In the event that FES elects not to terminate the wholesale power sales agreement effective midnight December 31, 2007, similar tolling agreements effective after December 31, 2007 are expected to be considered by FES for subsequent years if Met-Ed and Penelec procure through arrangements other than the wholesale power sales agreement approximately 64%, 83% and 95% of the additional amounts of capacity and energy necessary to satisfy their PLR obligations for 2008, 2009 and 2010, respectively, for which Committed Resources have not been obtained from the market.

The wholesale power sales agreement, as modified by the Tolling Agreement, requires Met-Ed and Penelec to satisfy the portion of their PLR obligations currently supplied by FES from unaffiliated suppliers at prevailing prices, which are likely to be higher than the current price charged by FES under the current agreement and, as a result, Met-Ed’s and Penelec’s purchased power costs could materially increase. If Met-Ed and Penelec were to replace the entire FES supply at current market power prices without corresponding regulatory authorization to increase their generation prices to customers, each company would likely incur a significant increase in operating expenses and experience a material deterioration in credit quality metrics. Under such a scenario, each company's credit profile would no longer be expected to support an investment grade rating for its fixed income securities. There can be no assurance, however, that if FES ultimately determines to terminate, or significantly modify the agreement, timely regulatory relief will be granted by the PPUC pursuant to the April 10, 2006 comprehensive rate filing discussed below, or, to the extent granted, adequate to mitigate such adverse consequences.

Met-Ed and Penelec made a comprehensive rate filing with the PPUC on April 10, 2006 that addresses a number of transmission, distribution and supply issues. If Met-Ed's and Penelec's preferred approach involving accounting deferrals is approved, the filing would increase annual revenues by $216 million and $157 million, respectively. That filing includes, among other things, a request to charge customers for an increasing amount of market priced power procured through a CBP as the amount of supply provided under the existing FES agreement is phased out in accordance with the April 7, 2006 Tolling Agreement described above. Met-Ed and Penelec also requested approval of the January 12, 2005 petition for the deferral of transmission-related costs discussed above, but only for those costs incurred during 2006. In this rate filing, Met-Ed and Penelec also requested recovery of annual transmission and related costs incurred on or after January 1, 2007, plus the amortized portion of 2006 costs over a ten-year period, along with applicable carrying charges, through an adjustable rider similar to that implemented in Ohio. Changes in the recovery of NUG expenses and the recovery of Met-Ed's non-NUG stranded costs are also included in the filing. The filing contemplates a reduction in distribution rates for Met-Ed of $37 million annually and an increase in distribution rates for Penelec of $20 million annually. The PPUC suspended the effective date (June 10, 2006) of the rate changes for seven months after the filing as permitted under Pennsylvania law.
If the PPUC adopts the overall positions taken in the intervenors’ testimony as filed, this would have a material adverse effect on the financial statements of FirstEnergy, Met-Ed and Penelec. Hearings are scheduled for late August 2006 and a PPUC decision is expected early in the first quarter of 2007.

Under Pennsylvania's electric competition law, Penn is required to secure generation supply for customers who do not choose alternative suppliers for their electricity. On October 11, 2005, Penn filed a plan with the PPUC to secure electricity supply for its customers at set rates following the end of its transition period on December 31, 2006. Penn recommended that the RFP process cover the period January 1, 2007 through May 31, 2008. To the extent that an affiliate of Penn supplies a portion of the PLR load included in the RFP, authorization to make the affiliate sale must be obtained from the FERC. Hearings before the PPUC were held on January 10, 2006 with main briefs filed on January 27, 2006 and reply briefs filed on February 3, 2006. On February 16, 2006, the ALJ issued a Recommended Decision to adopt Penn's RFP process with modifications. On April 20, 2006, the PPUC approved the Recommended Decision with additional modifications to use an RFP process to obtain Penn's power supply requirements after 2006 through two separate solicitations. An initial solicitation was held for Penn in May 2006 with all tranches fully subscribed. On June 2, 2006, the PPUC approved the bid results for the first solicitation. On July 18, 2006, the second PLR solicitation was held for Penn. The tranches for the Residential Group and Small Commercial Group were fully subscribed. However, supply was only acquired for three of the five tranches for the Large Commercial Group. On July 20, 2006, the PPUC approved the submissions for the second bid. A residual solicitation is scheduled to be held on August 15, 2006 for the two remaining Large Commercial Group tranches. Acceptance of the winning bids is subject to approval by the PPUC.

61



On May 25, 2006, Penn filed a Petition for Review of the PPUC’s Orders of April 28, 2006 and May 4, 2006, which together decided the issues associated with Penn’s proposed Interim PLR Supply Plan. Penn has asked the Commonwealth Court to review the PPUC’s decision to deny its recovery of certain PLR costs via a reconciliation mechanism and its decision to impose a geographic limitation on the sources of alternative energy credits. On June 7, 2006, the PaDEP filed a Petition for Review appealing the PPUC’s ruling on the method by which alternative energy credits may be acquired and traded. Penn is unable to predict the outcome of this appeal.

See Note 11 to the consolidated financial statements for further details and a complete discussion of regulatory matters in Pennsylvania.

New Jersey

JCP&L is permitted to defer for future collection from customers the amounts by which its costs of supplying BGS to non-shopping customers and costs incurred under NUG agreements exceed amounts collected through BGS and NUGC rates and market sales of NUG energy and capacity. As of June 30, 2006, the accumulated deferred cost balance totaled approximately $638 million. New Jersey law allows for securitization of JCP&L's deferred balance upon application by JCP&L and a determination by the NJBPU that the conditions of the New Jersey restructuring legislation are met. On February 14, 2003, JCP&L filed for approval to securitize the July 31, 2003 deferred balance. On June 8, 2006, the NJBPU approved JCP&L’s request to issue securitization bonds associated with BGS stranded cost deferrals. On August 4, 2006, JCP&L Transition Funding II, a wholly owned subsidiary of JCP&L, secured pricing on the issuance of $182 million of transition bonds with a weighted average interest rate of 5.5%.

On December 2, 2005, JCP&L filed a request for recovery of $165 million of actual above-market NUG costs incurred from August 1, 2003 through October 31, 2005 and forecasted above-market NUG costs for November and December 2005. On February 23, 2006, JCP&L filed updated data reflecting actual amounts through December 31, 2005 of $154 million of cost incurred since July 31, 2003. On March 29, 2006, a pre-hearing conference was held with the presiding ALJ. A schedule for the proceeding was established including a discovery period and evidentiary hearings scheduled for September 2006.

An NJBPU Decision and Order approving a Phase II Stipulation of Settlement and resolving the Motion for Reconsideration of the Phase I Order was issued on May 31, 2005. The Phase II Settlement includes a performance standard pilot program with potential penalties of up to 0.25% of allowable equity return. The Order requires that JCP&L file quarterly reliability reports (CAIDI and SAIFI information related to the performance pilot program) through December 2006 and updates to reliability related project expenditures until all projects are completed. The last of the quarterly reliability reports was submitted on June 12, 2006. As of June 30, 2006, there were no performance penalties issued by the NJBPU.

On August 1, 2005, the NJBPU established a proceeding to determine whether additional ratepayer protections are required at the state level in light of the repeal of PUHCA pursuant to the EPACT. An NJBPU proposed rulemaking to address the issues was published in the NJ Register on December 19, 2005. The proposal would prevent a holding company that owns a gas or electric public utility from investing more than 25% of the combined assets of its utility and utility-related subsidiaries into businesses unrelated to the utility industry. A public hearing was held on February 7, 2006 and comments were submitted to the NJBPU. The NJBPU Staff issued a draft proposal on March 31, 2006 addressing various issues including access to books and records, ring-fencing, cross subsidization, corporate governance and related matters. With the approval of the NJBPU Staff, the affected utilities jointly submitted an alternative proposal on June 1, 2006. Comments on the alternative proposal were submitted on June 15, 2006. JCP&L is unable to predict the outcome of this proposal.

See Note 11 to the consolidated financial statements for further details and a complete discussion of regulatory matters in New Jersey.

FERC Matters

On November 18, 2004, the FERC issued an order eliminating the RTOR for transmission service between the MISO and PJM regions. The FERC also ordered the MISO, PJM and the transmission owners within MISO and PJM to submit compliance filings containing a SECA mechanism to recover lost RTOR revenues during a 16-month transition period from load serving entities. The FERC issued orders in 2005 setting the SECA for hearing. ATSI, JCP&L, Met-Ed, Penelec, and FES continue to be involved in the FERC hearings concerning the calculation and imposition of the SECA charges. The hearing was held in May 2006. Initial briefs were submitted on June 9, 2006, and reply briefs were filed on June 27, 2006. The FERC has ordered the Presiding Judge to issue an initial decision by August 11, 2006.

62



    On November 1, 2004, ATSI filed with FERC a request to defer approximately $54 million of costs to be incurred from 2004 through 2007 in connection with ATSI’s VMEP, which represents ATSI’s adoption of newly identified industry “best practices” for vegetation management. On March 4, 2005, the FERC approved ATSI’s request to defer the VMEP costs (approximately $33 million deferred as of June 30, 2006). On March 28, 2006, ATSI and MISO filed with the FERC a request to modify ATSI’s Attachment O formula rate to include revenue requirements associated with recovery of deferred VMEP costs over a five-year period. The requested effective date to begin recovery was June 1, 2006. Various parties filed comments responsive to the March 28, 2006 submission. The FERC conditionally approved the filing on May 22, 2006, subject to a compliance filing that ATSI made on June 13, 2006. A request for rehearing of the FERC’s May 22, 2006 Order was filed by a party, which ATSI answered. On July 21, 2006, the FERC issued an order stating that it needs more time to consider the matter. In light of that order, there is no time period by which the FERC must act on the pending rehearing request. On July 14, 2006, the FERC accepted the ATSI’s June 13, 2006 compliance filing. The estimated annual revenues to ATSI from the VMEP cost recovery is $12 million.

On January 24, 2006, ATSI and MISO filed a request with the FERC to correct ATSI’s Attachment O formula rate to reverse revenue credits associated with termination of revenue streams from transitional rates stemming from FERC’s elimination of RTOR. Revenues formerly collected under these rates were included in, and served to reduce, ATSI’s zonal transmission rate under the Attachment O formula. Absent the requested correction, elimination of these revenue streams would not be fully reflected in ATSI’s formula rate until June 1, 2008. On March 16, 2006, the FERC approved the revenue credit correction without suspension, effective April 1, 2006. One party sought rehearing of the FERC's order. The request for rehearing of this order was denied on June 27, 2006. The FERC accepted MISO’s and ATSI’s revised tariff sheets for filing on June 7, 2006. The estimated annual revenue impact of the correction mechanism is approximately $40 million effective on June 1, 2006.
 
                  On January 31, 2005, certain PJM transmission owners made three filings with the FERC pursuant to a settlement agreement previously approved by the FERC. JCP&L, Met-Ed and Penelec were parties to that proceeding and joined in two of the filings. In the first filing, the settling transmission owners submitted a filing justifying continuation of their existing rate design within the PJM RTO. In the second filing, the settling transmission owners proposed a revised Schedule 12 to the PJM tariff designed to harmonize the rate treatment of new and existing transmission facilities. Interventions and protests were filed on February 22, 2005. In the third filing, Baltimore Gas and Electric Company and Pepco Holdings, Inc. requested a formula rate for transmission service provided within their respective zones. On May 31, 2005, the FERC issued an order on these cases. First, it set for hearing the existing rate design and indicated that it will issue a final order within six months. American Electric Power Company, Inc. filed in opposition proposing to create a "postage stamp" rate for high voltage transmission facilities across PJM. Second, the FERC approved the proposed Schedule 12 rate harmonization. Third, the FERC accepted the proposed formula rate, subject to refund and hearing procedures. On June 30, 2005, the settling PJM transmission owners filed a request for rehearing of the May 31, 2005 order. On March 20, 2006, a settlement was filed with FERC in the formula rate proceeding that generally accepts the companies' formula rate proposal. The FERC issued an order approving this settlement on April 19, 2006. Hearings in the PJM rate design case concluded in April 2006. On July 13, 2006, an Initial Decision was issued by the ALJ. The ALJ adopted the Trial Staff’s position that the cost of all PJM transmission facilities should be recovered through a postage stamp rate. The ALJ recommended an April 1, 2006 effective date for this change in rate design. If the FERC accepts this recommendation, the transmission rate applicable to many load zones in PJM would increase. FirstEnergy believes that significant additional transmission revenues would have to be recovered from the JCP&L, Met-Ed and Penelec transmission zones within PJM. The Companies, as part of the Responsible Pricing Alliance, intend to submit a brief on exceptions within thirty days of the initial decision. Following submission of reply exceptions, the case is expected to be reviewed by the FERC with a decision anticipated in the fourth quarter of 2006.
 
                   On November 1, 2005, FES filed two power sales agreements for approval with the FERC. One power sales agreement provided for FES to provide the PLR requirements of the Ohio Companies at a price equal to the retail generation rates approved by the PUCO for a period of three years beginning January 1, 2006. The Ohio Companies will be relieved of their obligation to obtain PLR power requirements from FES if the Ohio CBP results in a lower price for retail customers. A similar power sales agreement between FES and Penn permits Penn to obtain its PLR power requirements from FES at a fixed price equal to the retail generation price during 2006. The PPUC approved Penn's plan with modifications on April 20, 2006 to use an RFP process to obtain its power supply requirements after 2006 through two separate solicitations. An initial solicitation was held for Penn in May 2006 with all tranches fully subscribed. On June 2, 2006, the PPUC approved the bid results for the first solicitation. On July 18, 2006, the second PLR solicitation was held for Penn. The tranches for the Residential Group and Small Commercial Group were fully subscribed. However, supply was only acquired for three of the five tranches for the Large Commercial Group. On July 20, 2006, the PPUC approved the submission for the second bid. A residual solicitation is scheduled to be held on August 15, 2006 for the two remaining Large Commercial Group tranches. Acceptance of the winning bids is subject to approval by the PPUC.

 

 
63



On December 29, 2005, the FERC issued an order setting the two power sales agreements for hearing. The order criticized the Ohio CBP, and required FES to submit additional evidence in support of the reasonableness of the prices charged in the power sales agreements. A pre-hearing conference was held on January 18, 2006 to determine the hearing schedule in this case. Under the procedural schedule, aproved in this case, FES expected an initial decision to be issued in late January 2007. However, on July 14, 2006, the Chief Judge granted the joint motion of FES and the Trial Staff to appoint a settlement judge in this proceeding. The procedural schedule has been suspended pending negotiations among the parties.

Environmental Matters

FirstEnergy accrues environmental liabilities only when it concludes that it is probable that it has an obligation for such costs and can reasonably estimate the amount of such costs. Unasserted claims are reflected in FirstEnergy’s determination of environmental liabilities and are accrued in the period that they are both probable and reasonably estimable.

On December 1, 2005, FirstEnergy issued a comprehensive report to shareholders regarding air emissions regulations and an assessment of future risks and mitigation efforts. The report is available on FirstEnergy's Web site at www.firstenergycorp.com/environmental.

Clean Air Act Compliance

FirstEnergy is required to meet federally approved SO2 regulations. Violations of such regulations can result in shutdown of the generating unit involved and/or civil or criminal penalties of up to $32,500 for each day the unit is in violation. The EPA has an interim enforcement policy for SO2 regulations in Ohio that allows for compliance based on a 30-day averaging period. FirstEnergy cannot predict what action the EPA may take in the future with respect to the interim enforcement policy.

The EPA Region 5 issued a Finding of Violation and NOV to the Bay Shore Power Plant dated June 15, 2006 alleging violations to various sections of the Clean Air Act. A meeting has been scheduled for August 8, 2006 to discuss the alleged violations with the EPA.

FirstEnergy believes it is complying with SO2 reduction requirements under the Clean Air Act Amendments of 1990 by burning lower-sulfur fuel, generating more electricity from lower-emitting plants, and/or using emission allowances. NOX reductions required by the 1990 Amendments are being achieved through combustion controls and the generation of more electricity at lower-emitting plants. In September 1998, the EPA finalized regulations requiring additional NOX reductions from FirstEnergy's facilities. The EPA's NOX Transport Rule imposes uniform reductions of NOX emissions (an approximate 85% reduction in utility plant NOX emissions from projected 2007 emissions) across a region of nineteen states (including Michigan, New Jersey, Ohio and Pennsylvania) and the District of Columbia based on a conclusion that such NOX emissions are contributing significantly to ozone levels in the eastern United States. FirstEnergy believes its facilities are also complying with the NOX budgets established under State Implementation Plans through combustion controls and post-combustion controls, including Selective Catalytic Reduction and Selective Non-Catalytic Reduction systems, and/or using emission allowances.

National Ambient Air Quality Standards

In July 1997, the EPA promulgated changes in the NAAQS for ozone and fine particulate matter. In March 2005, the EPA finalized CAIR covering a total of 28 states (including Michigan, New Jersey, Ohio and Pennsylvania) and the District of Columbia based on proposed findings that air emissions from 28 eastern states and the District of Columbia significantly contribute to non-attainment of the NAAQS for fine particles and/or the "8-hour" ozone NAAQS in other states. CAIR provides each affected state until 2006 to develop implementing regulations to achieve additional reductions of NOX and SO2 emissions in two phases (Phase I in 2009 for NOX, 2010 for SO2 and Phase II in 2015 for both NOX and SO2). FirstEnergy's Michigan, Ohio and Pennsylvania fossil-fired generation facilities will be subject to caps on SO2 and NOX emissions, whereas its New Jersey fossil-fired generation facility will be subject to a cap on NOX emissions only. According to the EPA, SO2 emissions will be reduced by 45% (from 2003 levels) by 2010 across the states covered by the rule, with reductions reaching 73% (from 2003 levels) by 2015, capping SO2 emissions in affected states to just 2.5 million tons annually. NOX emissions will be reduced by 53% (from 2003 levels) by 2009 across the states covered by the rule, with reductions reaching 61% (from 2003 levels) by 2015, achieving a regional NOX cap of 1.3 million tons annually. The future cost of compliance with these regulations may be substantial and will depend on how they are ultimately implemented by the states in which the Companies operate affected facilities.

64


Mercury Emissions

In December 2000, the EPA announced it would proceed with the development of regulations regarding hazardous air pollutants from electric power plants, identifying mercury as the hazardous air pollutant of greatest concern. In March 2005, the EPA finalized CAMR, which provides for a cap-and-trade program to reduce mercury emissions from coal-fired power plants in two phases. Initially, mercury emissions will be capped nationally at 38 tons by 2010 (as a "co-benefit" from implementation of SO2 and NOX emission caps under the EPA's CAIR program). Phase II of the mercury cap-and-trade program will cap nationwide mercury emissions from coal-fired power plants at 15 tons per year by 2018. However, the final rules give states substantial discretion in developing rules to implement these programs. In addition, both CAIR and CAMR have been challenged in the United States Court of Appeals for the District of Columbia. FirstEnergy's future cost of compliance with these regulations may be substantial and will depend on how they are ultimately implemented by the states in which FirstEnergy operates affected facilities.

The model rules for both CAIR and CAMR contemplate an input-based methodology to allocate allowances to affected facilities. Under this approach, allowances would be allocated based on the amount of fuel consumed by the affected sources. FirstEnergy would prefer an output-based generation-neutral methodology in which allowances are allocated based on megawatts of power produced. Since this approach is based on output, new and non-emitting generating facilities, including renewables and nuclear, would be entitled to their proportionate share of the allowances. Consequently, FirstEnergy would be disadvantaged if these model rules were implemented because FirstEnergy’s substantial reliance on non-emitting (largely nuclear) generation is not recognized under the input-based allocation.

Pennsylvania has proposed a new rule to regulate mercury emissions from coal-fired power plants that does not provide a cap and trade approach as in CAMR, but rather follows a command and control approach imposing emission limits on individual sources. If adopted as proposed, Pennsylvania’s mercury regulation would deprive FirstEnergy of mercury emission allowances that were to be allocated to the Mansfield Plant under CAMR and that would otherwise be available for achieving FirstEnergy system-wide compliance. The future cost of compliance with these regulations, if adopted and implemented as proposed, may be substantial.

W. H. Sammis Plant

In 1999 and 2000, the EPA issued NOV or Compliance Orders to nine utilities alleging violations of the Clean Air Act based on operation and maintenance of 44 power plants, including the W. H. Sammis Plant, which was owned at that time by OE and Penn. In addition, the DOJ filed eight civil complaints against various investor-owned utilities, including a complaint against OE and Penn in the U.S. District Court for the Southern District of Ohio. These cases are referred to as New Source Review cases. On March 18, 2005, OE and Penn announced that they had reached a settlement with the EPA, the DOJ and three states (Connecticut, New Jersey, and New York) that resolved all issues related to the W. H. Sammis Plant New Source Review litigation. This settlement agreement was approved by the Court on July 11, 2005, and requires reductions of NOX and SO2 emissions at the W. H. Sammis Plant and other coal fired plants through the installation of pollution control devices and provides for stipulated penalties for failure to install and operate such pollution controls in accordance with that agreement. Consequently, if FirstEnergy fails to install such pollution control devices, for any reason, including, but not limited to, the failure of any third-party contractor to timely meet its delivery obligations for such devices, FirstEnergy could be exposed to penalties under the settlement agreement. Capital expenditures necessary to meet those requirements are currently estimated to be $1.5 billion (the primary portion of which is expected to be spent in the 2008 to 2011 time period). On August 26, 2005, FGCO entered into an agreement with Bechtel Power Corporation under which Bechtel will engineer, procure, and construct air quality control systems for the reduction of sulfur dioxide emissions. The settlement agreement also requires OE and Penn to spend up to $25 million toward environmentally beneficial projects, which include wind energy purchased power agreements over a 20-year term. OE and Penn agreed to pay a civil penalty of $8.5 million. Results for the first quarter of 2005 included the penalties paid by OE and Penn of $7.8 million and $0.7 million, respectively. OE and Penn also recognized liabilities in the first quarter of 2005 of $9.2 million and $0.8 million, respectively, for probable future cash contributions toward environmentally beneficial projects.

Climate Change

In December 1997, delegates to the United Nations' climate summit in Japan adopted an agreement, the Kyoto Protocol, to address global warming by reducing the amount of man-made GHG emitted by developed countries by 5.2% from 1990 levels between 2008 and 2012. The United States signed the Kyoto Protocol in 1998 but it failed to receive the two-thirds vote of the United States Senate required for ratification. However, the Bush administration has committed the United States to a voluntary climate change strategy to reduce domestic GHG intensity - the ratio of emissions to economic output - by 18% through 2012. The EPACT established a Committee on Climate Change Technology to coordinate federal climate change activities and promote the development and deployment of GHG reducing technologies.

65



FirstEnergy cannot currently estimate the financial impact of climate change policies, although the potential restrictions on CO2 emissions could require significant capital and other expenditures. However, the CO2 emissions per kilowatt-hour of electricity generated by the Companies is lower than many regional competitors due to the Companies' diversified generation sources which include low or non-CO2 emitting gas-fired and nuclear generators.

Regulation of Hazardous Waste

The Companies have been named as PRPs at waste disposal sites, which may require cleanup under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980. Allegations of disposal of hazardous substances at historical sites and the liability involved are often unsubstantiated and subject to dispute; however, federal law provides that all PRPs for a particular site are liable on a joint and several basis. Therefore, environmental liabilities that are considered probable have been recognized on the Consolidated Balance Sheet as of June 30, 2006, based on estimates of the total costs of cleanup, the Companies' proportionate responsibility for such costs and the financial ability of other unaffiliated entities to pay. In addition, JCP&L has accrued liabilities for environmental remediation of former manufactured gas plants in New Jersey. Those costs are being recovered by JCP&L through a non-bypassable SBC. Total liabilities of approximately $70 million have been accrued through June 30, 2006.
 
                          See Note 10(B) to the consolidated financial statements for further details and a complete discussion of environmental matters.

Other Legal Proceedings

Power Outages and Related Litigation

On August 14, 2003, various states and parts of southern Canada experienced widespread power outages. The outages affected approximately 1.4 million customers in FirstEnergy's service area. The U.S. - Canada Power System Outage Task Force’s final report in April 2004 on the outages concluded, among other things, that the problems leading to the outages began in FirstEnergy’s Ohio service area. Specifically, the final report concluded, among other things, that the initiation of the August 14, 2003 power outages resulted from an alleged failure of both FirstEnergy and ECAR to assess and understand perceived inadequacies within the FirstEnergy system; inadequate situational awareness of the developing conditions; and a perceived failure to adequately manage tree growth in certain transmission rights of way. The Task Force also concluded that there was a failure of the interconnected grid's reliability organizations (MISO and PJM) to provide effective real-time diagnostic support. The final report is publicly available through the Department of Energy’s Web site (www.doe.gov). FirstEnergy believes that the final report does not provide a complete and comprehensive picture of the conditions that contributed to the August 14, 2003 power outages and that it does not adequately address the underlying causes of the outages. FirstEnergy remains convinced that the outages cannot be explained by events on any one utility's system. The final report contained 46 “recommendations to prevent or minimize the scope of future blackouts.” Forty-five of those recommendations related to broad industry or policy matters while one, including subparts, related to activities the Task Force recommended be undertaken by FirstEnergy, MISO, PJM, ECAR, and other parties to correct the causes of the August 14, 2003 power outages. FirstEnergy implemented several initiatives, both prior to and since the August 14, 2003 power outages, which were independently verified by NERC as complete in 2004 and were consistent with these and other recommendations and collectively enhance the reliability of its electric system. FirstEnergy’s implementation of these recommendations in 2004 included completion of the Task Force recommendations that were directed toward FirstEnergy. FirstEnergy is also proceeding with the implementation of the recommendations that were to be completed subsequent to 2004 and will continue to periodically assess the FERC-ordered Reliability Study recommendations for forecasted 2009 system conditions, recognizing revised load forecasts and other changing system conditions which may impact the recommendations. Thus far, implementation of the recommendations has not required, nor is expected to require, substantial investment in new or material upgrades to existing equipment. The FERC or other applicable government agencies and reliability coordinators may, however, take a different view as to recommended enhancements or may recommend additional enhancements in the future as the result of adoption of mandatory reliability standards pursuant to the EPACT that could require additional material expenditures.

66



FirstEnergy companies also are defending six separate complaint cases before the PUCO relating to the August 14, 2003 power outage. Two cases were originally filed in Ohio State courts but were subsequently dismissed for lack of subject matter jurisdiction and further appeals were unsuccessful. In these cases the individual complainants—three in one case and four in the other—sought to represent others as part of a class action. The PUCO dismissed the class allegations, stating that its rules of practice do not provide for class action complaints. Three other pending PUCO complaint cases were filed by various insurance carriers either in their own name as subrogees or in the name of their insured. In each of these three cases, the carrier seeks reimbursement from various FirstEnergy companies (and, in one case, from PJM, MISO and American Electric Power Company, Inc., as well) for claims paid to insureds for damages allegedly arising as a result of the loss of power on August 14, 2003. The listed insureds in these cases, in many instances, are not customers of any FirstEnergy company. The sixth case involves the claim of a non-customer seeking reimbursement for losses incurred when its store was burglarized on August 14, 2003. FirstEnergy filed a Motion to Dismiss on June 13, 2006. It is currently expected that this case will be summarily dismissed, although the Motion is still pending. On March 7, 2006, the PUCO issued a ruling applicable to all pending cases. Among its various rulings, the PUCO consolidated all of the pending outage cases for hearing; limited the litigation to service-related claims by customers of the Ohio operating companies; dismissed FirstEnergy as a defendant; ruled that the U.S.-Canada Power System Outage Task Force Report was not admissible into evidence; and gave the plaintiffs additional time to amend their complaints to otherwise comply with the PUCO’s underlying order. Also, most complainants, along with the FirstEnergy companies, filed applications for rehearing with the PUCO over various rulings contained in the March 7, 2006 order. On April 26, 2006, the PUCO granted rehearing to allow the insurance company claimants, as insurers, to prosecute their claims in their name so long as they also identify the underlying insured entities and the Ohio utilities that provide their service. The PUCO denied all other motions for rehearing. The plaintiffs in each case have since filed an amended complaint and the named FirstEnergy companies have answered and also have filed a motion to dismiss each action. These motions are pending. Additionally, on June 23, 2006, one of the insurance carrier complainants filed an appeal with the Ohio Supreme Court over the PUCO’s denial of their motion for rehearing on the issue of the admissibility of the Task Force Report and the dismissal of FirstEnergy Corp. as a respondent. Briefing is expected to be completed on this appeal by mid-September. It is unknown when the Supreme Court will rule on the appeal. No estimate of potential liability is available for any of these cases.

In addition to the above proceedings, FirstEnergy was named in a complaint filed in Michigan State Court by an individual who is not a customer of any FirstEnergy company. FirstEnergy's motion to dismiss the matter was denied on June 2, 2006. FirstEnergy has since filed an appeal, which is pending. A responsive pleading to this matter has been filed. Also, the complaint has been amended to include an additional party. No estimate of potential liability has been undertaken in this matter.

FirstEnergy was also named, along with several other entities, in a complaint in New Jersey State Court. The allegations against FirstEnergy were based, in part, on an alleged failure to protect the citizens of Jersey City from an electrical power outage. None of FirstEnergy’s subsidiaries serve customers in Jersey City. A responsive pleading has been filed. On April 28, 2006, the Court granted FirstEnergy's motion to dismiss. The plaintiff has not appealed.

FirstEnergy is vigorously defending these actions, but cannot predict the outcome of any of these proceedings or whether any further regulatory proceedings or legal actions may be initiated against the Companies. Although unable to predict the impact of these proceedings, if FirstEnergy or its subsidiaries were ultimately determined to have legal liability in connection with these proceedings, it could have a material adverse effect on FirstEnergy's or its subsidiaries' financial condition, results of operations and cash flows.

Nuclear Plant Matters

On January 20, 2006, FENOC announced that it had entered into a deferred prosecution agreement with the U.S. Attorney’s Office for the Northern District of Ohio and the Environmental Crimes Section of the Environment and Natural Resources Division of the DOJ related to FENOC’s communications with the NRC during the fall of 2001 in connection with the reactor head issue at the Davis-Besse Nuclear Power Station. Under the agreement, which expires on December 31, 2006, the United States acknowledged FENOC’s extensive corrective actions at Davis-Besse, FENOC’s cooperation during investigations by the DOJ and the NRC, FENOC’s pledge of continued cooperation in any related criminal and administrative investigations and proceedings, FENOC’s acknowledgement of responsibility for the behavior of its employees, and its agreement to pay a monetary penalty. The DOJ will refrain from seeking an indictment or otherwise initiating criminal prosecution of FENOC for all conduct related to the statement of facts attached to the deferred prosecution agreement, as long as FENOC remains in compliance with the agreement, which FENOC fully intends to do. FENOC paid a monetary penalty of $28 million (not deductible for income tax purposes) which reduced First Energy's earnings by $0.09 per common share in the fourth quarter of 2005.

67



On April 21, 2005, the NRC issued a NOV and proposed a $5.45 million civil penalty related to the degradation of the Davis-Besse reactor vessel head issue discussed above. FirstEnergy accrued $2 million for a potential fine prior to 2005 and accrued the remaining liability for the proposed fine during the first quarter of 2005. On September 14, 2005, FENOC filed its response to the NOV with the NRC. FENOC accepted full responsibility for the past failure to properly implement its boric acid corrosion control and corrective action programs. The NRC NOV indicated that the violations do not represent current licensee performance. FirstEnergy paid the penalty in the third quarter of 2005. On January 23, 2006, FENOC supplemented its response to the NRC's NOV on the Davis-Besse head degradation to reflect the deferred prosecution agreement that FENOC had reached with the DOJ.

On August 12, 2004, the NRC notified FENOC that it would increase its regulatory oversight of the Perry Nuclear Power Plant as a result of problems with safety system equipment over the preceding two years and the licensee's failure to take prompt and corrective action. FENOC operates the Perry Nuclear Power Plant.

On April 4, 2005, the NRC held a public meeting to discuss FENOC’s performance at the Perry Nuclear Power Plant as identified in the NRC's annual assessment letter to FENOC. Similar public meetings are held with all nuclear power plant licensees following issuance by the NRC of their annual assessments. According to the NRC, overall the Perry Plant operated "in a manner that preserved public health and safety" even though it remained under heightened NRC oversight. During the public meeting and in the annual assessment, the NRC indicated that additional inspections will continue and that the plant must improve performance to be removed from the Multiple/Repetitive Degraded Cornerstone Column of the Action Matrix.

On September 28, 2005, the NRC sent a CAL to FENOC describing commitments that FENOC had made to improve the performance at the Perry Plant and stated that the CAL would remain open until substantial improvement was demonstrated. The CAL was anticipated as part of the NRC's Reactor Oversight Process. In the NRC's 2005 annual assessment letter dated March 2, 2006 and associated meetings to discuss the performance of Perry on March 14, 2006, the NRC again stated that the Perry Plant continued to operate in a manner that "preserved public health and safety." However, the NRC also stated that increased levels of regulatory oversight would continue until sustained improvement in the performance of the facility was realized. If performance does not improve, the NRC has a range of options under the Reactor Oversight Process, from increased oversight to possible impact to the plant’s operating authority. Although FirstEnergy is unable to predict the impact of the ultimate disposition of this matter, it could have a material adverse effect on FirstEnergy's or its subsidiaries' financial condition, results of operations and cash flows.

As of December 16, 2005, NGC acquired ownership of the nuclear generation assets transferred from OE, CEI, TE and Penn with the exception of leasehold interests of OE and TE in certain of the nuclear plants that are subject to sale and leaseback arrangements with non-affiliates.

Other Legal Matters

There are various lawsuits, claims (including claims for asbestos exposure) and proceedings related to FirstEnergy’s normal business operations pending against FirstEnergy and its subsidiaries. The other material items not otherwise discussed above are described below.

On October 20, 2004, FirstEnergy was notified by the SEC that the previously disclosed informal inquiry initiated by the SEC's Division of Enforcement in September 2003 relating to the restatements in August 2003 of previously reported results by FirstEnergy and the Ohio Companies, and the Davis-Besse extended outage, have become the subject of a formal order of investigation. The SEC's formal order of investigation also encompasses issues raised during the SEC's examination of FirstEnergy and the Companies under the now repealed PUHCA. Concurrent with this notification, FirstEnergy received a subpoena asking for background documents and documents related to the restatements and Davis-Besse issues. On December 30, 2004, FirstEnergy received a subpoena asking for documents relating to issues raised during the SEC's PUHCA examination. On August 24, 2005, additional information was requested regarding Davis-Besse related disclosures, which FirstEnergy has provided. FirstEnergy has cooperated fully with the informal inquiry and will continue to do so with the formal investigation.

On August 22, 2005, a class action complaint was filed against OE in Jefferson County, Ohio Common Pleas Court, seeking compensatory and punitive damages to be determined at trial based on claims of negligence and eight other tort counts alleging damages from W.H. Sammis Plant air emissions. The two named plaintiffs are also seeking injunctive relief to eliminate harmful emissions and repair property damage and the institution of a medical monitoring program for class members.


68


JCP&L's bargaining unit employees filed a grievance challenging JCP&L's 2002 call-out procedure that required bargaining unit employees to respond to emergency power outages. On May 20, 2004, an arbitration panel concluded that the call-out procedure violated the parties' collective bargaining agreement. At the conclusion of the June 1, 2005 hearing, the Arbitrator decided not to hear testimony on damages and closed the proceedings. On September 9, 2005, the Arbitrator issued an opinion to award approximately $16 million to the bargaining unit employees. On February 6, 2006, the federal court granted a Union motion to dismiss JCP&L's appeal of the award as premature. JCP&L will file its appeal again in federal district court once the damages associated with this case are identified at an individual employee level. JCP&L recognized a liability for the potential $16 million award in 2005.

The City of Huron filed a complaint against OE with the PUCO challenging the ability of electric distribution utilities to collect transition charges from a customer of a newly-formed municipal electric utility. The complaint was filed on May 28, 2003, and OE timely filed its response on June 30, 2003. In a related filing, the Ohio Companies filed for approval with the PUCO of a tariff that would specifically allow the collection of transition charges from customers of municipal electric utilities formed after 1998. Both filings were consolidated for hearing and decision described above. An adverse ruling could negatively affect full recovery of transition charges by the utility. Hearings on the matter were held in August 2005. Initial briefs from all parties were filed on September 22, 2005 and reply briefs were filed on October 14, 2005. On May 10, 2006, the PUCO issued its Opinion and Order dismissing the City’s complaint and approving the related tariffs, thus affirming OE’s entitlement to recovery of its transition charges. The City of Huron filed an application for rehearing of the PUCO’s decision on June 9, 2006 and OE filed a memorandum in opposition to that application on June 19, 2006. The PUCO denied the City’s application for rehearing on June 28, 2006. The City of Huron has 60 days from the denial of rehearing to appeal the PUCO’s decision.

If it were ultimately determined that FirstEnergy or its subsidiaries have legal liability or are otherwise made subject to liability based on the above matters, it could have a material adverse effect on FirstEnergy’s or its subsidiaries’ financial condition, results of operations and cash flows.

See Note 10(C) to the consolidated financial statements for further details and a complete discussion of these and other legal proceedings.

NEW ACCOUNTING STANDARDS AND INTERPRETATIONS

FSP FIN 46(R)-6 - “Determining the Variability to Be Considered in Applying FASB Interpretation No. 46(R)”

In April 2006, the FASB issued FSP FIN 46(R)-6 that addresses how a reporting enterprise should determine the variability to be considered in applying FASB Interpretation No. 46 (revised December 2003). FirstEnergy adopted FIN 46(R) in the first quarter of 2004, consolidating VIE’s when FirstEnergy or one of its subsidiaries is determined to be the VIE’s primary beneficiary. The variability that is considered in applying Interpretation 46(R) affects the determination of (a) whether the entity is a VIE; (b) which interests are variable interests in the entity; and (c) which party, if any, is the primary beneficiary of the VIE. This FSP states that the variability to be considered shall be based on an analysis of the design of the entity, involving two steps:

Step 1:
Analyze the nature of the risks in the entity
Step 2:
Determine the purpose(s) for which the entity was created and determine the variability the entity is designed to create and pass along to its interest holders.
 
 
 After determining the variability to consider, the reporting enterprise can determine which interests are designed to absorb that variability. The guidance in this FSP is applied prospectively to all entities (including newly created entities) with which that enterprise first becomes involved and to all entities previously required to be analyzed under Interpretation 46(R) when a reconsideration event has occurred after July 1, 2006. FirstEnergy does not expect this Statement to have a material impact on its financial statements.

FIN 48 - “Accounting for Uncertainty in Income Taxes - an interpretation of FASB Statement No. 109.”

In June 2006, the FASB issued FIN 48 which clarifies the accounting for uncertainty in income taxes recognized in an enterprise’s financial statements in accordance with FASB Statement No. 109, “Accounting for Income Taxes.” This interpretation prescribes a recognition threshold and measurement attribute for the financial statement recognition and measurement of a tax position taken or expected to be taken on a tax return. This interpretation also provides guidance on derecognition, classification, interest, penalties, accounting in interim periods, disclosure and transition. The evaluation of a tax position in accordance with this interpretation will be a two-step process. The first step will determine if it is more likely than not that a tax position will be sustained upon examination and should therefore be recognized. The second step will measure a tax position that meets the more likely than not recognition threshold to determine the amount of benefit to recognize in the financial statements. This interpretation is effective for fiscal years beginning after December 15, 2006. FirstEnergy is currently evaluating the impact of this Statement.

69



SUBSEQUENT EVENTS

Pennsylvania Law Change

On July 12, 2006, the Governor of Pennsylvania signed House Bill 859, which increases the net operating loss deduction allowed for the corporate net income tax from $2 million to $3 million, or the greater of 12.5% of taxable income. As a result, FirstEnergy expects to recognize a net operating loss benefit of $2.2 million (net of federal tax benefit) in the third quarter of 2006.

New Jersey Law Change

On July 8, 2006, the Governor of New Jersey signed tax legislation that increased the current New Jersey Corporate Business tax by an additional 4% surtax, which increases the effective tax from 9% to 9.36%. This increase applies to JCP&L’s 2006 through 2008 tax years and is not expected to have a material impact on FirstEnergy’s or JCP&L’s results of operations.

70




 
OHIO EDISON COMPANY
 
CONSOLIDATED STATEMENTS OF INCOME AND COMPREHENSIVE INCOME
 
(Unaudited)
 
           
   
Three Months Ended
 
Six Months Ended
 
   
June 30,
 
June 30,
 
   
2006 
 
2005 
 
2006 
 
2005 
 
STATEMENTS OF INCOME
 
(In thousands)
 
                       
REVENUES
 
$
573,092
 
$
716,612
 
$
1,159,295
 
$
1,442,970
 
                           
EXPENSES:
                         
Fuel
   
2,821
   
12,006
   
5,772
   
23,922
 
Purchased power
   
293,033
   
227,507
   
576,053
   
474,097
 
Nuclear operating costs
   
43,506
   
92,607
   
84,590
   
188,260
 
Other operating costs
   
91,604
   
95,589
   
182,414
   
178,768
 
Provision for depreciation
   
17,547
   
31,654
   
35,563
   
57,706
 
Amortization of regulatory assets
   
43,444
   
109,670
   
97,305
   
221,441
 
Deferral of new regulatory assets
   
(42,083
)
 
(39,026
)
 
(78,323
)
 
(63,821
)
General taxes
   
43,931
   
46,043
   
89,826
   
94,121
 
Total expenses
   
493,803
   
576,050
   
993,200
   
1,174,494
 
                           
OPERATING INCOME
   
79,289
   
140,562
   
166,095
   
268,476
 
                           
OTHER INCOME (EXPENSE):
                         
Investment income
   
32,818
   
22,482
   
65,860
   
43,089
 
Miscellaneous expense
   
(1,001
)
 
(2,161
)
 
(804
)
 
(23,897
)
Interest expense
   
(17,366
)
 
(21,402
)
 
(35,598
)
 
(39,605
)
Capitalized interest
   
643
   
3,006
   
1,134
   
5,241
 
Subsidiary's preferred stock dividend requirements
   
(155
)
 
(738
)
 
(311
)
 
(1,378
)
Total other income (expense)
   
14,939
   
1,187
   
30,281
   
(16,550
)
                           
INCOME TAXES
   
35,019
   
94,653
   
73,337
   
148,073
 
                           
NET INCOME
   
59,209
   
47,096
   
123,039
   
103,853
 
                           
PREFERRED STOCK DIVIDEND REQUIREMENTS AND
                         
REDEMPTION PREMIUM
   
3,587
   
658
   
4,246
   
1,317
 
                           
EARNINGS ON COMMON STOCK
 
$
55,622
 
$
46,438
 
$
118,793
 
$
102,536
 
                           
STATEMENTS OF COMPREHENSIVE INCOME
                         
                           
NET INCOME
 
$
59,209
 
$
47,096
 
$
123,039
 
$
103,853
 
                           
OTHER COMPREHENSIVE INCOME (LOSS):
                         
Unrealized gain (loss) on available for sale securities
   
(4,063
)
 
(12,960
)
 
1,672
   
(15,677
)
Income tax expense (benefit) related to other
                         
comprehensive income
   
(1,466
)
 
(4,546
)
 
603
   
(5,670
)
Other comprehensive income (loss), net of tax
   
(2,597
)
 
(8,414
)
 
1,069
   
(10,007
)
                           
TOTAL COMPREHENSIVE INCOME
 
$
56,612
 
$
38,682
 
$
124,108
 
$
93,846
 
                           
The preceding Notes to Consolidated Financial Statements as they relate to Ohio Edison Company are an integral part of these statements.
 

 
 
 

 
71

 

 

OHIO EDISON COMPANY
 
   
CONSOLIDATED BALANCE SHEETS
 
(Unaudited)
 
   
June 30,
 
         December 31,
 
   
2006
   
2005
 
   
 (In thousands)
 
ASSETS
             
CURRENT ASSETS:
             
Cash and cash equivalents
 
$
545,292
     
$
929
 
Receivables-
                 
Customers (less accumulated provisions of $8,627,000 and $7,619,000, respectively,
                 
for uncollectible accounts)
   
250,079
       
290,887
 
Associated companies
   
165,501
       
187,072
 
Other (less accumulated provisions of $52,000 and $4,000, respectively,
                 
for uncollectible accounts)
   
11,491
       
15,327
 
Notes receivable from associated companies
   
506,337
       
536,629
 
Prepayments and other
   
22,794
       
93,129
 
     
1,501,494
       
1,123,973
 
UTILITY PLANT:
                 
In service
   
2,558,212
       
2,526,851
 
Less - Accumulated provision for depreciation
   
996,261
       
984,463
 
     
1,561,951
       
1,542,388
 
Construction work in progress
   
63,277
       
58,785
 
     
1,625,228
       
1,601,173
 
OTHER PROPERTY AND INVESTMENTS:
                 
Long-term notes receivable from associated companies
   
1,676,228
       
1,758,776
 
Investment in lease obligation bonds
   
310,285
       
325,729
 
Nuclear plant decommissioning trusts
   
106,360
       
103,854
 
Other
   
40,968
       
44,210
 
     
2,133,841
       
2,232,569
 
DEFERRED CHARGES AND OTHER ASSETS:
                 
Regulatory assets
   
756,481
       
774,983
 
Prepaid pension costs
   
227,815
       
224,813
 
Property taxes
   
52,897
       
52,875
 
Unamortized sale and leaseback costs
   
52,637
       
55,139
 
Other
   
26,988
       
31,752
 
     
1,116,818
       
1,139,562
 
   
$
6,377,381
     
$
6,097,277
 
LIABILITIES AND CAPITALIZATION
                 
CURRENT LIABILITIES:
                 
Currently payable long-term debt
 
$
225,625
     
$
280,255
 
Short-term borrowings-
                 
Associated companies
   
2,161
       
57,715
 
Other
   
22,431
       
143,585
 
Accounts payable-
                 
Associated companies
   
123,912
       
172,511
 
Other
   
12,312
       
9,607
 
Accrued taxes
   
173,248
       
163,870
 
Accrued interest
   
7,150
       
8,333
 
Other
   
64,098
       
61,726
 
     
630,937
       
897,602
 
CAPITALIZATION:
                 
Common stockholder's equity-
                 
Common stock, without par value, authorized 175,000,000 shares - 100 shares outstanding
   
2,296,525
       
2,297,253
 
Accumulated other comprehensive income
   
5,163
       
4,094
 
Retained earnings
   
285,434
       
200,844
 
Total common stockholder's equity
   
2,587,122
       
2,502,191
 
Preferred stock not subject to mandatory redemption
   
60,965
       
60,965
 
Preferred stock of consolidated subsidiary not subject to mandatory redemption
   
14,105
       
14,105
 
Long-term debt and other long-term obligations
   
1,521,863
       
1,019,642
 
     
4,184,055
       
3,596,903
 
NONCURRENT LIABILITIES:
                 
Accumulated deferred income taxes
   
747,568
       
769,031
 
Accumulated deferred investment tax credits
   
22,307
       
24,081
 
Asset retirement obligation
   
85,578
       
82,527
 
Retirement benefits
   
294,755
       
291,051
 
Deferred revenues - electric service programs
   
104,855
       
121,693
 
Other
   
307,326
       
314,389
 
     
1,562,389
       
1,602,772
 
COMMITMENTS AND CONTINGENCIES (Note 10)
                 
   
$
6,377,381
     
$
6,097,277
 
                   
The preceding Notes to Consolidated Financial Statements as they relate to Ohio Edison Company are an integral part of these balance sheets.
 
 
72

 

OHIO EDISON COMPANY
 
   
CONSOLIDATED STATEMENTS OF CASH FLOWS
 
(Unaudited)
 
             
   
 Six Months Ended
 
   
 June 30,
 
   
 2006
 
 2005
 
   
(In thousands)
 
             
CASH FLOWS FROM OPERATING ACTIVITIES:
           
Net income
 
$
123,039
 
$
103,853
 
Adjustments to reconcile net income to net cash from operating activities -
             
Provision for depreciation
   
35,563
   
57,706
 
Amortization of regulatory assets
   
97,305
   
221,441
 
Deferral of new regulatory assets
   
(78,323
)
 
(63,821
)
Nuclear fuel and lease amortization
   
(11,337
)
 
18,663
 
Amortization of lease costs
   
(4,334
)
 
(2,952
)
Deferred income taxes and investment tax credits, net
   
(17,351
)
 
(5,142
)
Accrued compensation and retirement benefits
   
930
   
3,504
 
Decrease (increase) in operating assets -
             
Receivables
   
66,215
   
77,745
 
Materials and supplies
   
-
   
(18,149
)
Prepayments and other current assets
   
70,335
   
(7,220
)
Increase (decrease) in operating liabilities -
             
Accounts payable
   
(45,894
)
 
(85,227
)
Accrued taxes
   
9,378
   
19,078
 
Accrued interest
   
(1,183
)
 
(791
)
Electric service prepayment programs
   
(16,838
)
 
132,151
 
Other
   
(8,772
)
 
12,876
 
Net cash provided from operating activities
   
218,733
   
463,715
 
               
CASH FLOWS FROM FINANCING ACTIVITIES:
             
New Financing -
             
Long-term debt
   
599,778
   
146,450
 
Short-term borrowings, net
   
-
   
47,442
 
Redemptions and Repayments -
             
Preferred stock
   
-
   
(37,750
)
Long-term debt
   
(146,893
)
 
(260,508
)
Short-term borrowings, net
   
(176,708
)
 
-
 
Dividend Payments -
             
Common stock
   
(35,000
)
 
(177,000
)
Preferred stock
   
(1,317
)
 
(1,317
)
Net cash provided from (used for) financing activities
   
239,860
   
(282,683
)
               
CASH FLOWS FROM INVESTING ACTIVITIES:
             
Property additions
   
(49,659
)
 
(121,458
)
Proceeds from nuclear decommissioning trust fund sales
   
30,269
   
122,374
 
Investments in nuclear decommissioning trust funds
   
(30,961
)
 
(138,144
)
Loan repayments from (loans to) associated companies, net
   
112,840
   
(58,540
)
Other
   
23,281
   
14,789
 
Net cash provided from (used for) investing activities
   
85,770
   
(180,979
)
               
Net increase in cash and cash equivalents
   
544,363
   
53
 
Cash and cash equivalents at beginning of period
   
929
   
1,230
 
Cash and cash equivalents at end of period
 
$
545,292
 
$
1,283
 
 
             
The preceding Notes to Consolidated Financial Statements as they relate to Ohio Edison Company are an integral part of these statements.


 
73




Report of Independent Registered Public Accounting Firm









To the Stockholder and Board of
Directors of Ohio Edison Company:

We have reviewed the accompanying consolidated balance sheet of Ohio Edison Company and its subsidiaries as of June 30, 2006, and the related consolidated statements of income and comprehensive income for each of the three-month and six-month periods ended June 30, 2006 and 2005 and the consolidated statement of cash flows for the six-month period ended June 30, 2006 and 2005. These interim financial statements are the responsibility of the Company’s management.

We conducted our review in accordance with the standards of the Public Company Accounting Oversight Board (United States). A review of interim financial information consists principally of applying analytical procedures and making inquiries of persons responsible for financial and accounting matters. It is substantially less in scope than an audit conducted in accordance with the standards of the Public Company Accounting Oversight Board, the objective of which is the expression of an opinion regarding the financial statements taken as a whole. Accordingly, we do not express such an opinion.

Based on our review, we are not aware of any material modifications that should be made to the accompanying consolidated interim financial statements for them to be in conformity with accounting principles generally accepted in the United States of America.

We have previously audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated balance sheet as of December 31, 2005, and the related consolidated statements of income, capitalization, common stockholder’s equity, preferred stock, cash flows and taxes for the year then ended (not presented herein), and in our report [which contained references to the Company’s change in its method of accounting for asset retirement obligations as of January 1, 2003 and conditional asset retirement obligations as of December 31, 2005 as discussed in Note 2(G) and Note 11 to those consolidated financial statements] dated February 27, 2006, we expressed an unqualified opinion on those consolidated financial statements. In our opinion, the information set forth in the accompanying consolidated balance sheet as of December 31, 2005, is fairly stated in all material respects in relation to the consolidated balance sheet from which it has been derived.




PricewaterhouseCoopers LLP
Cleveland, Ohio
August 4, 2006



74


OHIO EDISON COMPANY

MANAGEMENT’S DISCUSSION AND ANALYSIS OF
RESULTS OF OPERATIONS AND FINANCIAL CONDITION


OE is a wholly owned electric utility subsidiary of FirstEnergy. OE and its wholly owned subsidiary, Penn, conduct business in portions of Ohio and Pennsylvania, providing regulated electric distribution services. Penn’s rate restructuring plan and its associated transition charge revenue recovery was completed in 2005. The OE Companies also provide generation services to those customers electing to retain the OE Companies as their power supplier. Power supply requirements of the OE Companies are provided by FES - an affiliated company.

FirstEnergy Intra-System Generation Asset Transfers
 
                    In 2005, the Ohio Companies and Penn entered into certain agreements implementing a series of intra-system generation asset transfers that were completed in the fourth quarter of 2005. The asset transfers resulted in the respective undivided ownership interests of the Ohio Companies and Penn in FirstEnergy’s nuclear and non-nuclear generation assets being owned by NGC and FGCO, respectively. The generating plant interests transferred did not include OE's leasehold interests in certain of the plants that are currently subject to sale and leaseback arrangements with non-affiliates.
 
                    On October 24, 2005, the OE Companies completed the intra-system transfer of non-nuclear generation assets to FGCO. Prior to the transfer, FGCO, as lessee under a Master Facility Lease with the Ohio Companies and Penn, leased, operated and maintained the non-nuclear generation assets that it now owns. The asset transfers were consummated pursuant to FGCO's purchase option under the Master Facility Lease.
 
                    On December 16, 2005, the OE Companies completed the intra-system transfer of their ownership interests in the nuclear generation assets to NGC through an asset spin-off in the form of a dividend. FENOC continues to operate and maintain the nuclear generation assets.
 
                   These transactions were undertaken pursuant to the Ohio Companies’ and Penn’s restructuring plans that were approved by the PUCO and the PPUC, respectively, under applicable Ohio and Pennsylvania electric utility restructuring legislation. Consistent with the restructuring plans, generation assets that had been owned by the Ohio Companies and Penn were required to be separated from the regulated delivery business of those companies through transfer to a separate corporate entity. The transactions essentially completed the divestitures contemplated by the restructuring plans by transferring the ownership interests to NGC and FGCO without impacting the operation of the plants.
 
                    The transfers affect the OE Companies' comparative earnings results with reductions in both revenues and expenses. Revenues are reduced due to the termination of certain arrangements with FES, under which the OE Companies previously sold their nuclear-generated KWH to FES and leased their non-nuclear generation assets to FGCO, a subsidiary of FES. Their expenses are lower due to the nuclear fuel and operating costs assumed by NGC as well as depreciation and property tax expenses assumed by FGCO and NGC related to the transferred generating assets. With respect to OE's retained leasehold interests in the Perry Plant and Beaver Valley Unit 2, OE has continued the nuclear-generated KWH sales arrangement with FES for the associated output and continues to be obligated on the applicable portion of expenses related to those interests. In addition, the OE Companies receive interest income on associated company notes receivable from the transfer of their generation net assets. FES will continue to provide OE’s PLR requirements under revised purchased power arrangements for the three-year period beginning January 1, 2006 and Penn’s during 2006 (see Outlook - Regulatory Matters).




75

 
                   The effects on the OE Companies' results of operations in the second quarter and first six months of 2006 as compared to the same periods of 2005 from the generation asset transfers (also reflecting OE's retained leasehold interests discussed above) are summarized in the following table:
 

Intra-System Generation Asset Transfers
 
Income Statement Effects
   
Three Months
 
Six Months
 
Increase (Decrease)
   
(In millions)
 
Revenues:
            
Non-nuclear generating units rent
 
(a
)
$
(44
)
$
(89
)
Nuclear generated KWH sales
 
(b
)
 
(67
)
 
(131
)
Total - Revenues Effect
 
 
   
(111
)
 
(220
)
Expenses:
 
 
             
Fuel costs - nuclear
 
(c
)
 
(9
)
 
(18
)
Nuclear operating costs
 
(c
)
 
(43
)
 
(89
)
Provision for depreciation
 
(d
)
 
(17
)
 
(28
)
General taxes
 
(e
)
 
(3
)
 
(6
)
Total - Expenses Effect
 
 
   
(72
)
 
(141
)
Operating Income Effect
 
 
   
(39
)
 
(79
)
Other Income:
 
 
             
Interest income from notes receivable
 
(f
)
 
14
   
30
 
Nuclear decommissioning trust earnings
 
(g
)
 
(4
)
 
(6
)
Capitalized Interest
 
(h
)
 
(2
)
 
(4
)
Total - Other Income Effect
 
 
   
8.
   
20.
 
Income taxes
 
(i
)
 
(13
)
 
(24
)
Net Income Effect
 
 
 
$
(18
)
$
(35
)
                   
(a) Elimination of non-nuclear generation assets lease to FGCO.
(b) Reduction of nuclear generated wholesale KWH sales to FES.
(c) Reduction of nuclear fuel and operating costs.
(d) Reduction of depreciation expense and asset retirement obligation accretion related to generation assets.
(e) Reduction of property tax expense on generation assets.
(f) Interest income on associated company notes receivable from the transfer of generation net assets.
(g) Reduction of earnings on nuclear decommissioning trusts.
(h) Reduction of allowance for borrowed funds used during construction on nuclear capital expenditures.
(i) Income tax effect of the above adjustments.
 
Results of Operations

Earnings on common stock in the second quarter of 2006 increased to $56 million from $46 million in the second quarter of 2005. In the first six months of 2006, earnings on common stock increased to $119 million from $103 million in the same period of 2005. The increase in earnings in both periods of 2006 primarily resulted from lower expenses and increased other income, partially offset by lower revenues principally from the asset transfer effects shown in the table above. Earnings in both periods of 2005 were also reduced by a one-time income tax charge of $36 million from the enactment of tax legislation in Ohio. Earnings in the first six months of 2005 was additionally reduced by charges relating to a $8.5 million civil penalty payable to the Department of Justice and $10 million for environmental projects in connection with the Sammis Plant settlement (see Outlook — Environmental Matters).

Revenues

Revenues decreased by $144 million or 20.0% in the second quarter of 2006 compared with the same period in 2005, primarily due to the generation asset transfer impact summarized in the table above. Excluding the effects of the asset transfer, revenues in the second quarter of 2006 decreased $33 million, primarily due to decreases of $70 million and $112 million in wholesale sales and distribution revenues, respectively, partially offset by increases in retail generation revenues of $125 million and reduced customer shopping incentives of $21 million.

In the first six months of 2006 compared with the same period in 2005, revenues decreased by $284 million or 19.7%, primarily from the generation asset transfer impact summarized in the table above. Excluding the effects of the asset transfer, revenues in the first six months of 2006 decreased $64 million, primarily due to decreases of $130 million and $210 million in wholesale sales and distribution revenues, respectively, partially offset by increases in retail generation revenues of $232 million and reduced customer shopping incentives of $38 million.

76



The lower wholesale revenues in both periods of 2006 reflect the termination of a non-affiliated wholesale sales agreement and the cessation of the MSG sales arrangements under OE’s transition plan in December 2005. OE had been required to provide the MSG to non-affiliated alternative suppliers.

Changes in electric generation KWH sales and revenues in the second quarter and first six months of 2006 from the corresponding periods of 2005 are summarized in the following table.

Changes in Generation KWH Sales
 
Three Months
 
Six Months
 
Increase (Decrease)
 
 
 
 
 
Electric Generation:
 
 
 
 
 
Retail
 
 
13.8 
%
 
12.5 
%
Wholesale
 
 
(84.2)
%
 
(82.8)
%
Net Decrease in Generation Sales
 
 
(31.4)
%
 
(29.7)
%
 

 
Changes in Generation Revenues
 
Three Months
 
Six Months
Increase (Decrease)
 
(In millions)
Retail Generation:
             
Residential
 
$
41
 
$
84
 
Commercial
 
 
38
 
 
70
 
Industrial
 
 
46
 
 
78
 
Total Retail Generation
   
125
   
232
 
Wholesale*
   
(70
)
 
(130
)
Net Increase in Generation Revenues
 
$
55
 
$
102
 
               
* Excludes impact of generation asset transfers related to nuclear generated KWH sales.
 
 
      Increased retail generation revenues for the second quarter of 2006 as shown in the table above resulted from higher KWH sales and higher unit prices. The increase in generation KWH sales primarily resulted from decreased customer shopping, as the percentage of generation services provided by alternative suppliers to total sales delivered in OE's service area decreased by: residential - 10.4 percentage points; commercial - 12.5 percentage points; and industrial - 11.2 percentage points. The decrease in shopping resulted from certain alternative energy suppliers terminating their supply arrangements with OE’s shopping customers in the fourth quarter of 2005. Higher unit prices for generation reflected the rate stabilization charge and the fuel recovery rider that both became effective in the first quarter of 2006 under provisions of the RSP and RCP.

Retail generation revenues increased in the first six months of 2006 compared to the same period of 2005 for the reasons described above. The increase in generation KWH sales primarily resulted from a decrease in customer shopping, as the percentage of generation services provided by alternative suppliers to total sales delivered in OE's service area decreased by: residential - 9.5 percentage points; commercial - 11.8 percentage points; and industrial - 10.2 percentage points. Higher unit prices for generation reflected the impact of the RSP and RCP described above.

Changes in distribution KWH deliveries and revenues in the second quarter and first six months of 2006 from the corresponding periods of 2005 are summarized in the following table.
 


Changes in Distribution KWH Deliveries
Three Months
 
Six Months
Increase (Decrease)
 
 
 
Distribution Deliveries:
 
 
 
 
 
Residential
(6.3)
%
 
(3.8)
%
Commercial
(2.2)
%
 
(1.6)
%
Industrial
2.7 
%
 
0.5 
%
Net Decrease in Distribution Deliveries
(1.7)
%
 
(1.6)
%
 


 
Changes in Distribution Revenues
 
Three Months
 
Six Months
Increase (Decrease)
 
(In millions)
Residential
 
$
(48
)
$
(88
)
Commercial
 
 
(34
)
 
(65
)
Industrial
 
 
(30
)
 
(57
)
Net Decrease in Distribution Revenues
 
$
(112
)
$
(210
)

77



Lower distribution throughput revenues as shown in the table above in the second quarter and first six months of 2006 reflects lower composite prices and reduced KWH deliveries. The lower unit prices in both periods were due to the completion of the generation-related transition cost recovery under the OE Companies’ respective rate restructuring plans in 2005, partially offset by increased transmission rates to recover MISO costs beginning in 2006 (see Outlook - Regulatory Matters). Lower distribution KWH deliveries to residential and commercial customers reflected the impact of milder weather conditions in the second quarter and first six months of 2006, compared to the same periods of 2005. KWH deliveries to industrial customers increased slightly in both periods due to the recovering steel industry in the OE Companies’ service territory.

Under the Ohio transition plan, OE had provided incentives to customers to encourage switching to alternative energy providers, which reduced OE’s revenues by $21 million in the second quarter of 2005 and $38 million in the first six months of 2005. These revenue reductions, which were deferred for future recovery and did not affect earnings, ceased in 2006. The deferred shopping incentives (Extended RTC) are now being recovered under the RCP (see Outlook - Regulatory Matters).

Expenses

Total expenses decreased by $82 million in the second quarter of 2006 and $181 million in the first six months of 2006 from the same periods of 2005 principally due to the effects of the generation asset transfer shown in the table above. Excluding the asset transfer effects, the following table presents changes from the prior year by expense category.


Expenses - Changes
 
Three Months
 
Six Months
Increase (Decrease)
 
(In millions)
Purchased power costs
 
$
66
 
$
102
 
Nuclear operating costs
 
 
(6
)
 
(14
)
Other operating costs
 
 
(4
)
 
4
 
Provision for depreciation
   
2
   
6
 
Amortization of regulatory assets
   
(66
)
 
(124
)
Deferral of new regulatory assets
   
(3
)
 
(15
)
General taxes
 
 
1
 
 
2
 
Net decrease in expenses
 
$
(10
)
$
(39
)
 
 
 
 
 
 
 
 

Increased purchased power costs in the second quarter and first six months of 2006 reflected higher unit prices associated with the new power supply agreement with FES, partially offset by a decrease in KWH purchased to meet the lower net generation sales requirements. Excluding the effects of the generation asset transfers, the lower nuclear operating costs for OE’s nuclear leasehold interests were primarily due to the absence in 2006 of the Beaver Valley Unit 2 refueling outage and Perry Nuclear Power Plant scheduled refueling outage (including an unplanned extension) that was completed on May 6, 2005. The decrease in other operating costs during the second quarter of 2006 was primarily due to lower associated company (FES) transmission expenses as a result of alternative energy suppliers terminating their supply arrangements with OE’s shopping customer in the fourth quarter of 2005. The increase in other operating costs in the first six months of 2006 was primarily due to increased transmission expenses related to MISO Day 2 operations that began on April 1, 2005.

Excluding the effects of the generation asset transfers, higher depreciation expense in the second quarter and first six months of 2006 reflected capital additions subsequent to the second quarter of 2005. Lower amortization of regulatory assets in both periods was due to the completion of the generation-related transition cost amortization under the OE Companies' respective transition plans, partially offset by the amortization of deferred MISO costs being recovered in 2006. The higher deferrals of new regulatory assets in the second quarter and first six months of 2006 primarily resulted from the deferral of fuel ($14 million and $25 million, respectively) and distribution costs ($22 million and $39 million, respectively) under the RCP, partially offset by lower MISO cost deferrals ($12 million and $11 million, respectively) and the decrease in shopping incentive deferrals ($21 million and $38 million, respectively) which ceased in 2006 under the Ohio transition plan. The deferral of interest on the unamortized shopping incentive balances continues under the RCP.

Excluding the effects of the generation asset transfers, higher general taxes in both periods reflects the phase-in of the Ohio commercial activity tax that became effective July 1, 2005.

78



Other Income

Other income increased $14 million in the second quarter of 2006 and $47 million in the first six months of 2006 as compared with the same periods of 2005, primarily due to the effects of the generation asset transfers. Excluding the effects of the generation asset transfers, the $5 million increase in the second quarter is primarily due to lower interest expense, reflecting debt redemptions subsequent to the second quarter of 2005.

Excluding the effects of the generation asset transfers, the $28 million increase in the first six months is primarily due to lower interest expense and the absence in 2006 of the 2005 charges of $8.5 million for a civil penalty payable to the DOJ and $10 million for environmental projects in connection with the Sammis New Source Review settlement (see Outlook - Environmental Matters).

Income Taxes

Income taxes decreased $60 million in the second quarter of 2006 and $75 million in the first six months of 2006 compared with the same periods of 2005. Excluding the effects of the generation asset transfer, income taxes decreased $47 million in the second quarter of 2006 and $50 million in the first six months of 2006. As a result of new Ohio tax legislation in 2005, OE wrote off $36 million in net deferred tax benefits in the second quarter of 2005. The remainder of the net change in both the second quarter and the six-month period was mainly due to an increase in taxable income, partially offset by a reduction in the tax rates due to the continuing phase-out of the income-based Ohio franchise tax.

Capital Resources and Liquidity

OE’s cash requirements in 2006 for operating expenses, construction expenditures and scheduled debt maturities are expected to be met with cash from operations, short-term credit arrangements and funds from capital markets. OE repurchased $500 million of common stock from FirstEnergy and redeemed $64 million of preferred stock in July 2006 with proceeds of senior notes issued in June 2006. Available borrowing capacity under credit facilities will be used to manage working capital requirements.

Changes in Cash Position

OE had $545 million of cash and cash equivalents as of June 30, 2006 compared with $1 million as of December 31, 2005. The major sources for changes in these balances are summarized below.

Cash Flows From Operating Activities

Cash provided from operating activities during the first six months of 2006, compared with the corresponding period in 2005, was as follows:

 
 
Six Months Ended
 
 
 
June 30,
 
 Operating Cash Flows
 
2006
 
2005
 
     
(In millions)
 
Cash earnings (1)
 
$
129
 
$
329
 
Working capital and other
 
 
90
 
 
135
 
Net cash provided from operating activities
 
$
219
 
$
464
 
 
 
 
 
 
 
 
 
(1) Cash earnings are a non-GAAP measure (see reconciliation below).

79



Cash earnings (in the table above) are not a measure of performance calculated in accordance with GAAP. OE believes that cash earnings are a useful financial measure because it provides investors and management with an additional means of evaluating its cash-based operating performance. The following table reconciles cash earnings with net income:

   
Six Months Ended
 
 
 
June 30,
 
Reconciliation of Cash Earnings
 
2006
 
2005
 
     
(In millions)
 
Net income (GAAP)
 
$
123
 
$
104
 
Non-cash charges (credits):
 
 
   
 
 
 
Provision for depreciation
 
 
36
 
 
58
 
Amortization of regulatory assets
 
 
97
 
 
221
 
Deferral of new regulatory assets
 
 
(78
)
 
(64
)
Nuclear fuel and capital lease amortization
 
 
(11
)
 
19
 
Amortization of electric service obligation
   
(17
)
 
(4
)
Amortization of lease costs
   
(4
)
 
(3
)
Deferred income taxes and investment tax credits, net
 
 
(17
)
 
(5
)
Accrued compensation and retirement benefits
 
 
--
 
 
3
 
Cash earnings (Non-GAAP)
 
$
129
 
$
329
 
 
 
 
 
 
 
 
 

Net cash provided from operating activities decreased $245 million in the first six months of 2006, compared with the same period in 2005, due to a $45 million decrease from changes in working capital and a $200 million decrease in cash earnings as described above under “Results from Operations.” The decrease in working capital primarily reflects the absence in 2006 of $136 million in funds received for the Energy for Education program in 2005, partially offset by changes in prepayments and other current assets of $78 million and accounts payable of $39 million.

Cash Flows From Financing Activities

Net cash provided from financing activities increased to $240 million in the first six months of 2006 from $283 million used for financing activities in the first six months of 2005. The increase primarily reflected more long-term debt financing, and decreases of $151 million in redemptions of preferred stock and long-term debt and $142 million in common stock dividend payments to FirstEnergy, partially offset by higher repayments of short-term borrowings to associated companies.

OE had approximately $1.1 billion of cash and temporary cash investments (which include short-term notes receivable from associated companies) and $25 million of short-term indebtedness as of June 30, 2006. OE has authorization from the PUCO to incur short-term debt of up to $500 million, which is available through the bank facility and the utility money pool described below. Penn has authorization from the SEC, continued by FERC rules adopted as a result of EPACT's repeal of PUHCA, to incur short-term debt up to its charter limit of $44 million as of June 30, 2006, and also has access to the bank facility and the utility money pool.

OES Capital is a wholly owned subsidiary of OE whose borrowings are secured by customer accounts receivable purchased from OE. OES Capital can borrow up to $170 million under a receivables financing arrangement. As a separate legal entity with separate creditors, OES Capital would have to satisfy its obligations to creditors before any of its remaining assets could be made available to OE. As of June 30, 2006, the facility was not drawn.

Penn Power Funding LLC (Penn Funding), a wholly owned subsidiary of Penn, is a limited liability company whose borrowings are secured by customer accounts receivable purchased from Penn. Penn Funding can borrow up to $25 million under a receivables financing arrangement which expires July 28, 2007. As a separate legal entity with separate creditors, Penn Funding would have to satisfy its obligations to creditors before any of its remaining assets could be made available to Penn. As of June 30, 2006, the facility was drawn for $19 million.

As of June 30, 2006, OE and Penn had the aggregate capability to issue approximately $592 million of additional FMB on the basis of property additions and retired bonds under the terms of their respective mortgage indentures. The issuance of FMB by OE is also subject to provisions of its senior note indenture generally limiting the incurrence of additional secured debt, subject to certain exceptions that would permit, among other things, the issuance of secured debt (including FMB) (i) supporting pollution control notes or similar obligations, or (ii) as an extension, renewal or replacement of previously outstanding secured debt. In addition, OE is permitted under the indenture to incur additional secured debt not otherwise permitted by a specified exception of up to $735 million as of June 30, 2006. Based upon applicable earnings coverage tests in their respective charters, OE and Penn could issue a total of $2.7 billion of preferred stock (assuming no additional debt was issued) as of June 30, 2006. As a result of OE redeeming all of its outstanding preferred stock on July 7, 2006, the applicable earnings coverage test is inoperable for OE. In the event that OE issues preferred stock in the future, the applicable earnings coverage test will govern the amount of additional preferred stock that OE may issue. 

80



As of June 30, 2006, OE had approximately $400 million of capacity remaining unused under its existing shelf registration.

FirstEnergy, OE, Penn, CEI, TE, JCP&L, Met-Ed, Penelec, FES and ATSI, as Borrowers, have entered into a syndicated $2 billion five-year revolving credit facility with a syndicate of banks that expires in June 2010. Borrowings under the facility are available to each Borrower separately and mature on the earlier of 364 days from the date of borrowing or the commitment termination date, as the same may be extended. OE's borrowing limit under the facility is $500 million and Penn’s is $50 million, subject in each case to applicable regulatory approvals.

Under the revolving credit facility, borrowers may request the issuance of LOCs expiring up to one year from the date of issuance. The stated amount of outstanding LOCs will count against total commitments available under the facility and against the applicable borrower’s borrowing sub-limit. Total unused borrowing capability under existing credit facilities and accounts receivable financing facilities totaled $726 million as of June 30, 2006.

The revolving credit facility contains financial covenants requiring each borrower to maintain a consolidated debt to total capitalization ratio of no more than 65%. As of June 30, 2006, debt to total capitalization as defined under the revolving credit facility was 40% for OE and 34% for Penn.

The facility does not contain any provisions that either restricts the ability of OE and Penn to borrow or accelerate repayment of outstanding advances as a result of any change in credit ratings. Pricing is defined in “pricing grids”, whereby the cost of funds borrowed under the facility is related to OE’s and Penn’s credit ratings.

   OE and Penn have the ability to borrow from their regulated affiliates and FirstEnergy to meet their short-term working capital requirements. FESC administers this money pool and tracks surplus funds of FirstEnergy and its regulated subsidiaries. Companies receiving a loan under the money pool agreements must repay the principal amount, together with accrued interest, within 364 days of borrowing the funds. The rate of interest is the same for each company receiving a loan from the pool and is based on the average cost of funds available through the pool. The average interest rate for borrowings in the first six months of 2006 was 4.86%.
 
                   OE’s access to the capital markets and the costs of financing are influenced by the ratings of its securities. The ratings outlook from S&P on all securities is stable. The ratings outlook from Moody's and Fitch on all securities is positive.
 
                   On April 3, 2006, pollution control notes that were formerly obligations of OE and Penn were refinanced and became obligations of FGCO and NGC. The proceeds from the refinancings were used to repay a portion of their associated company notes payable to Penn and OE. With those repayments, OE redeemed $74.8 million and Penn redeemed $6.95 million of pollution control notes having variable interest rates.

Cash Flows From Investing Activities

Net cash provided from investing activities was $86 million in the first six months of 2006 compared to $181 million used for investing activities in the first six months of 2005. The change resulted primarily from a $171 million increase in loan repayments from associated companies and a $72 million decrease in property additions, which reflects the impact of the generation asset transfers.

During the second half of 2006, capital requirements for property additions and capital leases are expected to be approximately $46 million. OE has additional requirements of approximately $2 million to meet requirements for maturing long-term debt during the remainder of 2006. These cash requirements are expected to be satisfied from a combination of internal cash and short-term credit arrangements. OE’s capital spending for the period 2006-2010 is expected to be approximately $624 million, of which approximately $108 million applies to 2006.

Off-Balance Sheet Arrangements

Obligations not included on OE’s Consolidated Balance Sheets primarily consist of sale and leaseback arrangements involving Perry Unit 1 and Beaver Valley Unit 2. The present value of these operating lease commitments, net of trust investments, was $640 million as of June 30, 2006.

81



Equity Price Risk

Included in OE’s nuclear decommissioning trust investments are marketable equity securities carried at their market value of approximately $70 million and $67 million as of June 30, 2006 and December 31, 2005, respectively. A hypothetical 10% decrease in prices quoted by stock exchanges would result in a $7 million reduction in fair value as of June 30, 2006. Changes in the fair value of these investments are recorded in OCI unless recognized as a result of a sale or recognized as regulatory assets or liabilities.

Outlook

   The electric industry continues to transition to a more competitive environment and all of the OE Companies’ customers can select alternative energy suppliers. The OE Companies continue to deliver power to residential homes and businesses through their existing distribution system, which remains regulated. Customer rates have been restructured into separate components to support customer choice. In Ohio and Pennsylvania, the OE Companies have a continuing responsibility to provide power to those customers not choosing to receive power from an alternative energy supplier subject to certain limits.

Regulatory Matters

   Regulatory assets and liabilities are costs which have been authorized by the PUCO, the PPUC and the FERC for recovery from or credit to customers in future periods or for which authorization is probable. Without the probability of such authorization, costs currently recorded as regulatory assets and liabilities would have been charged to income as incurred. All regulatory assets are expected to be recovered under the provisions of the OE Companies’ transition plans and rate restructuring plans. OE‘s regulatory assets were $756 million and $775 million as of June 30, 2006 and December 31, 2005, respectively. Penn had net regulatory liabilities of $59 million as of June 30, 2006 and December 31, 2005, which are included in Other Noncurrent Liabilities on the Consolidated Balance Sheets as of June 30, 2006 and December 31, 2005.

On October 21, 2003 the Ohio Companies filed their RSP case with the PUCO. On August 5, 2004, the Ohio Companies accepted the RSP as modified and approved by the PUCO in an August 4, 2004 Entry on Rehearing, subject to a CBP. The RSP was intended to establish generation service rates beginning January 1, 2006, in response to the PUCO’s concerns about price and supply uncertainty following the end of the Ohio Companies' transition plan market development period. In October 2004, the OCC and NOAC filed appeals with the Supreme Court of Ohio to overturn the original June 9, 2004 PUCO order in the proceeding as well as the associated entries on rehearing. On September 28, 2005, the Supreme Court of Ohio heard oral arguments on the appeals. On May 3, 2006, the Supreme Court of Ohio issued an opinion affirming the PUCO's order with respect to the approval of the rate stabilization charge, approval of the shopping credits, the granting of interest on shopping credit incentive deferral amounts, and approval of the Ohio Companies’ financial separation plan. It remanded one matter back to the PUCO for further consideration of the issue as to whether the RSP, as adopted by the PUCO, provided for sufficient means for customer participation in the competitive marketplace. On May 12, 2006, the Ohio Companies filed a Motion for Reconsideration with the Supreme Court of Ohio which was denied by the Court on June 21, 2006. The RSP contained a provision that permitted the Ohio Companies to withdraw and terminate the RSP in the event that the PUCO, or the Supreme Court of Ohio, rejected all or part of the RSP. In such event, the Ohio Companies have 30 days from the final order or decision to provide notice of termination. On July 20, 2006 the Ohio Companies filed with the PUCO a Request to Initiate a Proceeding on Remand. In their Request, the Ohio Companies provided notice of termination to those provisions of the RSP subject to termination, subject to being withdrawn, and also set forth a framework for addressing the Supreme Court of Ohio’s findings on customer participation, requesting the PUCO to initiate a proceeding to consider the Ohio Companies’ proposal. If the PUCO approves a resolution to the issues raised by the Supreme Court of Ohio that is acceptable to the Ohio Companies, the Ohio Companies’ termination will be withdrawn and considered to be null and void. Separately, the OCC and NOAC also submitted to the PUCO on July 20, 2006 a conceptual proposal dealing with the issue raised by the Supreme Court of Ohio. On July 26, 2006, the PUCO issued an Entry acknowledging the July 20, 2006 filings of the Ohio Companies and the OCC and NOAC, and giving the Ohio Companies 45 days to file a plan in a new docket to address the Court’s concern.
 
                   The Ohio Companies filed an application and stipulation with the PUCO on September 9, 2005 seeking approval of the RCP. On November 4, 2005, the Ohio Companies filed a supplemental stipulation with the PUCO, which constituted an additional component of the RCP filed on September 9, 2005. Major provisions of the RCP include:

               
Maintaining the existing level of base distribution rates through December 31, 2008 for OE;
     
 
Deferring and capitalizing for future recovery (over a 25-year period) with carrying charges certain distribution costs to be incurred by all of the Ohio Companies during the period January 1, 2006 through December 31, 2008, not to exceed $150 million in each of the three years;
 
 
82

 
                   
 
Adjusting the RTC and extended RTC recovery periods and rate levels so that full recovery of authorized costs will occur as of December 31, 2008 for OE;
     
 
Reducing the deferred shopping incentive balances as of January 1, 2006 by up to $75 million for OE by accelerating the application of its accumulated cost of removal regulatory liability; and
     
 
Recovering increased fuel costs (compared to a 2002 baseline) of up to $75 million, $77 million, and $79 million, in 2006, 2007, and 2008, respectively, from all OE and TE distribution and transmission customers through a fuel recovery mechanism. The Ohio Companies may defer and capitalize (for recovery over a 25-year period) increased fuel costs above the amount collected through the fuel recovery mechanism.
 
                   The following table provides OE’s estimated net amortization of regulatory transition costs and deferred shopping incentives (including associated carrying charges) under the RCP for the period 2006 through 2008:

Amortization
 
 
Period
 
Amortization
   
(In millions)
2006
 
$
177
2007
 
 
180
2008
 
 
208
Total Amortization
 
$
565
       
 
 
       On January 4, 2006, the PUCO approved, with modifications, the Ohio Companies’ RCP to supplement the RSP to provide customers with more certain rate levels than otherwise available under the RSP during the plan period. On January 10, 2006, the Ohio Companies filed a Motion for Clarification of the PUCO order approving the RCP. The Ohio Companies sought clarity on issues related to distribution deferrals, including requirements of the review process, timing for recognizing certain deferrals and definitions of the types of qualified expenditures. The Ohio Companies also sought confirmation that the list of deferrable distribution expenditures originally included in the revised stipulation fall within the PUCO order definition of qualified expenditures. On January 25, 2006, the PUCO issued an Entry on Rehearing granting in part, and denying in part, the Ohio Companies’ previous requests and clarifying issues referred to above. The PUCO granted the Ohio Companies’ requests to:

               
·
Recognize fuel and distribution deferrals commencing January 1, 2006;
     
 
·
Recognize distribution deferrals on a monthly basis prior to review by the PUCO Staff;
     
 
·
Clarify that the types of distribution expenditures included in the Supplemental Stipulation may be deferred; and
     
 
·
Clarify that distribution expenditures do not have to be “accelerated” in order to be deferred.
     
 
                   The PUCO approved the Ohio Companies’ methodology for determining distribution deferral amounts, but denied the Motion in that the PUCO Staff must verify the level of distribution expenditures contained in current rates, as opposed to simply accepting the amounts contained in the Ohio Companies’ Motion. On February 3, 2006, several other parties filed applications for rehearing on the PUCO's January 4, 2006 Order. The Ohio Companies responded to the applications for rehearing on February 13, 2006. In an Entry on Rehearing issued by the PUCO on March 1, 2006, all motions for rehearing were denied. Certain of these parties have subsequently filed notices of appeal with the Supreme Court of Ohio alleging various errors made by the PUCO in its order approving the RCP. The Ohio Companies’ Motion to Intervene in the appeals was granted by the Supreme Court on June 8, 2006. The Appellants’ Merit Briefs were filed at the Supreme Court on July 5, 2006. The Appellees include the PUCO and the Ohio Companies. The Appellees’ Merit Briefs are due on August 4, 2006. Appellants’ Reply Briefs will then be due on August 24, 2006.
 
 
                    On December 30, 2004, OE filed with the PUCO two applications related to the recovery of transmission and ancillary service related costs. The first application sought recovery of these costs beginning January 1, 2006. The Ohio Companies requested that these costs be recovered through a rider that would be effective on January 1, 2006 and adjusted each July 1 thereafter. The parties reached a settlement agreement that was approved by the PUCO on August 31, 2005. The incremental transmission and ancillary service revenues recovered from January 1 through June 30, 2006 were approximately $31 million. That amount included the recovery of a portion of the 2005 deferred MISO expenses as described below. On May 1, 2006, OE filed a modification to the rider to determine revenues ($71 million) from July 2006 through June 2007.

83


                   The second application sought authority to defer costs associated with transmission and ancillary service related costs incurred during the period October 1, 2003 through December 31, 2005. On May 18, 2005, the PUCO granted the accounting authority for the Ohio Companies to defer incremental transmission and ancillary service-related charges incurred as a participant in MISO, but only for those costs incurred during the period December 30, 2004 through December 31, 2005. Permission to defer costs incurred prior to December 30, 2004 was denied. The PUCO also authorized the Ohio Companies to accrue carrying charges on the deferred balances. On August 31, 2005, the OCC appealed the PUCO's decision. On January 20, 2006, the OCC sought rehearing of the PUCO’s approval of the recovery of deferred costs through the rider during the period January 1, 2006 through June 30, 2006. The PUCO denied the OCC's application on February 6, 2006. On March 23, 2006, the OCC appealed the PUCO's order to the Ohio Supreme Court. On March 27, 2006, the OCC filed a motion to consolidate this appeal with the deferral appeals discussed above and to postpone oral arguments in the deferral appeal until after all briefs are filed in this most recent appeal of the rider recovery mechanism. On March 20, 2006, the Ohio Supreme Court, on its own motion, consolidated the OCC's appeal of the Ohio Companies' case with a similar case involving Dayton Power & Light Company. Oral arguments were heard on May 10, 2006. The Ohio Companies are unable to predict when a decision may be issued.
 
                   Under Pennsylvania's electric competition law, Penn is required to secure generation supply for customers who do not choose alternative suppliers for their electricity. On October 11, 2005, Penn filed a plan with the PPUC to secure electricity supply for its customers at set rates following the end of its transition period on December 31, 2006. Penn recommended that the RFP process cover the period January 1, 2007 through May 31, 2008. To the extent that an affiliate of Penn supplies a portion of the PLR load included in the RFP, authorization to make the affiliate sale must be obtained from the FERC. Hearings before the PPUC were held on January 10, 2006 with main briefs filed on January 27, 2006 and reply briefs filed on February 3, 2006. On February 16, 2006, the ALJ issued a Recommended Decision to adopt Penn's RFP process with modifications. On April 20, 2006, the PPUC approved the Recommended Decision with additional modifications to use an RFP process to obtain Penn's power supply requirements after 2006 through two separate solicitations. An initial solicitation was held for Penn in May 2006 with all tranches fully subscribed. On June 2, 2006, the PPUC approved the bid results for the first solicitation. On July 18, 2006, the second PLR solicitation was held for Penn. The tranches for the Residential Group and Small Commercial Group were fully subscribed. However, supply was only acquired for three of the five tranches for the Large Commercial Group. On July 20, 2006, the PPUC approved the submissions for the second bid. A residual solicitation is scheduled to be held on August 15, 2006 for the two remaining Large Commercial Group tranches. Acceptance of the winning bids is subject to approval by the PPUC.
 
                   On May 25, 2006, Penn filed a Petition for Review of the PPUC’s Orders of April 28, 2006 and May 4, 2006, which together decided the issues associated with Penn’s proposed Interim PLR Supply Plan. Penn has asked the Commonwealth Court to review the PPUC’s decision to deny its recovery of certain PLR costs via a reconciliation mechanism and its decision to impose a geographic limitation on the sources of alternative energy credits. On June 7, 2006, the PaDEP filed a Petition for Review appealing the PPUC’s ruling on the method by which alternative energy credits may be acquired and traded. Penn is unable to predict the outcome of this appeal.
                   
                   On November 1, 2005, FES filed two power sales agreements for approval with the FERC. One power sales agreement provided for FES to provide the PLR requirements of the Ohio Companies at a price equal to the retail generation rates approved by the PUCO for a period of three years beginning January 1, 2006. The Ohio Companies will be relieved of their obligation to obtain PLR power requirements from FES if the Ohio CBP results in a lower price for retail customers. A similar power sales agreement between FES and Penn permits Penn to obtain its PLR power requirements from FES at a fixed price equal to the retail generation price during 2006. The PPUC approved Penn's plan with modifications on April 20, 2006 to use an RFP process to obtain its power supply requirements after 2006 through two separate solicitations. An initial solicitation was held for Penn in May 2006 with all tranches fully subscribed. On June 2, 2006, the PPUC approved the bid results for the first solicitation. On July 18, 2006, the second PLR solicitation was held for Penn. The tranches for the Residential Group and Small Commercial Group were fully subscribed. However, supply was only acquired for three of the five tranches for the Large Commercial Group. On July 20, 2006, the PPUC approved the submission for the second bid. A residual solicitation is scheduled to be held on August 15, 2006 for the two remaining Large Commercial Group tranches. Acceptance of the winning bids is subject to approval by the PPUC.
                   
                   On December 29, 2005, the FERC issued an order setting the two power sales agreements for hearing. The order criticized the Ohio CBP, and required FES to submit additional evidence in support of the reasonableness of the prices charged in the power sales agreements. A pre-hearing conference was held on January 18, 2006 to determine the hearing schedule in this case. Under the procedural schedule, approved in this case, FES expected an initial decision to be issued in late January 2007. However, on July 14, 2006, the Chief Judge granted the joint motion of FES and the Trial Staff to appoint a settlement judge in this proceeding. The procedural schedule has been suspended pending negotiations among the parties.
 
                    See Note 11 to the consolidated financial statements for further details and a complete discussion of regulatory matters in Ohio and Pennsylvania and a detailed discussion of reliability initiatives, including initiatives by the PPUC, that impact Penn.

84


Environmental Matters
 
                   OE accrues environmental liabilities only when it concludes that it is probable that it has an obligation for such costs and can reasonably estimate the amount of such costs. Unasserted claims are reflected in OE’s determination of environmental liabilities and are accrued in the period that they are both probable and reasonably estimable.
 
         W. H. Sammis Plant-
 
                    In 1999 and 2000, the EPA issued NOV or Compliance Orders to nine utilities alleging violations of the Clean Air Act based on operation and maintenance of 44 power plants, including the W. H. Sammis Plant, which was owned at that time by OE and Penn. In addition, the DOJ filed eight civil complaints against various investor-owned utilities, including a complaint against OE and Penn in the U.S. District Court for the Southern District of Ohio. These cases are referred to as New Source Review cases. On March 18, 2005, OE and Penn announced that they had reached a settlement with the EPA, the DOJ and three states (Connecticut, New Jersey, and New York) that resolved all issues related to the W. H. Sammis Plant New Source Review litigation. This settlement agreement was approved by the Court on July 11, 2005, and requires reductions of NOX and SO2 emissions at the W. H. Sammis Plant and other coal fired plants through the installation of pollution control devices and provides for stipulated penalties for failure to install and operate such pollution controls in accordance with that agreement. Those requirements will be the responsibility of FGCO. The settlement agreement also requires OE and Penn to spend up to $25 million toward environmentally beneficial projects, which include wind energy purchased power agreements over a 20-year term. OE and Penn agreed to pay a civil penalty of $8.5 million. Results for the first quarter of 2005 included the penalties paid by OE and Penn of $7.8 million and $0.7 million, respectively. OE and Penn also recognized liabilities in the first quarter of 2005 of $9.2 million and $0.8 million, respectively, for probable future cash contributions toward environmentally beneficial projects.

See Note 10(B) to the consolidated financial statements for further details and a complete discussion of environmental matters.

Other Legal Proceedings

There are various lawsuits, claims (including claims for asbestos exposure) and proceedings related to OE’s normal business operations pending against OE and its subsidiaries. The other potentially material items not otherwise discussed above are described below.
 
         Power Outages and Related Litigation-
 
                   On August 14, 2003, various states and parts of southern Canada experienced widespread power outages. The outages affected approximately 1.4 million customers in FirstEnergy's service area. The U.S. - Canada Power System Outage Task Force’s final report in April 2004 on the outages concluded, among other things, that the problems leading to the outages began in FirstEnergy’s Ohio service area. Specifically, the final report concluded, among other things, that the initiation of the August 14, 2003 power outages resulted from an alleged failure of both FirstEnergy and ECAR to assess and understand perceived inadequacies within the FirstEnergy system; inadequate situational awareness of the developing conditions; and a perceived failure to adequately manage tree growth in certain transmission rights of way. The Task Force also concluded that there was a failure of the interconnected grid's reliability organizations (MISO and PJM) to provide effective real-time diagnostic support. The final report is publicly available through the Department of Energy’s Web site (www.doe.gov). FirstEnergy believes that the final report does not provide a complete and comprehensive picture of the conditions that contributed to the August 14, 2003 power outages and that it does not adequately address the underlying causes of the outages. FirstEnergy remains convinced that the outages cannot be explained by events on any one utility's system. The final report contained 46 “recommendations to prevent or minimize the scope of future blackouts.” Forty-five of those recommendations related to broad industry or policy matters while one, including subparts, related to activities the Task Force recommended be undertaken by FirstEnergy, MISO, PJM, ECAR, and other parties to correct the causes of the August 14, 2003 power outages. FirstEnergy implemented several initiatives, both prior to and since the August 14, 2003 power outages, which were independently verified by NERC as complete in 2004 and were consistent with these and other recommendations and collectively enhance the reliability of its electric system. FirstEnergy’s implementation of these recommendations in 2004 included completion of the Task Force recommendations that were directed toward FirstEnergy. FirstEnergy is also proceeding with the implementation of the recommendations that were to be completed subsequent to 2004 and will continue to periodically assess the FERC-ordered Reliability Study recommendations for forecasted 2009 system conditions, recognizing revised load forecasts and other changing system conditions which may impact the recommendations. Thus far, implementation of the recommendations has not required, nor is expected to require, substantial investment in new or material upgrades to existing equipment. The FERC or other applicable government agencies and reliability coordinators may, however, take a different view as to recommended enhancements or may recommend additional enhancements in the future as the result of adoption of mandatory reliability standards pursuant to the EPACT that could require additional material expenditures.

85

 
                   FirstEnergy companies also are defending six separate complaint cases before the PUCO relating to the August 14, 2003 power outage. Two cases were originally filed in Ohio State courts but were subsequently dismissed for lack of subject matter jurisdiction and further appeals were unsuccessful. In these cases the individual complainants—three in one case and four in the other—sought to represent others as part of a class action. The PUCO dismissed the class allegations, stating that its rules of practice do not provide for class action complaints. Three other pending PUCO complaint cases, were filed by various insurance carriers either in their own name as subrogees or in the name of their insured. In each of these three cases, the carrier seeks reimbursement from various FirstEnergy companies (and, in one case, from PJM, MISO and American Electric Power Company, Inc., as well) for claims paid to insureds for damages allegedly arising as a result of the loss of power on August 14, 2003. The listed insureds in these cases, in many instances, are not customers of any FirstEnergy company. The sixth case involves the claim of a non-customer seeking reimbursement for losses incurred when its store was burglarized on August 14, 2003. FirstEnergy filed a Motion to Dismiss on June 13, 2006. It is currently expected that this case will be summarily dismissed, although the Motion is still pending. On March 7, 2006, the PUCO issued a ruling applicable to all pending cases. Among its various rulings, the PUCO consolidated all of the pending outage cases for hearing; limited the litigation to service-related claims by customers of the Ohio operating companies; dismissed FirstEnergy as a defendant; ruled that the U.S.-Canada Power System Outage Task Force Report was not admissible into evidence; and gave the plaintiffs additional time to amend their complaints to otherwise comply with the PUCO’s underlying order. Also, most complainants, along with the FirstEnergy companies, filed applications for rehearing with the PUCO over various rulings contained in the March 7, 2006 order. On April 26, 2006, the PUCO granted rehearing to allow the insurance company claimants, as insurers, to prosecute their claims in their name so long as they also identify the underlying insured entities and the Ohio utilities that provide their service. The PUCO denied all other motions for rehearing. The plaintiffs in each case have since filed an amended complaint and the named FirstEnergy companies have answered and also have filed a motion to dismiss each action. These motions are pending. Additionally, on June 23, 2006, one of the insurance carrier complainants filed an appeal with the Ohio Supreme Court over the PUCO’s denial of their motion for rehearing on the issue of the admissibility of the Task Force Report and the dismissal of FirstEnergy Corp. as a respondent. Briefing is expected to be completed on this appeal by mid-September. It is unknown when the Supreme Court will rule on the appeal. No estimate of potential liability is available for any of these cases.
 
                    FirstEnergy is vigorously defending these actions, but cannot predict the outcome of any of these proceedings or whether any further regulatory proceedings or legal actions may be initiated against the Companies. Although unable to predict the impact of these proceedings, if FirstEnergy or its subsidiaries were ultimately determined to have legal liability in connection with these proceedings, it could have a material adverse effect on FirstEnergy's or its subsidiaries' financial condition, results of operations and cash flows.

Nuclear Plant Matters-
 
                   As of December 16, 2005, NGC acquired ownership of the nuclear generation assets transferred from OE, Penn, CEI and TE with the exception of leasehold interests of OE and TE in certain of the nuclear plants that are subject to sale and leaseback arrangements with non-affiliates. Excluding OE's retained leasehold interests in Beaver Valley Unit 2 (21.66%) and Perry (12.58%), the transfer included the OE Companies’ prior owned interests in Beaver Valley Unit 1 (100%), Beaver Valley Unit 2 (33.96%) and Perry (22.66%).
 
              On August 12, 2004, the NRC notified FENOC that it would increase its regulatory oversight of the Perry Nuclear Power Plant as a result of problems with safety system equipment over the preceding two years and the licensee's failure to take prompt and corrective action. FENOC operates the Perry Nuclear Power Plant.
 
                   On April 4, 2005, the NRC held a public meeting to discuss FENOC’s performance at the Perry Nuclear Power Plant as identified in the NRC's annual assessment letter to FENOC. Similar public meetings are held with all nuclear power plant licensees following issuance by the NRC of their annual assessments. According to the NRC, overall the Perry Plant operated "in a manner that preserved public health and safety" even though it remained under heightened NRC oversight. During the public meeting and in the annual assessment, the NRC indicated that additional inspections will continue and that the plant must improve performance to be removed from the Multiple/Repetitive Degraded Cornerstone Column of the Action Matrix.
 
                   On September 28, 2005, the NRC sent a CAL to FENOC describing commitments that FENOC had made to improve the performance at the Perry Plant and stated that the CAL would remain open until substantial improvement was demonstrated. The CAL was anticipated as part of the NRC's Reactor Oversight Process. In the NRC's 2005 annual assessment letter dated March 2, 2006 and associated meetings to discuss the performance of Perry on March 14, 2006, the NRC again stated that the Perry Plant continued to operate in a manner that "preserved public health and safety." However, the NRC also stated that increased levels of regulatory oversight would continue until sustained improvement in the performance of the facility was realized. If performance does not improve, the NRC has a range of options under the Reactor Oversight Process, from increased oversight to possible impact to the plant’s operating authority. Although FirstEnergy is unable to predict the impact of the ultimate disposition of this matter, it could have a material adverse effect on FirstEnergy's or its subsidiaries' financial condition, results of operations and cash flows.

86

 
        Other Legal Matters-
 
                   On October 20, 2004, FirstEnergy was notified by the SEC that the previously disclosed informal inquiry initiated by the SEC's Division of Enforcement in September 2003 relating to the restatements in August 2003 of previously reported results by FirstEnergy and the Ohio Companies, and the Davis-Besse extended outage, have become the subject of a formal order of investigation. The SEC's formal order of investigation also encompasses issues raised during the SEC's examination of FirstEnergy and the Companies under the now repealed PUHCA. Concurrent with this notification, FirstEnergy received a subpoena asking for background documents and documents related to the restatements and Davis-Besse issues. On December 30, 2004, FirstEnergy received a subpoena asking for documents relating to issues raised during the SEC's PUHCA examination. On August 24, 2005, additional information was requested regarding Davis-Besse related disclosures, which FirstEnergy has provided. FirstEnergy has cooperated fully with the informal inquiry and will continue to do so with the formal investigation.

                   On August 22, 2005, a class action complaint was filed against OE in Jefferson County, Ohio Common Pleas Court, seeking compensatory and punitive damages to be determined at trial based on claims of negligence and eight other tort counts alleging damages from W.H. Sammis Plant air emissions. The two named plaintiffs are also seeking injunctive relief to eliminate harmful emissions and repair property damage and the institution of a medical monitoring program for class members.
 
                   The City of Huron filed a complaint against OE with the PUCO challenging the ability of electric distribution utilities to collect transition charges from a customer of a newly-formed municipal electric utility. The complaint was filed on May 28, 2003, and OE timely filed its response on June 30, 2003. In a related filing, the Ohio Companies filed for approval with the PUCO of a tariff that would specifically allow the collection of transition charges from customers of municipal electric utilities formed after 1998. Both filings were consolidated for hearing and decision described above. An adverse ruling could negatively affect full recovery of transition charges by the utility. Hearings on the matter were held in August 2005. Initial briefs from all parties were filed on September 22, 2005 and reply briefs were filed on October 14, 2005. On May 10, 2006, the PUCO issued its Opinion and Order dismissing the City’s complaint and approving the related tariffs, thus affirming OE’s entitlement to recovery of its transition charges. The City of Huron filed an application for rehearing of the PUCO’s decision on June 9, 2006 and OE filed a memorandum in opposition to that application on June 19, 2006. The PUCO denied the City’s application for rehearing on June 28, 2006. The City of Huron has 60 days from the denial of rehearing to appeal the PUCO’s decision.
 
                    If it were ultimately determined that FirstEnergy or its subsidiaries have legal liability or are otherwise made subject to liability based on the above matters, it could have a material adverse effect on FirstEnergy’s or its subsidiaries’ financial condition, results of operations and cash flows.

    See Note 10(C) to the consolidated financial statements for further details and a complete discussion of these and other legal proceedings.

NEW ACCOUNTING STANDARDS AND INTERPRETATIONS

FIN 48 - “Accounting for Uncertainty in Income Taxes - an interpretation of FASB Statement No. 109.”

In June 2006, the FASB issued FIN 48 which clarifies the accounting for uncertainty in income taxes recognized in an enterprise’s financial statements in accordance with FASB Statement No. 109, “Accounting for Income Taxes.” This interpretation prescribes a recognition threshold and measurement attribute for the financial statement recognition and measurement of a tax position taken or expected to be taken on a tax return. This interpretation also provides guidance on derecognition, classification, interest, penalties, accounting in interim periods, disclosure and transition. The evaluation of a tax position in accordance with this interpretation will be a two-step process. The first step will determine if it is more likely than not that a tax position will be sustained upon examination and should therefore be recognized. The second step will measure a tax position that meets the more likely than not recognition threshold to determine the amount of benefit to recognize in the financial statements. This interpretation is effective for fiscal years beginning after December 15, 2006. OE is currently evaluating the impact of this Statement.

87


 
THE CLEVELAND ELECTRIC ILLUMINATING COMPANY
CONSOLIDATED STATEMENTS OF INCOME AND COMPREHENSIVE INCOME
 
(Unaudited)
 
     
Three Months Ended 
June 30,  
   
Six Months Ended
June 30, 
 
 
 
 
2006
   
2005
   
2006
   
2005
 
 
   
(In thousands) 
 
STATEMENTS OF INCOME
                         
                           
REVENUES
 
$
432,371
 
$
448,747
 
$
840,181
 
$
881,920
 
                           
EXPENSES:
                         
Fuel
   
13,413
   
21,110
   
26,976
   
39,437
 
Purchased power
   
157,942
   
138,842
   
301,711
   
281,726
 
Nuclear operating costs
   
-
   
36,786
   
-
   
95,513
 
Other operating costs
   
68,436
   
74,711
   
141,331
   
138,284
 
Provision for depreciation
   
11,050
   
33,387
   
28,251
   
64,502
 
Amortization of regulatory assets
   
29,476
   
55,016
   
61,006
   
109,042
 
Deferral of new regulatory assets
   
(31,698
)
 
(40,701
)
 
(62,223
)
 
(65,989
)
General taxes
   
31,510
   
36,605
   
66,580
   
75,492
 
Total expenses
   
280,129
   
355,756
   
563,632
   
738,007
 
                           
OPERATING INCOME
   
152,242
   
92,991
   
276,549
   
143,913
 
                           
OTHER INCOME (EXPENSE):
                         
Investment income
   
24,674
   
14,049
   
51,610
   
29,197
 
Miscellaneous income (expense)
   
5,642
   
(2,292
)
 
5,396
   
(8,764
)
Interest expense
   
(34,634
)
 
(30,152
)
 
(69,366
)
 
(64,618
)
Capitalized interest
   
837
   
1,294
   
1,510
   
883
 
Total other income (expense)
   
(3,481
)
 
(17,101
)
 
(10,850
)
 
(43,302
)
                           
INCOME TAXES
   
57,709
   
37,221
   
102,234
   
46,470
 
                           
NET INCOME
   
91,052
   
38,669
   
163,465
   
54,141
 
                           
PREFERRED STOCK DIVIDEND REQUIREMENTS
   
-
   
-
   
-
   
2,918
 
                           
EARNINGS ON COMMON STOCK
 
$
91,052
 
$
38,669
 
$
163,465
 
$
51,223
 
                           
                           
STATEMENTS OF COMPREHENSIVE INCOME
                         
                           
NET INCOME
 
$
91,052
 
$
38,669
 
$
163,465
 
$
54,141
 
                           
OTHER COMPREHENSIVE INCOME (LOSS):
                         
Unrealized loss on available for sale securities
   
-
   
(1,349
)
 
-
   
(2,570
)
Income tax benefit related to other comprehensive income
   
-
   
419
   
-
   
923
 
Other comprehensive loss, net of tax
   
-
   
(930
)
 
-
   
(1,647
)
                           
TOTAL COMPREHENSIVE INCOME
 
$
91,052
 
$
37,739
 
$
163,465
 
$
52,494
 
                           
The preceding Notes to Consolidated Financial Statements as they relate to The Cleveland Electric Illuminating Company
are an integral part of these statements.
 
 
 
88

 

THE CLEVELAND ELECTRIC ILLUMINATING COMPANY
 
CONSOLIDATED BALANCE SHEETS
 
(Unaudited)
 
 
   
June 30, 
   
December 31,
 
 
 
 
2006
   
2005
 
   
(In thousands) 
 
ASSETS
             
CURRENT ASSETS:
             
Cash and cash equivalents
 
$
217
 
$
207
 
Receivables-
             
Customers (less accumulated provisions of $5,836,000 and $5,180,000,
             
respectively, for uncollectible accounts)
   
273,324
   
268,427
 
Associated companies
   
37,168
   
86,564
 
Other
   
14,703
   
16,466
 
Notes receivable from associated companies
   
29,048
   
19,378
 
Prepayments and other
   
1,504
   
1,903
 
     
355,964
   
392,945
 
UTILITY PLANT:
             
In service
   
2,063,137
   
2,030,935
 
Less - Accumulated provision for depreciation
   
800,356
   
788,967
 
     
1,262,781
   
1,241,968
 
Construction work in progress
   
73,869
   
51,129
 
     
1,336,650
   
1,293,097
 
OTHER PROPERTY AND INVESTMENTS:
             
Long-term notes receivable from associated companies
   
940,786
   
1,057,337
 
Investment in lessor notes
   
519,615
   
564,166
 
Other
   
13,710
   
12,840
 
     
1,474,111
   
1,634,343
 
DEFERRED CHARGES AND OTHER ASSETS:
             
Goodwill
   
1,688,521
   
1,688,966
 
Regulatory assets
   
858,618
   
862,193
 
Prepaid pension costs
   
137,082
   
139,012
 
Property taxes
   
63,500
   
63,500
 
Other
   
33,130
   
27,614
 
     
2,780,851
   
2,781,285
 
   
$
5,947,576
 
$
6,101,670
 
LIABILITIES AND CAPITALIZATION
             
CURRENT LIABILITIES:
             
Currently payable long-term debt
 
$
543
 
$
75,718
 
Short-term borrowings-
             
Associated companies
   
154,731
   
212,256
 
Other
   
149,000
   
140,000
 
Accounts payable-
             
Associated companies
   
65,148
   
74,993
 
Other
   
8,121
   
4,664
 
Accrued taxes
   
119,555
   
121,487
 
Accrued interest
   
18,810
   
18,886
 
Lease market valuation liability
   
60,200
   
60,200
 
Other
   
39,512
   
61,308
 
     
615,620
   
769,512
 
               
CAPITALIZATION:
             
Common stockholder's equity-
             
Common stock, without par value, authorized 105,000,000 shares -
             
79,590,689 shares outstanding
   
1,355,926
   
1,354,924
 
Retained earnings
   
687,615
   
587,150
 
Total common stockholder's equity
   
2,043,541
   
1,942,074
 
Long-term debt and other long-term obligations
   
1,886,636
   
1,939,300
 
     
3,930,177
   
3,881,374
 
NONCURRENT LIABILITIES:
             
Accumulated deferred income taxes
   
551,553
   
554,828
 
Accumulated deferred investment tax credits
   
22,093
   
23,908
 
Lease market valuation liability
   
577,900
   
608,000
 
Retirement benefits
   
83,604
   
83,414
 
Deferred revenues - electric service programs
   
63,566
   
71,261
 
Other
   
103,063
   
109,373
 
     
1,401,779
   
1,450,784
 
COMMITMENTS AND CONTINGENCIES (Note 10)
             
   
$
5,947,576
 
$
6,101,670
 
               
The preceding Notes to Consolidated Financial Statements as they relate to The Cleveland Electric Illuminating Company are an integral part of these balance sheets.
   
 
 
89

 



THE CLEVELAND ELECTRIC ILLUMINATING COMPANY    
 
CONSOLIDATED STATEMENTS OF CASH FLOWS
 
(Unaudited)
 
 
Six Months Ended
 
   
June 30, 
 
   
2006
   
2005
 
 
 
(In thousands) 
 
CASH FLOWS FROM OPERATING ACTIVITIES:
           
Net income
$
163,465
 
$
54,141
 
Adjustments to reconcile net income to net cash from operating activities -
           
Provision for depreciation
 
28,251
   
64,502
 
Amortization of regulatory assets
 
61,006
   
109,042
 
Deferral of new regulatory assets
 
(62,223
)
 
(65,989
)
Nuclear fuel and capital lease amortization
 
120
   
10,781
 
Deferred rents and lease market valuation liability
 
(55,043
)
 
(53,691
)
Deferred income taxes and investment tax credits, net
 
(4,745
)
 
4,450
 
Accrued compensation and retirement benefits
 
1,584
   
(373
)
Decrease (increase) in operating assets-
           
Receivables
 
46,262
   
(98,074
)
Materials and supplies
 
-
   
(28,791
)
Prepayments and other current assets
 
399
   
188
 
Increase (decrease) in operating liabilities-
           
Accounts payable
 
(6,388
)
 
38,280
 
Accrued taxes
 
(1,932
)
 
(6,779
)
Accrued interest
 
(76
)
 
(320
)
Electric service prepayment programs
 
(7,695
)
 
57,466
 
Other
 
(4,162
)
 
(7,871
)
Net cash provided from operating activities
 
158,823
   
76,962
 
             
CASH FLOWS FROM FINANCING ACTIVITIES:
           
New Financing-
           
Long-term debt
 
-
   
53,284
 
Short-term borrowings, net
 
-
   
58,874
 
Equity contributions from parent
 
-
   
75,000
 
Redemptions and Repayments-
           
Preferred stock
 
-
   
(101,900
)
Long-term debt
 
(118,152
)
 
(56,930
)
Short-term borrowings, net
 
(57,675
)
 
-
 
Dividend Payments-
           
Common stock
 
(63,000
)
 
(124,000
)
Preferred stock
 
-
   
(2,260
)
Net cash used for financing activities
 
(238,827
)
 
(97,932
)
             
CASH FLOWS FROM INVESTING ACTIVITIES:
           
Property additions
 
(65,551
)
 
(60,244
)
Loan repayments from associated companies, net
 
108,169
   
66,927
 
Investments in lessor notes
 
44,551
   
32,473
 
Proceeds from nuclear decommissioning trust fund sales
 
-
   
198,974
 
Investments in nuclear decommissioning trust funds
 
-
   
(213,486
)
Other
 
(7,155
)
 
(3,664
)
Net cash provided from investing activities
 
80,014
   
20,980
 
             
Net increase in cash and cash equivalents
 
10
   
10
 
Cash and cash equivalents at beginning of period
 
207
   
197
 
Cash and cash equivalents at end of period
$
217
 
$
207
 
             
The preceding Notes to Consolidated Financial Statements as they relate to The Cleveland Electric Illuminating Company are an integral part of these statements.
   

 
90




Report of Independent Registered Public Accounting Firm









To the Stockholder and Board of
Directors of The Cleveland Electric Illuminating Company:

We have reviewed the accompanying consolidated balance sheet of The Cleveland Electric Illuminating Company and its subsidiaries as of June 30, 2006, and the related consolidated statements of income and comprehensive income for each of the three-month and six-month periods ended June 30, 2006 and 2005 and the consolidated statement of cash flows for the six-month period ended June 30, 2006 and 2005. These interim financial statements are the responsibility of the Company’s management.

We conducted our review in accordance with the standards of the Public Company Accounting Oversight Board (United States). A review of interim financial information consists principally of applying analytical procedures and making inquiries of persons responsible for financial and accounting matters. It is substantially less in scope than an audit conducted in accordance with the standards of the Public Company Accounting Oversight Board, the objective of which is the expression of an opinion regarding the financial statements taken as a whole. Accordingly, we do not express such an opinion.

Based on our review, we are not aware of any material modifications that should be made to the accompanying consolidated interim financial statements for them to be in conformity with accounting principles generally accepted in the United States of America.

We have previously audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated balance sheet as of December 31, 2005, and the related consolidated statements of income, capitalization, common stockholder’s equity, preferred stock, cash flows and taxes for the year then ended (not presented herein), and in our report [which contained references to the Company’s change in its method of accounting for asset retirement obligations as of January 1, 2003 and conditional asset retirement obligations as of December 31, 2005 as discussed in Note 2(G) and Note 11 to those consolidated financial statements and the Company’s change in its method of accounting for the consolidation of variable interest entities as of December 31, 2003 as discussed in Note 6 to those consolidated financial statements] dated February 27, 2006, we expressed an unqualified opinion on those consolidated financial statements. In our opinion, the information set forth in the accompanying consolidated balance sheet as of December 31, 2005, is fairly stated in all material respects in relation to the consolidated balance sheet from which it has been derived.




PricewaterhouseCoopers LLP
Cleveland, Ohio
August 4, 2006



91


THE CLEVELAND ELECTRIC ILLUMINATING COMPANY

MANAGEMENT’S DISCUSSION AND ANALYSIS OF
RESULTS OF OPERATIONS AND FINANCIAL CONDITION


CEI is a wholly owned, electric utility subsidiary of FirstEnergy. CEI conducts business in portions of Ohio, providing regulated electric distribution services. CEI also provides generation services to those customers electing to retain CEI as their power supplier. CEI’s power supply requirements are primarily provided by FES - an affiliated company.

FirstEnergy Intra-System Generation Asset Transfers
 
                   In 2005, the Ohio Companies and Penn entered into certain agreements implementing a series of intra-system generation asset transfers that were completed in the fourth quarter of 2005. The asset transfers resulted in the respective undivided ownership interests of the Ohio Companies and Penn in FirstEnergy’s nuclear and non-nuclear generation assets being owned by NGC and FGCO, respectively. The generating plant interests transferred did not include CEI’s leasehold interests in certain of the plants that are currently subject to sale and leaseback arrangements with non-affiliates.
 
                   On October 24, 2005, CEI completed the intra-system transfer of non-nuclear generation assets to FGCO. Prior to the transfer, FGCO, as lessee under a Master Facility Lease with the Ohio Companies and Penn, leased, operated and maintained the non-nuclear generation assets that it now owns. The asset transfers were consummated pursuant to FGCO's purchase option under the Master Facility Lease.
 
                   On December 16, 2005, CEI completed the intra-system transfer of their ownership interests in the nuclear generation assets to NGC through a sale at net book value. FENOC continues to operate and maintain the nuclear generation assets.
 
                   These transactions were undertaken pursuant to the Ohio Companies’ and Penn’s restructuring plans that were approved by the PUCO and the PPUC, respectively, under applicable Ohio and Pennsylvania electric utility restructuring legislation. Consistent with the restructuring plans, generation assets that had been owned by the Ohio Companies and Penn were required to be separated from the regulated delivery business of those companies through transfer to a separate corporate entity. The transactions essentially completed the divestitures contemplated by the restructuring plans by transferring the ownership interests to NGC and FGCO without impacting the operation of the plants.
 
               The transfers will affect CEI’s comparative earnings results with reductions in both revenues and expenses. Revenues are reduced due to the termination of certain arrangements with FES, under which CEI previously sold its nuclear-generated KWH to FES and leased its non-nuclear generation assets to FGCO, a subsidiary of FES. CEI’s expenses are lower due to the nuclear fuel and operating costs assumed by NGC as well as depreciation and property tax expenses assumed by FGCO and NGC related to the transferred generating assets. With respect to CEI's retained leasehold interests in the Bruce Mansfield Plant, CEI has continued the fossil generation KWH sales arrangement with FES and continues to be obligated on the applicable portion of expenses related to those interests. In addition, CEI receives interest income on associated company notes receivable from the transfer of its generation net assets. FES will continue to provide CEI’s PLR requirements under revised purchased power arrangements for the three-year period beginning January 1, 2006 (see Regulatory Matters).



92


The effects on CEI’s results of operations in the second quarter and first six months of 2006 compared to the same periods of 2005 from the generation asset transfers (also reflecting CEI's retained leasehold interests discussed above) are summarized in the following table:

Intra-System Generation Asset Transfers
Income Statement Effects
 
Three Months
   
Six Months
 
Increase (Decrease)
 
(In millions)
 
Revenues:
           
Non-nuclear generating units rent
(a)
 $
(14
)  
 $
(29
)
Nuclear generated KWH sales
(b)
 
 (57
 
 
 (110
) 
Total - Revenues Effect
   
(71
)    
(139
) 
Expenses:
               
Fuel costs - nuclear
(c)
 
(8
)    
(14
) 
Nuclear operating costs
(c)
 
(37
)     
(95
) 
Provision for depreciation
(d)
 
(13
)     
(32
) 
General taxes
(e)
 
(4
)    
(8
) 
Total - Expenses Effect
   
(62
)    
(149
) 
Operating Income Effect
   
(9
)     
10
 
Other Income:
               
Interest income from notes receivable
(f)
 
14
     
30
 
Nuclear decommissioning trust earnings
(g)
 
(2
)    
(4
) 
Capitalized interest
(h)
 
(1
 
 
 -
 
Total - Other Income Effect
 
 
11
   
 
26
 
Income taxes
(i)
 
1
 
 
 
15
 
Net Income Effect
 
 $
1
   
 $
  21
 
                 
(a) Elimination of non-nuclear generation assets lease to FGCO.
(b) Reduction of nuclear generated wholesale KWH sales to FES.
(c) Reduction of nuclear fuel and operating costs.
(d) Reduction of depreciation expense and asset retirement obligation accretion related to generation assets.
(e) Reduction of property tax expense on generation assets.
(f) Interest income on associated company notes receivable from the transfer of generation net assets.
(g) Reduction of earnings on nuclear decommissioning trusts.
(h) Reduction of allowance for borrowed funds used during construction on nuclear capital expenditures.
(i) Income tax effect of the above adjustments.

Results of Operations
 
Earnings on common stock in the second quarter of 2006 increased to $91 million from $39 million in the second quarter of 2005. In the first six months of 2006, earnings on common stock increased to $163 million from $51 million in the same period of 2005. The increase in earnings in both 2006 periods resulted primarily from lower expenses and increased other income, partially offset by lower revenues. These changes reflected the effects of the generation asset transfer shown in the table above and the absence of the $2 million Davis-Besse fine in the first quarter of 2005 and the $8 million impact of the Ohio tax change implementation in the second quarter of 2005.

Revenues

Revenues decreased by $16 million or 3.6% in the second quarter of 2006 from the same period in 2005. Excluding the effects of the generation asset transfers displayed above, revenues increased $55 million due to a $105 million increase in retail generation sales revenues and a $28 million reduction in customer shopping incentives, partially offset by a $62 million decrease in distribution revenues and a $19 million decrease in MSG wholesale sales. In the first six months of 2006 compared to the same period in 2005, revenues decreased by $42 million or 4.7%. Excluding the effects of the generation asset transfers discussed above, revenues increased $97 million due to a $193 million increase in retail generation sales revenues and a $47 million reduction in customer shopping incentives, partially offset by a $106 million decrease in distribution revenues and a $37 million decrease in MSG wholesale sales.

Non-affiliated wholesale sales revenues decreased by $19 million for the second quarter of 2006 and $37 million for the first six months of 2006 compared with the same periods in 2005 due to the cessation of the MSG sales arrangements under CEI’s transition plan in December 2005. CEI had been required to provide the MSG to non-affiliated alternative suppliers.


93


Changes in electric generation KWH sales and revenues in the second quarter and first six months of 2006 from the corresponding periods of 2005 are summarized in the following table.

Changes in Generation KWH Sales
 
Three Months
 
Six Months
 
Increase (Decrease)
 
 
 
 
 
Electric Generation:
 
 
 
 
 
Retail
 
 
50.7
%
 
48.5
%
Wholesale
 
 
(74.0)
%
 
(71.4)
%
Net Decrease in Generation Sales
 
 
(21.4)
%
 
(17.7)
%

Changes in Generation Revenues
   
Three Months
   
Six Months
 
Increase (Decrease)
   
(In millions)
 
Retail Generation:
             
Residential
 
$
39
 
$
77
 
Commercial
 
 
38
 
 
70
 
Industrial
 
 
28
 
 
46
 
Total Retail Generation
   
105
   
193
 
Wholesale*
   
(19
)
 
(37
)
Net Increase in Generation Revenues
 
$
86
 
$
156
 

 * Excludes impact of generation asset transfers related to nuclear generated KWH sales.

Increased retail generation revenue as shown in the table above for the second quarter 2006 compared with the same quarter of 2005 was due to increased KWH sales and higher unit prices. The higher unit prices for generation reflected the rate stabilization charge that became effective in the first quarter of 2006 under provisions of the RSP and RCP. The increase in generation KWH sales resulted from decreased customer shopping. Generation services provided by alternative suppliers as a percent of total sales delivered in CEI's service area decreased by: residential - 61.0 percentage points, commercial - 43.5 percentage points and industrial - 8.9 percentage points. The decreased shopping resulted from certain alternative energy suppliers terminating their supply arrangements with CEI's shopping customers in the fourth quarter of 2005.

Increased retail generation revenues in the first six months of 2006 compared with the same period in 2005 were also due to increased KWH sales and the higher unit prices under provisions of the RSP and RCP. The increase in generation KWH sales reflected a similar decrease in customer shopping as discussed above. This resulted in similar percentage decreases in the first half of 2006 in generation services provided by alternative suppliers as a percentage of total sales deliveries in CEI's service area (residential - 60.0 percentage points, commercial - 41.1 percentage points and industrial - 7.6 percentage points).

Changes in distribution KWH deliveries and revenues in the second quarter and first six months of 2006 from the corresponding periods of 2005 are summarized in the following table.

Changes in Distribution KWH Sales
 
Three Months
 
Six Months
 
Increase (Decrease)
 
 
 
 
 
Distribution Deliveries:
 
 
 
 
 
 
 
Residential
 
 
(5.6)
%
 
(3.8)
%
Commercial
 
 
(2.7)
%
 
(4.3)
%
Industrial
 
 
(1.5)
%
 
(2.6)
%
Net Decrease in Distribution Deliveries
 
 
(2.8)
%
 
(3.3)
%

 
Changes in Distribution Revenues
 
Three Months
 
Six Months
Increase (Decrease)
 
(In millions)
Residential
 
$
(16
)
$
(21
)
Commercial
 
 
(23
)
 
(45
)
Industrial
 
 
(23
)
 
(40
)
Net Decrease in Distribution Revenues
 
$
(62
)
$
(106
)

Lower distribution revenues as shown in the table above in the second quarter and first six months of 2006 primarily reflected lower unit prices and decreased KWH deliveries. The lower unit prices reflected the completion of the generation-related transition cost recovery under CEI’s transition plan in 2005, partially offset by increased transmission rates to recover MISO costs beginning in 2006 (see Outlook -- Regulatory Matters). The lower KWH distribution deliveries to residential and commercial customers reflected the impact of milder weather conditions in the second quarter and first six months of 2006, compared to the same periods of 2005.

94



Under the Ohio transition plan, CEI had provided incentives to customers to encourage switching to alternative energy providers, reducing CEI's revenues. These revenue reductions, which were deferred for future recovery and did not affect earnings, ceased in 2006, resulting in a $28 million revenue increase for the second quarter of 2006 and a $47 million increase for the first six months of 2006 compared to the same periods of 2005, as discussed above.

Expenses

Total expenses decreased by $76 million in the second quarter and $174 million in the first six months of 2006 from the same periods of 2005, principally due to the asset transfer effects as shown in the table above. Excluding the asset transfer effects, the following table presents changes from the prior year by expense category:

Expenses - Changes
 
Three Months
 
Six Months
 
Increase (Decrease)
 
(In millions)
 
Fuel costs
 
$
-
 
$
1
 
Purchased power costs
 
 
19
 
 
20
 
Other operating costs
   
(6
)
 
3
 
Provision for depreciation
 
 
(9
)
 
(4
)
Amortization of regulatory assets
 
 
(26
)
 
(48
)
Deferral of new regulatory assets
 
 
9
 
 
4
 
General taxes
 
 
(1
)
 
(1
)
Net decrease in expenses
 
$
(14
)
$
(25
)

Higher purchased power costs in the second quarter and in the first six months of 2006 compared with the same periods in 2005 primarily reflected increases in KWH purchased to meet higher retail generation sales requirements. These increases were partially offset by the impact of lower unit prices associated with the new power supply agreement with FES and purchased power lease credit amortizations of $8 million and $16 million in the second quarter and the first six months of 2006, respectively. The amortization is for the above-market lease liability related to an existing Beaver Valley Unit 2 purchased power arrangement with TE. The lease credit amortization had been previously included in CEI's nuclear operating costs and the related nuclear generation KWH purchased from TE had then been sold to FES. Subsequent to the generation asset transfer, CEI now retains this purchased power from TE to meet a portion of its PLR obligation and, consequently, the lease amortization is now included as part of CEI's purchased power costs. Lower other operating costs in the second quarter of 2006 compared with the same period in 2005 reflected the absence in 2006 of transmission expenses related to the 2005 competitive retail energy supplier reimbursements which were discontinued at the end of 2005. Higher other operating costs in the first six months of 2006 compared with the same period in 2005 reflect increased transmission expenses, primarily related to MISO Day 2 operations that began on April 1, 2005.

Excluding the effects of the generation asset transfers, the decrease in depreciation in the second quarter and first six months of 2006 compared with the same periods of 2005 was primarily attributable to a second quarter 2006 pretax credit adjustment of $6.5 million ($4 million net of tax) applicable to prior periods. Lower amortization of regulatory assets in both periods of 2006 reflected the completion of generation-related transition cost amortization under CEI’s transition plan, partially offset by the amortization of deferred MISO costs that are being recovered in 2006. The decreased deferral of new regulatory assets in the second quarter and first six months of 2006 compared with the same periods in 2005 was primarily due to the termination of the shopping incentive deferrals ($28 million and $47 million, respectively) and lower deferred MISO costs ($6 million and $5 million, respectively), partially offset by the deferrals of distribution costs ($14 million and $29 million, respectively) and fuel costs ($11 million and $19 million, respectively) under the RCP.

Other Income

The increase in other income of $14 million in the second quarter and $32 million in the first six months of 2006 compared with the same periods last year was primarily due to interest income on associated company notes receivable from the generation asset transfers discussed above. Excluding the effects of the asset transfer, other income increased for the second quarter and first six months of 2006 by $2 million and $7 million, respectively. The increase in both periods was primarily due to a $6 million benefit recognized in the second quarter of 2006 related to the sale of the Ashtabula C Plant, partially offset by increased interest expense in 2006 in both periods due to the absence of financing cost reductions recognized in 2005 related to refinancing activities.

Income Taxes

Increased income taxes in the second quarter and in the first six months of 2006 compared with the same periods last year were primarily due to an increase in taxable income, partially offset by a reduction in the tax rates due to the continuing phase-out of the income-based Ohio franchise tax and the absence of a second quarter 2005 addition to income taxes of approximately $8 million, from the implementation of the Ohio tax legislation.

95



Preferred Stock Dividend Requirements

Preferred stock dividend requirements decreased by $3 million in the first six months of 2006, compared to the same period last year as a result of the optional redemption of CEI's remaining outstanding preferred stock in 2005.

Capital Resources and Liquidity
 
                   During 2006, CEI expects to meet its contractual obligations with cash from operations and short-term credit arrangements. Thereafter, CEI expects to use a combination of cash from operations and funds from the capital markets.

Changes in Cash Position
 
                   As of June 30, 2006, CEI had $217,000 of cash and cash equivalents, compared with $207,000 as of December 31, 2005. The major sources of changes in these balances are summarized below.

Cash Flows from Operating Activities

Cash provided from operating activities during the first six months of 2006, compared with the same period last year, were as follows:

   
Six Months Ended
June 30,
 
Operating Cash Flows
 
2006
 
2005
 
   
(In millions)
 
           
Cash earnings *
 
$
125
 
$
113
 
Working capital and other
   
34
   
(36
)
Net cash provided from operating activities
 
$
159
 
$
77
 

* Cash earnings are a non-GAAP measure (see reconciliation below). 

Cash earnings (in the table above) are not a measure of performance calculated in accordance with GAAP. CEI believes that cash earnings are a useful financial measure because it provides investors and management with an additional means of evaluating its cash-based operating performance. The following table reconciles cash earnings with net income:

   
Six Months Ended
 
   
June 30,
 
Reconciliation of Cash Earnings
 
2006
 
2005
 
   
(In millions)
 
Net Income (GAAP)
 
$
163
 
$
54
 
Non-cash charges (credits):
 
 
   
 
 
 
Provision for depreciation
 
 
28
 
 
65
 
Amortization of regulatory assets
 
 
61
 
 
109
 
Deferral of new regulatory assets
 
 
(62
)
 
(66
Nuclear fuel and capital lease amortization
 
 
-
 
 
11
 
Amortization of electric service obligation
 
 
(7
)
 
(10
Deferred rents and lease market valuation liability
 
 
(55
)
 
(54
Deferred income taxes and investment tax credits, net
 
 
(5
)
 
5
 
Accrued compensation and retirement benefits
 
 
2
 
 
(1
Cash earnings (Non-GAAP)
 
$
125
 
$
113
 

Net cash provided from operating activities increased by $82 million in the first six months of 2006 from the same period last year as a result of a $12 million increase in cash earnings described above under "Results of Operations" and a $70 million increase from working capital and other cash flows. The largest factors contributing to the changes in working capital and other operating cash flows for the first six months of 2006 are changes in accounts receivable related to the 2005 conversion of the CFC receivables financing ($155 million) to on-balance sheet transactions, offset in part by changes in accounts payable and the absence of funds received in 2005 for prepaid electric service under the Energy for Education Program.

96



Cash Flows from Financing Activities

Net cash used for financing activities increased by $141 million in the first six months of 2006 from the same period last year. The increase in funds used for financing activities primarily resulted from a $129 million increase in net preferred stock and debt redemptions and the absence of a $75 million equity contribution from FirstEnergy in 2005, partially offset by a $61 million decrease in common stock dividend payments to FirstEnergy.

CEI had $29 million of cash and temporary investments (which included short-term notes receivable from associated companies) and approximately $304 million of short-term indebtedness as of June 30, 2006. CEI has obtained authorization from the PUCO to incur short-term debt of up to $500 million (including the bank facility and utility money pool described below). As of June 30, 2006, CEI had the capability to issue $247 million of additional FMB on the basis of property additions and retired bonds under the terms of its mortgage indenture. The issuance of FMB by CEI is subject to a provision of its senior note indenture generally limiting the incurrence of additional secured debt, subject to certain exceptions that would permit, among other things, the issuance of secured debt (including FMB) (i) supporting pollution control notes or similar obligations, or (ii) as an extension, renewal or replacement of previously outstanding secured debt. In addition, CEI is permitted under the indenture to incur additional secured debt not otherwise permitted by a specified exception of up to $576 million as of June 30, 2006. CEI has no restrictions on the issuance of preferred stock.

CFC is a wholly owned subsidiary of CEI whose borrowings are secured by customer accounts receivable purchased from CEI and TE. CFC can borrow up to $200 million under a receivables financing arrangement. As a separate legal entity with separate creditors, CFC would have to satisfy its obligations to creditors before any of its remaining assets could be made available to CEI. As of June 30, 2006, the facility was drawn for $149 million.

CEI has the ability to borrow from its regulated affiliates and FirstEnergy to meet its short-term working capital requirements. FESC administers this money pool and tracks surplus funds of FirstEnergy and its regulated subsidiaries. Companies receiving a loan under the money pool agreements must repay the principal amount, together with accrued interest, within 364 days of borrowing the funds. The rate of interest is the same for each company receiving a loan from the pool and is based on the average cost of funds available through the pool. The average interest rate for borrowings in the first six months of 2006 was 4.86%.
 
                   CEI, FirstEnergy, OE, Penn, TE, JCP&L, Met-Ed, Penelec, FES and ATSI, as Borrowers, have entered into a syndicated $2 billion five-year revolving credit facility through a syndicate of banks that expires in June 2010. Borrowings under the facility are available to each Borrower separately and mature on the earlier of 364 days from the date of borrowing or the commitment expiration date, as the same may be extended. CEI’s borrowing limit under the facility is $250 million subject to applicable regulatory approvals.
 
                   Under the revolving credit facility, borrowers may request the issuance of letters of credit expiring up to one year from the date of issuance. The stated amount of outstanding LOC will count against total commitments available under the facility and against the applicable borrower’s borrowing sub-limit.
 
                    The revolving credit facility contains financial covenants requiring each borrower to maintain a consolidated debt to total capitalization ratio of no more than 65%. As of June 30, 2006, CEI's debt to total capitalization as defined under the revolving credit facility was 49%.
 
              The facility does not contain any provisions that either restrict CEI's ability to borrow or accelerate repayment of outstanding advances as a result of any change in its credit ratings. Pricing is defined in “pricing grids”, whereby the cost of funds borrowed under the facility is related to CEI's credit ratings.

CEI’s access to the capital markets and the costs of financing are dependent on the ratings of its securities and the securities of FirstEnergy. The ratings outlook from S&P on all such securities is stable. The ratings outlook from Moody's and Fitch on all securities is positive.
 
                   IIn April and May of 2006, pollution control notes that were formerly obligations of CEI were refinanced and became obligations of FGCO and NGC. The proceeds from the refinancings were used to repay a portion of their associated company notes payable to CEI. CEI redeemed $117.8 million of pollution control notes having variable interest rates.

97



Cash Flows from Investing Activities

Net cash provided from investing activities increased by $59 million in the first six months of 2006 from the same period last year. The change was primarily due to increased loan repayments from associated companies and the absence of net investments in nuclear decommissioning trust funds due to the intra-system nuclear generation asset transfer.

CEI’s capital spending for the last half of 2006 is expected to be approximately $58 million. These cash requirements are expected to be satisfied from internal cash and short-term credit arrangements. CEI’s capital spending for the period 2006-2010 is expected to be approximately $620 million of which approximately $127 million applies to 2006.

Off-Balance Sheet Arrangements

Obligations not included on CEI’s Consolidated Balance Sheet primarily consist of sale and leaseback arrangements involving the Bruce Mansfield Plant. As of June 30, 2006, the present value of these operating lease commitments, net of trust investments, total $98 million.

Outlook
 
                   The electric industry continues to transition to a more competitive environment and all of CEI’s customers can select alternative energy suppliers. CEI continues to deliver power to residential homes and businesses through its existing distribution system, which remains regulated. Customer rates have been restructured into separate components to support customer choice. CEI has a continuing responsibility to provide power to those customers not choosing to receive power from an alternative energy supplier subject to certain limits.

Regulatory Matters
                  
                   Regulatory assets are costs which have been authorized by the PUCO and the FERC for recovery from customers in future periods or for which authorization is probable. Without the probability of such authorization, costs currently recorded as regulatory assets would have been charged to income as incurred. All regulatory assets are expected to be recovered under the provisions of CEI’s transition plan. CEI’s regulatory assets as of June 30, 2006 and December 31, 2005, were $859 million and $862 million, respectively.

On October 21, 2003 the Ohio Companies filed their RSP case with the PUCO. On August 5, 2004, the Ohio Companies accepted the RSP as modified and approved by the PUCO in an August 4, 2004 Entry on Rehearing, subject to a CBP. The RSP was intended to establish generation service rates beginning January 1, 2006, in response to the PUCO’s concerns about price and supply uncertainty following the end of the Ohio Companies' transition plan market development period. In October 2004, the OCC and NOAC filed appeals with the Supreme Court of Ohio to overturn the original June 9, 2004 PUCO order in the proceeding as well as the associated entries on rehearing. On September 28, 2005, the Supreme Court of Ohio heard oral arguments on the appeals. On May 3, 2006, the Supreme Court of Ohio issued an opinion affirming the PUCO's order with respect to the approval of the rate stabilization charge, approval of the shopping credits, the granting of interest on shopping credit incentive deferral amounts, and approval of the Ohio Companies’ financial separation plan. It remanded one matter back to the PUCO for further consideration of the issue as to whether the RSP, as adopted by the PUCO, provided for sufficient means for customer participation in the competitive marketplace. On May 12, 2006, the Ohio Companies filed a Motion for Reconsideration with the Supreme Court of Ohio which was denied by the Court on June 21, 2006. The RSP contained a provision that permitted the Ohio Companies to withdraw and terminate the RSP in the event that the PUCO, or the Supreme Court of Ohio, rejected all or part of the RSP. In such event, the Ohio Companies have 30 days from the final order or decision to provide notice of termination. On July 20, 2006 the Ohio Companies filed with the PUCO a Request to Initiate a Proceeding on Remand. In their Request, the Ohio Companies provided notice of termination to those provisions of the RSP subject to termination, subject to being withdrawn, and also set forth a framework for addressing the Supreme Court of Ohio’s findings on customer participation, requesting the PUCO to initiate a proceeding to consider the Ohio Companies’ proposal. If the PUCO approves a resolution to the issues raised by the Supreme Court of Ohio that is acceptable to the Ohio Companies, the Ohio Companies’ termination will be withdrawn and considered to be null and void. Separately, the OCC and NOAC also submitted to the PUCO on July 20, 2006 a conceptual proposal dealing with the issue raised by the Supreme Court of Ohio. On July 26, 2006, the PUCO issued an Entry acknowledging the July 20, 2006 filings of the Ohio Companies and the OCC and NOAC, and giving the Ohio Companies 45 days to file a plan in a new docket to address the Court’s concern.

98



The Ohio Companies filed an application and stipulation with the PUCO on September 9, 2005 seeking approval of the RCP. On November 4, 2005, the Ohio Companies filed a supplemental stipulation with the PUCO, which constituted an additional component of the RCP filed on September 9, 2005. Major provisions of the RCP include:

 
     ·
Maintaining the existing level of base distribution rates through April 30, 2009 for CEI;
     
 
·
Deferring and capitalizing for future recovery (over a 25-year period) with carrying charges certain distribution costs to be incurred by all of the Ohio Companies during the period January 1, 2006 through December 31, 2008, not to exceed $150 million in each of the three years;
     
 
·
Adjusting the RTC and extended RTC recovery periods and rate levels so that full recovery of authorized costs will occur as of December 31, 2010 for CEI;
     
 
·
Reducing the deferred shopping incentive balances as of January 1, 2006 by up to $85 million for CEI by accelerating the application of its accumulated cost of removal regulatory liability; and
     
 
·
Deferring and capitalizing (for recovery over a 25-year period) increased fuel costs above the amount collected through the Ohio Companies’ fuel recovery mechanism.

The following table provides CEI’s estimated amortization of regulatory transition costs and deferred shopping incentives (including associated carrying charges) under the RCP for the period 2006 through 2010:

Amortization
     
Period
 
Amortization
 
   
(In millions)
 
2006
 
$
95
 
2007
 
 
113
 
2008
 
 
130
 
2009
 
 
211
 
2010
 
 
266
 
Total Amortization
 
$
815
 

On January 4, 2006, the PUCO approved, with modifications, the Ohio Companies’ RCP to supplement the RSP to provide customers with more certain rate levels than otherwise available under the RSP during the plan period. On January 10, 2006, the Ohio Companies filed a Motion for Clarification of the PUCO order approving the RCP. The Ohio Companies sought clarity on issues related to distribution deferrals, including requirements of the review process, timing for recognizing certain deferrals and definitions of the types of qualified expenditures. The Ohio Companies also sought confirmation that the list of deferrable distribution expenditures originally included in the revised stipulation fall within the PUCO order definition of qualified expenditures. On January 25, 2006, the PUCO issued an Entry on Rehearing granting in part, and denying in part, the Ohio Companies’ previous requests and clarifying issues referred to above. The PUCO granted the Ohio Companies’ requests to:

                  
·
Recognize fuel and distribution deferrals commencing January 1, 2006;
     
 
·
Recognize distribution deferrals on a monthly basis prior to review by the PUCO Staff;
     
 
·
Clarify that the types of distribution expenditures included in the Supplemental Stipulation may be deferred; and
     
 
·
Clarify that distribution expenditures do not have to be “accelerated” in order to be deferred.

The PUCO approved the Ohio Companies’ methodology for determining distribution deferral amounts, but denied the Motion in that the PUCO Staff must verify the level of distribution expenditures contained in current rates, as opposed to simply accepting the amounts contained in the Ohio Companies’ Motion. On February 3, 2006, several other parties filed applications for rehearing on the PUCO's January 4, 2006 Order. The Ohio Companies responded to the applications for rehearing on February 8, 2006. In an Entry on Rehearing issued by the PUCO on March 1, 2006, all motions for rehearing were denied. Certain of these parties have subsequently filed notices of appeal with the Supreme Court of Ohio alleging various errors made by the PUCO in its order approving the RCP. The Ohio Companies’ Motion to Intervene in the appeals was granted by the Supreme Court on June 8, 2006. The Appellants’ Merit Briefs were filed at the Supreme Court on July 5, 2006. The Appellees include the PUCO and the Ohio Companies. The Appellees’ Merit Briefs are due on August 4, 2006. Appellants’ Reply Briefs will then be due on August 24, 2006.

99



On December 30, 2004, CEI filed with the PUCO two applications related to the recovery of transmission and ancillary service related costs. The first application sought recovery of these costs beginning January 1, 2006. The Ohio Companies requested that these costs be recovered through a rider that would be effective on January 1, 2006 and adjusted each July 1 thereafter. The parties reached a settlement agreement that was approved by the PUCO on August 31, 2005. The incremental transmission and ancillary service revenues recovered from January 1 through June 30, 2006 were approximately $23.5 million. That amount included the recovery of a portion of the 2005 deferred MISO expenses as described below. On May 1, 2006, CEI filed a modification to the rider to determine revenues ($51 million) from July 2006 through June 2007.

The second application sought authority to defer costs associated with transmission and ancillary service related costs incurred during the period from October 1, 2003 through December 31, 2005. On May 18, 2005, the PUCO granted the accounting authority for CEI to defer incremental transmission and ancillary service-related charges incurred as a participant in MISO, but only for those costs incurred during the period December 30, 2004 through December 31, 2005. Permission to defer costs incurred prior to December 30, 2004 was denied. The PUCO also authorized CEI to accrue carrying charges on the deferred balances. On August 31, 2005, the OCC appealed the PUCO's decision. On January 20, 2006, the OCC sought rehearing of the PUCO’s approval of the recovery of deferred costs through the rider during the period January 1, 2006 through June 30, 2006. The PUCO denied the OCC's application on February 6, 2006. On March 23, 2006, the OCC appealed the PUCO's order to the Ohio Supreme Court. On March 27, 2006, the OCC filed a motion to consolidate this appeal with the deferral appeals discussed above and to postpone oral arguments in the deferral appeal until after all briefs are filed in this most recent appeal of the rider recovery mechanism. On March 20, 2006, the Ohio Supreme Court, on its own motion, consolidated the OCC's appeal of CEI’s case with a similar case involving Dayton Power & Light Company. Oral arguments were heard on May 10, 2006. CEI is unable to predict when a decision may be issued.
 
On November 1, 2005, FES filed two power sales agreements for approval with the FERC. One power sales agreement provided for FES to provide the PLR requirements of the Ohio Companies at a price equal to the retail generation rates approved by the PUCO for a period of three years beginning January 1, 2006. The Ohio Companies will be relieved of their obligation to obtain PLR power requirements from FES if the Ohio CBP results in a lower price for retail customers.

On December 29, 2005, the FERC issued an order setting the two power sales agreements for hearing. The order criticized the Ohio CBP, and required FES to submit additional evidence in support of the reasonableness of the prices charged in the power sales agreements. A pre-hearing conference was held on January 18, 2006 to determine the hearing schedule in this case. Under the procedural schedule, approved in this case, FES expected an initial decision to be issued in late January 2007. However, on July 14, 2006, the Chief Judge granted the joint motion of FES and the Trial Staff to appoint a settlement judge in this proceeding. The procedural schedule has been suspended pending negotiations among the parties.

See Note 11 to the consolidated financial statements for further details and a complete discussion of regulatory matters in Ohio.

Environmental Matters

CEI accrues environmental liabilities when it is probable that it has an obligation for such costs and can reasonably estimate the amount of such costs. Unasserted claims are reflected in CEI’s determination of environmental liabilities and are accrued in the period that they are both probable and reasonably estimable.

Regulation of Hazardous Waste-

CEI has been named a PRP at waste disposal sites, which may require cleanup under the Comprehensive Environmental Response, Compensation and Liability Act of 1980. Allegations of disposal of hazardous substances at historical sites and the liability involved are often unsubstantiated and subject to dispute; however, federal law provides that all PRPs for a particular site are liable on a joint and several basis. Therefore, environmental liabilities that are considered probable have been recognized on the Consolidated Balance Sheet as of June 30, 2006, based on estimates of the total costs of cleanup, CEI’s proportionate responsibility for such costs and the financial ability of other unaffiliated entities to pay. Included in Other Noncurrent Liabilities are accrued liabilities aggregating approximately $2 million as of June 30, 2006.

See Note 10(B) to the consolidated financial statements for further details and a complete discussion of environmental matters.

100



Other Legal Proceedings

Power Outages and Related Litigation-

On August 14, 2003, various states and parts of southern Canada experienced widespread power outages. The outages affected approximately 1.4 million customers in FirstEnergy's service area. The U.S. - Canada Power System Outage Task Force’s final report in April 2004 on the outages concluded, among other things, that the problems leading to the outages began in FirstEnergy’s Ohio service area. Specifically, the final report concluded, among other things, that the initiation of the August 14, 2003 power outages resulted from an alleged failure of both FirstEnergy and ECAR to assess and understand perceived inadequacies within the FirstEnergy system; inadequate situational awareness of the developing conditions; and a perceived failure to adequately manage tree growth in certain transmission rights of way. The Task Force also concluded that there was a failure of the interconnected grid's reliability organizations (MISO and PJM) to provide effective real-time diagnostic support. The final report is publicly available through the Department of Energy’s Web site (www.doe.gov). FirstEnergy believes that the final report does not provide a complete and comprehensive picture of the conditions that contributed to the August 14, 2003 power outages and that it does not adequately address the underlying causes of the outages. FirstEnergy remains convinced that the outages cannot be explained by events on any one utility's system. The final report contained 46 “recommendations to prevent or minimize the scope of future blackouts.” Forty-five of those recommendations related to broad industry or policy matters while one, including subparts, related to activities the Task Force recommended be undertaken by FirstEnergy, MISO, PJM, ECAR, and other parties to correct the causes of the August 14, 2003 power outages. FirstEnergy implemented several initiatives, both prior to and since the August 14, 2003 power outages, which were independently verified by NERC as complete in 2004 and were consistent with these and other recommendations and collectively enhance the reliability of its electric system. FirstEnergy’s implementation of these recommendations in 2004 included completion of the Task Force recommendations that were directed toward FirstEnergy. FirstEnergy is also proceeding with the implementation of the recommendations that were to be completed subsequent to 2004 and will continue to periodically assess the FERC-ordered Reliability Study recommendations for forecasted 2009 system conditions, recognizing revised load forecasts and other changing system conditions which may impact the recommendations. Thus far, implementation of the recommendations has not required, nor is expected to require, substantial investment in new or material upgrades to existing equipment. The FERC or other applicable government agencies and reliability coordinators may, however, take a different view as to recommended enhancements or may recommend additional enhancements in the future as the result of adoption of mandatory reliability standards pursuant to the EPACT that could require additional material expenditures.

FirstEnergy companies also are defending six separate complaint cases before the PUCO relating to the August 14, 2003 power outage. Two cases were originally filed in Ohio State courts but were subsequently dismissed for lack of subject matter jurisdiction and further appeals were unsuccessful. In these cases the individual complainants—three in one case and four in the other—sought to represent others as part of a class action. The PUCO dismissed the class allegations, stating that its rules of practice do not provide for class action complaints. Three other pending PUCO complaint cases were filed by various insurance carriers either in their own name as subrogees or in the name of their insured. In each of these three cases, the carrier seeks reimbursement from various FirstEnergy companies (and, in one case, from PJM, MISO and American Electric Power Company, Inc., as well) for claims paid to insureds for damages allegedly arising as a result of the loss of power on August 14, 2003. The listed insureds in these cases, in many instances, are not customers of any FirstEnergy company. The sixth case involves the claim of a non-customer seeking reimbursement for losses incurred when its store was burglarized on August 14, 2003. FirstEnergy filed a Motion to Dismiss on June 13, 2006. It is currently expected that this case will be summarily dismissed, although the Motion is still pending. On March 7, 2006, the PUCO issued a ruling applicable to all pending cases. Among its various rulings, the PUCO consolidated all of the pending outage cases for hearing; limited the litigation to service-related claims by customers of the Ohio operating companies; dismissed FirstEnergy as a defendant; ruled that the U.S.-Canada Power System Outage Task Force Report was not admissible into evidence; and gave the plaintiffs additional time to amend their complaints to otherwise comply with the PUCO’s underlying order. Also, most complainants, along with the FirstEnergy companies, filed applications for rehearing with the PUCO over various rulings contained in the March 7, 2006 order. On April 26, 2006, the PUCO granted rehearing to allow the insurance company claimants, as insurers, to prosecute their claims in their name so long as they also identify the underlying insured entities and the Ohio utilities that provide their service. The PUCO denied all other motions for rehearing. The plaintiffs in each case have since filed an amended complaint and the named FirstEnergy companies have answered and also have filed a motion to dismiss each action. These motions are pending. Additionally, on June 23, 2006, one of the insurance carrier complainants filed an appeal with the Ohio Supreme Court over the PUCO’s denial of their motion for rehearing on the issue of the admissibility of the Task Force Report and the dismissal of FirstEnergy Corp. as a respondent. Briefing is expected to be completed on this appeal by mid-September. It is unknown when the Supreme Court will rule on the appeal. No estimate of potential liability is available for any of these cases.

101



FirstEnergy is vigorously defending these actions, but cannot predict the outcome of any of these proceedings or whether any further regulatory proceedings or legal actions may be initiated against the Companies. Although unable to predict the impact of these proceedings, if FirstEnergy or its subsidiaries were ultimately determined to have legal liability in connection with these proceedings, it could have a material adverse effect on FirstEnergy's or its subsidiaries' financial condition, results of operations and cash flows.

Other Legal Matters

There are various lawsuits, claims (including claims for asbestos exposure) and proceedings related to CEI’s normal business operations pending against CEI and its subsidiaries. The other potentially material items not otherwise discussed above are described below.

On October 20, 2004, FirstEnergy was notified by the SEC that the previously disclosed informal inquiry initiated by the SEC's Division of Enforcement in September 2003 relating to the restatements in August 2003 of previously reported results by FirstEnergy and the Ohio Companies, and the Davis-Besse extended outage, have become the subject of a formal order of investigation. The SEC's formal order of investigation also encompasses issues raised during the SEC's examination of FirstEnergy and the Companies under the now repealed PUHCA. Concurrent with this notification, FirstEnergy received a subpoena asking for background documents and documents related to the restatements and Davis-Besse issues. On December 30, 2004, FirstEnergy received a subpoena asking for documents relating to issues raised during the SEC's PUHCA examination. On August 24, 2005, additional information was requested regarding Davis-Besse-related disclosures, which has been provided. FirstEnergy has cooperated fully with the informal inquiry and continues to do so with the formal investigation.

The City of Huron filed a complaint against OE with the PUCO challenging the ability of electric distribution utilities to collect transition charges from a customer of a newly-formed municipal electric utility. The complaint was filed on May 28, 2003, and OE timely filed its response on June 30, 2003. In a related filing, the Ohio Companies filed for approval with the PUCO of a tariff that would specifically allow the collection of transition charges from customers of municipal electric utilities formed after 1998. Both filings were consolidated for hearing and decision described above. An adverse ruling could negatively affect full recovery of transition charges by the utility. Hearings on the matter were held in August 2005. Initial briefs from all parties were filed on September 22, 2005 and reply briefs were filed on October 14, 2005. On May 10, 2006, the PUCO issued its Opinion and Order dismissing the City’s complaint and approving the related tariffs, thus affirming OE’s entitlement to recovery of its transition charges. The City of Huron filed an application for rehearing of the PUCO’s decision on June 9, 2006 and OE filed a memorandum in opposition to that application on June 19, 2006. The PUCO denied the City’s application for rehearing on June 28, 2006. The City of Huron has 60 days from the denial of rehearing to appeal the PUCO’s decision.
 
                         If it were ultimately determined that FirstEnergy or its subsidiaries have legal liability or are otherwise made subject to liability based on the above matters, it could have a material adverse effect on FirstEnergy's or its subsidiaries' financial condition, results of operations and cash flows.

See Note 10 (C) to the consolidated financial statements for further details and a complete discussion of other legal proceedings.

New Accounting Standards and Interpretations

FIN 48 - “Accounting for Uncertainty in Income Taxes - an interpretation of FASB Statement No. 109.”

In June 2006, the FASB issued FIN 48 which clarifies the accounting for uncertainty in income taxes recognized in an enterprise’s financial statements in accordance with FASB Statement No. 109, “Accounting for Income Taxes.” This interpretation prescribes a recognition threshold and measurement attribute for the financial statement recognition and measurement of a tax position taken or expected to be taken on a tax return. This interpretation also provides guidance on derecognition, classification, interest, penalties, accounting in interim periods, disclosure and transition. The evaluation of a tax position in accordance with this interpretation will be a two-step process. The first step will determine if it is more likely than not that a tax position will be sustained upon examination and should therefore be recognized. The second step will measure a tax position that meets the more likely than not recognition threshold to determine the amount of benefit to recognize in the financial statements. This interpretation is effective for fiscal years beginning after December 15, 2006. CEI is currently evaluating the impact of this Statement.


102

 

THE TOLEDO EDISON COMPANY
 
   
CONSOLIDATED STATEMENTS OF INCOME AND COMPREHENSIVE INCOME
 
(Unaudited)
 
   
   
Three Months Ended
 
Six Months Ended
 
   
June 30,
 
June 30,
 
   
2006
 
2005
 
2006
 
2005
 
STATEMENTS OF INCOME
 
(In thousands)
 
                       
REVENUES
 
$
225,598
 
$
259,109
 
$
443,575
 
$
500,864
 
                           
EXPENSES:
                         
Fuel
   
9,638
   
14,404
   
19,400
   
26,973
 
Purchased power
   
80,659
   
72,300
   
156,079
   
152,456
 
Nuclear operating costs
   
17,866
   
46,689
   
35,198
   
105,852
 
Other operating costs
   
39,718
   
41,311
   
80,143
   
75,659
 
Provision for depreciation
   
8,240
   
15,209
   
16,337
   
29,889
 
Amortization of regulatory assets
   
22,117
   
33,231
   
46,573
   
68,096
 
Deferral of new regulatory assets
   
(14,190
)
 
(12,670
)
 
(27,846
)
 
(22,094
)
General taxes
   
12,253
   
13,620
   
25,184
   
27,801
 
Total expenses
   
176,301
   
224,094
   
351,068
   
464,632
 
                           
OPERATING INCOME
   
49,297
   
35,015
   
92,507
   
36,232
 
                           
OTHER INCOME (EXPENSE):
                         
Investment income
   
8,945
   
8,188
   
18,725
   
17,072
 
Miscellaneous expense
   
(1,926
)
 
(3,100
)
 
(4,610
)
 
(6,402
)
Interest expense
   
(4,364
)
 
(2,941
)
 
(8,674
)
 
(9,977
)
Capitalized interest
   
344
   
188
   
558
   
(255
)
Total other income
   
2,999
   
2,335
   
5,999
   
438
 
                           
INCOME TAXES
   
19,924
   
29,674
   
37,128
   
28,629
 
                           
NET INCOME
   
32,372
   
7,676
   
61,378
   
8,041
 
                           
PREFERRED STOCK DIVIDEND REQUIREMENTS
   
1,161
   
2,211
   
2,436
   
4,422
 
                           
EARNINGS ON COMMON STOCK
 
$
31,211
 
$
5,465
 
$
58,942
 
$
3,619
 
                           
STATEMENTS OF COMPREHENSIVE INCOME
                         
                           
NET INCOME
 
$
32,372
 
$
7,676
 
$
61,378
 
$
8,041
 
                           
OTHER COMPREHENSIVE INCOME (LOSS):
                         
Unrealized gain (loss) on available for sale securities
   
191
   
(501
)
 
(947
)
 
(2,184
)
Income tax expense (benefit) related to other
                         
comprehensive income
   
69
   
(96
)
 
(342
)
 
(791
)
Other comprehensive income (loss), net of tax
   
122
   
(405
)
 
(605
)
 
(1,393
)
                           
TOTAL COMPREHENSIVE INCOME
 
$
32,494
 
$
7,271
 
$
60,773
 
$
6,648
 
                           
The preceding Notes to Consolidated Financial Statements as they relate to The Toledo Edison Company are an integral part of these statements.
 
103


 
THE TOLEDO EDISON COMPANY
 
   
CONSOLIDATED BALANCE SHEETS
 
(Unaudited)
 
   
June 30,
 
December 31,
 
   
2006
 
2005
 
   
(In thousands)
 
ASSETS
           
CURRENT ASSETS:
           
Cash and cash equivalents
 
$
23
 
$
15
 
Receivables-
             
Customers
   
782
   
2,209
 
Associated companies
   
39,407
   
16,311
 
Other
   
2,998
   
6,410
 
Notes receivable from associated companies
   
45,747
   
48,349
 
Prepayments and other
   
5,135
   
1,059
 
     
94,092
   
74,353
 
UTILITY PLANT:
             
In service
   
852,572
   
824,677
 
Less - Accumulated provision for depreciation
   
380,234
   
372,845
 
     
472,338
   
451,832
 
Construction work in progress
   
28,499
   
33,920
 
     
500,837
   
485,752
 
OTHER PROPERTY AND INVESTMENTS:
             
Long-term notes receivable from associated companies
   
382,733
   
436,178
 
Investment in lessor notes
   
169,493
   
178,798
 
Nuclear plant decommissioning trusts
   
59,126
   
59,209
 
Other
   
1,843
   
1,781
 
     
613,195
   
675,966
 
DEFERRED CHARGES AND OTHER ASSETS:
             
Goodwill
   
500,576
   
501,022
 
Regulatory assets
   
267,032
   
287,095
 
Prepaid pension costs
   
35,124
   
35,566
 
Property taxes
   
18,047
   
18,047
 
Other
   
39,728
   
24,164
 
     
860,507
   
865,894
 
   
$
2,068,631
 
$
2,101,965
 
LIABILITIES AND CAPITALIZATION
             
CURRENT LIABILITIES:
             
Currently payable long-term debt
 
$
-
 
$
53,650
 
Accounts payable-
             
Associated companies
   
30,571
   
46,386
 
Other
   
4,256
   
2,672
 
Notes payable to associated companies
   
136,571
   
64,689
 
Accrued taxes
   
53,092
   
49,344
 
Lease market valuation liability
   
24,600
   
24,600
 
Other
   
19,379
   
40,049
 
     
268,469
   
281,390
 
CAPITALIZATION:
             
Common stockholder's equity -
             
Common stock, $5 par value, authorized 60,000,000 shares -
             
39,133,887 shares outstanding
   
195,670
   
195,670
 
Other paid-in capital
   
473,908
   
473,638
 
Accumulated other comprehensive income
   
4,085
   
4,690
 
Retained earnings
   
223,370
   
189,428
 
Total common stockholder's equity
   
897,033
   
863,426
 
Preferred stock
   
66,000
   
96,000
 
Long-term debt
   
237,691
   
237,753
 
     
1,200,724
   
1,197,179
 
NONCURRENT LIABILITIES:
             
Accumulated deferred income taxes
   
209,389
   
221,149
 
Accumulated deferred investment tax credits
   
11,419
   
11,824
 
Lease market valuation liability
   
231,100
   
243,400
 
Retirement benefits
   
41,986
   
40,353
 
Asset retirement obligation
   
25,675
   
24,836
 
Deferred revenues - electric service programs
   
28,151
   
32,606
 
Other
   
51,718
   
49,228
 
     
599,438
   
623,396
 
COMMITMENTS AND CONTINGENCIES (Note 10)
             
   
$
2,068,631
 
$
2,101,965
 
               
The preceding Notes to Consolidated Financial Statements as they relate to The Toledo Edison Company are an integral part of these balance sheets.
 
 
104

 

THE TOLEDO EDISON COMPANY
 
   
CONSOLIDATED STATEMENTS OF CASH FLOWS
 
(Unaudited)
 
   
   
 Six Months Ended
 
   
 June 30,
 
   
 2006
 
 2005
 
   
 (In thousands)
 
   
CASH FLOWS FROM OPERATING ACTIVITIES:
           
Net income
 
$
61,378
 
$
8,041
 
Adjustments to reconcile net income to net cash from operating activities-
             
Provision for depreciation
   
16,337
   
29,889
 
Amortization of regulatory assets
   
46,573
   
68,096
 
Deferral of new regulatory assets
   
(27,846
)
 
(22,094
)
Nuclear fuel and capital lease amortization
   
-
   
8,134
 
Deferred rents and lease market valuation liability
   
(45,843
)
 
(44,466
)
Deferred income taxes and investment tax credits, net
   
(13,322
)
 
8,193
 
Accrued compensation and retirement benefits
   
1,268
   
1,500
 
Decrease (increase) in operating assets-
             
Receivables
   
(18,257
)
 
12,539
 
Materials and supplies
   
-
   
(5,912
)
Prepayments and other current assets
   
(4,076
)
 
408
 
Increase (decrease) in operating liabilities-
             
Accounts payable
   
(14,231
)
 
(74,371
)
Accrued taxes
   
3,748
   
10,509
 
Accrued interest
   
(222
)
 
(196
)
Electric service prepayment programs
   
(4,454
)
 
36,563
 
Other
   
3,326
   
(8,588
)
Net cash provided from operating activities
   
4,379
   
28,245
 
               
CASH FLOWS FROM FINANCING ACTIVITIES:
             
New Financing-
             
Long-term debt
   
-
   
45,000
 
Short-term borrowings, net
   
71,882
   
-
 
Redemptions and Repayments-
             
Preferred stock
   
(30,000
)
 
-
 
Long-term debt
   
(53,650
)
 
(46,933
)
Short-term borrowings, net
   
-
   
(96,381
)
Dividend Payments-
             
Common stock
   
(25,000
)
 
(10,000
)
Preferred stock
   
(2,436
)
 
(4,422
)
Net cash used for financing activities
   
(39,204
)
 
(112,736
)
               
CASH FLOWS FROM INVESTING ACTIVITIES:
             
Property additions
   
(29,361
)
 
(32,168
)
Loan repayments from (loans to) associated companies, net
   
2,611
   
(4,001
)
Collection of principal on long-term notes receivable
   
53,766
   
123,546
 
Investments in lessor notes
   
9,305
   
11,895
 
Proceeds from nuclear decommissioning trust fund sales
   
30,665
   
153,940
 
Investments in nuclear decommissioning trust funds
   
(30,754
)
 
(168,211
)
Other
   
(1,399
)
 
(510
)
Net cash provided from investing activities
   
34,833
   
84,491
 
               
Net change in cash and cash equivalents
   
8
   
-
 
Cash and cash equivalents at beginning of period
   
15
   
15
 
Cash and cash equivalents at end of period
 
$
23
 
$
15
 
               
The preceding Notes to Consolidated Financial Statements as they relate to The Toledo Edison Company are an integral part of these statements.
 


105




Report of Independent Registered Public Accounting Firm









To the Stockholder and Board of
Directors of The Toledo Edison Company:

We have reviewed the accompanying consolidated balance sheet of The Toledo Edison Company and its subsidiaries as of June 30, 2006, and the related consolidated statements of income and comprehensive income for each of the three-month and six-month periods ended June 30, 2006 and 2005 and the consolidated statement of cash flows for the six-month period ended June 30, 2006 and 2005. These interim financial statements are the responsibility of the Company’s management.

We conducted our review in accordance with the standards of the Public Company Accounting Oversight Board (United States). A review of interim financial information consists principally of applying analytical procedures and making inquiries of persons responsible for financial and accounting matters. It is substantially less in scope than an audit conducted in accordance with the standards of the Public Company Accounting Oversight Board, the objective of which is the expression of an opinion regarding the financial statements taken as a whole. Accordingly, we do not express such an opinion.

Based on our review, we are not aware of any material modifications that should be made to the accompanying consolidated interim financial statements for them to be in conformity with accounting principles generally accepted in the United States of America.

We have previously audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated balance sheet as of December 31, 2005, and the related consolidated statements of income, capitalization, common stockholder’s equity, preferred stock, cash flows and taxes for the year then ended (not presented herein), and in our report [which contained references to the Company’s change in its method of accounting for asset retirement obligations as of January 1, 2003 as discussed in Note 2(G) and Note 11 to those consolidated financial statements and the Company’s change in its method of accounting for the consolidation of variable interest entities as of December 31, 2003 as discussed in Note 6 to those consolidated financial statements] dated February 27, 2006, we expressed an unqualified opinion on those consolidated financial statements. In our opinion, the information set forth in the accompanying consolidated balance sheet as of December 31, 2005, is fairly stated in all material respects in relation to the consolidated balance sheet from which it has been derived.




PricewaterhouseCoopers LLP
Cleveland, Ohio
August 4, 2006



106


THE TOLEDO EDISON COMPANY

MANAGEMENT’S DISCUSSION AND ANALYSIS OF
RESULTS OF OPERATIONS AND FINANCIAL CONDITION


TE is a wholly owned electric utility subsidiary of FirstEnergy. TE conducts business in northwestern Ohio, providing regulated electric distribution services. TE also provides generation services to those customers electing to retain TE as their power supplier. TE’s power supply requirements are provided by FES - an affiliated company.

FirstEnergy Intra-System Generation Asset Transfers

In 2005, the Ohio Companies and Penn entered into certain agreements implementing a series of intra-system generation asset transfers that were completed in the fourth quarter of 2005. The asset transfers resulted in the respective undivided ownership interests of the Ohio Companies and Penn in FirstEnergy’s nuclear and non-nuclear generation assets being owned by NGC and FGCO, respectively. The generating plant interests transferred did not include TE's leasehold interests in certain of the plants that are currently subject to sale and leaseback arrangements with non-affiliates.

On October 24, 2005, TE completed the intra-system transfer of non-nuclear generation assets to FGCO. Prior to the transfer, FGCO, as lessee under a Master Facility Lease with the Ohio Companies and Penn, leased, operated and maintained the non-nuclear generation assets that it now owns. The asset transfers were consummated pursuant to FGCO's purchase option under the Master Facility Lease.

On December 16, 2005, TE completed the intra-system transfer of its ownership interests in the nuclear generation assets to NGC through a sale at net book value. FENOC continues to operate and maintain the nuclear generation assets.

These transactions were undertaken pursuant to the Ohio Companies’ and Penn’s restructuring plans that were approved by the PUCO and the PPUC, respectively, under applicable Ohio and Pennsylvania electric utility restructuring legislation. Consistent with the restructuring plans, generation assets that had been owned by the Ohio Companies and Penn were required to be separated from the regulated delivery business of those companies through transfer to a separate corporate entity. The transactions essentially completed the divestitures contemplated by the restructuring plans by transferring the ownership interests to NGC and FGCO without impacting the operation of the plants.

The transfers affect TE’s comparative earnings results with reductions in both revenues and expenses. Revenues are reduced due to the termination of certain arrangements with FES, under which TE previously sold its nuclear-generated KWH to FES and leased its non-nuclear generation assets to FGCO, a subsidiary of FES. TE’s expenses are lower due to the nuclear fuel and operating costs assumed by NGC as well as depreciation and property tax expenses assumed by FGCO and NGC related to the transferred generating assets. With respect to TE's retained leasehold interests in the Bruce Mansfield Plant and Beaver Valley Unit 2, TE has continued the generation KWH sales arrangement with FES and its Beaver Valley Unit 2 leased capacity sales arrangement with CEI, and continues to be obligated on the applicable portion of expenses related to those interests. In addition, TE receives interest income on associated company notes receivable from the transfer of its generation net assets. FES will continue to provide TE’s PLR requirements under revised purchased power arrangements for the three-year period beginning January 1, 2006 (see Outlook - Regulatory Matters).

107

 
 
                   The effects on TE’s results of operations in the second quarter and first six months of 2006 compared to the same periods of 2005 from the generation asset transfers are summarized in the following table:

Intra-System Generation Asset Transfers -
Income Statement Effects
 
Three Months
   
Six Months
 
Increase (Decrease)
 
(In millions)
 
Revenues:
           
Non-nuclear generating units rent
(a)
 $
(3
 
 $
(7
Nuclear generated KWH sales
(b)
 
 (29
 
 
 (51
Total - Revenues Effect
   
(32
   
(58
Expenses:
               
Fuel costs - nuclear
(c)
 
(5
   
(8
Nuclear operating costs
(c)
 
(22
   
(62
Provision for depreciation
(d)
 
(7
   
(16
General taxes
(e)
 
(2
   
(3
Total - Expenses Effect
   
(36
   
(89
Operating Income Effect
   
4
     
31
 
Other Income:
               
Interest income from notes receivable
(f)
 
4
     
8
 
Nuclear decommissioning trust earnings
(g)
 
(3
   
(4
Capitalized interest
(h)
 
(1
 
 
-
 
Total - Other Income Effect
 
 
-
   
 
4
 
Income taxes
(i)
 
1
     
14
 
Net Income Effect
 
 $
3
   
 $
21
 
                 
(a) Elimination of non-nuclear generation assets lease to FGCO.
(b) Reduction of nuclear generated wholesale KWH sales to FES.
(c) Reduction of nuclear fuel and operating costs.
(d) Reduction of depreciation expense and asset retirement obligation accretion related to generation assets.
(e) Reduction of property tax expense on generation assets.
(f) Interest income on associated company notes receivable from the transfer of generation net assets.
(g) Reduction of earnings on nuclear decommissioning trusts.
(h) Reduction of allowance for borrowed funds used during construction on nuclear capital expenditures.
(i) Income tax effect of the above adjustments.

Results of Operations

Earnings on common stock in the second quarter of 2006 increased to $31 million from $5 million in the second quarter of 2005. This increase resulted primarily from reduced expenses and the absence of additional income taxes of $17.5 million from the implementation of Ohio tax legislation changes in the second quarter of 2005, partially offset by lower revenues. Earnings on common stock in the first six months of 2006 increased to $59 million from $4 million in the first six months of 2005. This increase resulted primarily from reduced expenses, increased other income and the absence of the additional income taxes discussed above, also partially offset by lower revenues. The earnings increases for both periods included the effects of the generation asset transfer shown in the table above.
 
Revenues        
 
                   Revenues decreased by $33 million or 12.9% in the second quarter of 2006 compared with the same period of 2005, primarily due to the generation asset transfer impact displayed in the table above. Excluding the effects of the generation asset transfers, revenues decreased $1 million due to decreased distribution revenues of $34 million, partially offset by a $23 million increase in generation sales revenues, a $9 million reduction in customer shopping incentives and a $1 million increase in other revenues.

In the first six months of 2006, revenues decreased by $57 million or 11.4% compared with the same period of 2005, primarily due to the generation asset transfer impact displayed in the table above. Excluding the effects of the generation asset transfers, revenues increased $1 million due to a $44 million increase in generation sales revenues, a $15 million reduction in customer shopping incentives and a $1 million increase in other revenues, partially offset by a $59 million decrease in distribution revenues.

108


Changes in electric generation KWH sales and revenues in the second quarter and first six months of 2006 from the corresponding periods of 2005 are summarized in the following table.

Changes in Generation KWH Sales
 
Three Months
 
Six Months
 
Increase (Decrease)
 
 
 
 
 
Electric Generation:
 
 
 
 
 
Retail
 
 
16.1
%
 
12.8
%
Wholesale
 
 
(57.6
)%
 
(56.7
)%
Net Decrease in Generation Sales
 
 
(24.5
)%
 
(23.8
)%

 
Changes in Generation Revenues
 
Three Months
 
Six Months
Increase (Decrease)
 
(In millions)
Retail Generation:
             
    Residential
 
$
17
 
$
32
 
    Commercial
 
 
13
 
 
22
 
    Industrial
 
 
7
 
 
9
 
    Total Retail Generation
   
37
   
63
 
Wholesale*
   
(14
)
 
(19
)
Net Increase in Generation Revenues
 
$
23
 
$
44
 
 
* Excludes impact of generation asset transfers related to nuclear generated KWH sales.

Retail generation revenues increased in all customer sectors as shown in the table above in the second quarter of 2006 compared to the corresponding quarter of 2005 due to higher unit prices and increased KWH sales. The higher unit prices for generation reflected the rate stabilization charge and the fuel cost recovery rider that both became effective in the first quarter of 2006 under provisions of the RSP and RCP. The increase in generation KWH sales (residential - 52.5%, commercial - 15.5% and industrial - 7.1%) primarily resulted from decreased customer shopping. The decreased shopping resulted from certain alternative energy suppliers terminating their supply arrangements with TE's shopping customers in the first quarter of 2006. Generation services provided by alternative suppliers as a percentage of total sales delivered in TE's franchise area decreased in all customer classes by: residential - 34.4 percentage points, commercial - 11.4 percentage points and industrial - 2 percentage points.

In the first six months of 2006, retail generation revenues increased from the corresponding period of 2005 for the reasons described above. The decreased customer shopping resulted in generation KWH sales increases in all customer classes (residential - 44.1%, commercial - 13.6% and industrial - 3.8%). Similar to the second quarter of 2006, generation services provided by alternative suppliers as a percentage of total sales deliveries in TE's franchise area decreased in all customer classes by: residential - 29 percentage points, commercial - 10 percentage points and industrial - 1.7 percentage points.

Lower wholesale revenues in the second quarter and first six months of 2006 reflected decreased revenues from non-affiliates ($5 million and $8 million, respectively) and decreased revenues from associated companies ($9 million and $11 million, respectively). The non-affiliated wholesale revenue decreases in 2006 were primarily due to the cessation of the MSG sales arrangements under TE’s transition plan in December 2005. TE had been required to provide the MSG to non-affiliated alternative suppliers. The lower wholesale revenues from associated companies in 2006 reflected lower unit prices due to this year’s absence of expenses related to the Beaver Valley Unit 2 nuclear refueling outage in April 2005, which were included as a component of the associated company billing for the 2005 period.

Changes in distribution KWH deliveries and revenues in the second quarter and first six months of 2006 from the corresponding periods of 2005 are summarized in the following table.


Changes in Distribution KWH Deliveries
 
Three Months
 
Six Months
 
Increase (Decrease)
 
 
 
 
 
Distribution Deliveries:
 
 
 
 
 
 
 
Residential
 
 
(6.6
)%
 
(3.8
)%
Commercial
 
 
(5.1
)%
 
(4.4
)%
Industrial
 
 
4.9
%
 
1.9
%
Net Decrease in Distribution Deliveries
 
 
(0.5
)%
 
(1.2
)%


109



 
Changes in Distribution Revenues
 
Three Months
 
Six Months
Increase (Decrease)
 
(In millions)
Residential
 
$
(14
)
$
(25
)
Commercial
 
 
(16
)
 
(29
)
Industrial
 
 
(4
)
 
(5
)
Net Decrease in Distribution Revenues
 
$
(34
)
$
(59
)
 
The distribution revenue decreases as shown in the table above in the second quarter and first six months of 2006 compared to the same periods of 2005 primarily reflected lower unit prices in all customer sectors and decreased KWH deliveries to residential and commercial customers. The lower unit prices reflected the completion of the generation-related transition cost recovery under TE’s transition plan in 2005, partially offset by increased transmission rates to recover MISO costs beginning in the first quarter of 2006 (see Outlook - Regulatory Matters). The lower KWH distribution deliveries to residential and commercial customers in both periods reflected the impact of milder weather in the second quarter and the first six months of 2006 compared to the same periods of 2005. KWH deliveries to industrial customers increased in both periods of 2006 due to increased sales to automotive, oil refinery and steel industry customers.

Under the Ohio transition plan, TE had provided incentives to customers to encourage switching to alternative energy providers which reduced TE's revenues. These revenue reductions, which were deferred for future recovery and did not affect current period earnings, ceased in 2006 thereby increasing revenues in the second quarter and first six months of 2006 by $9 million and $15 million, respectively. The deferred shopping incentives (Extended RTC) are currently being recovered under the RCP (see Outlook - Regulatory Matters).

Expenses

Total expenses decreased by $48 million and $114 million in the second quarter and the first six months of 2006, respectively, from the same periods of 2005 principally due to the generation asset transfer effects as shown in the table above. Excluding the asset transfer effects, the following table presents changes from the prior year by expense category:

Expenses - Changes
 
Three Months
 
Six Months
 
Increase (Decrease) 
 
(In millions)
 
Fuel
 
$
-
 
$
1
 
Purchased power costs
 
 
8
 
 
4
 
Nuclear operating costs
 
 
(6
)
 
(9
)
Other operating costs
 
 
(1
)
 
4
 
Provision for depreciation
 
 
-
 
 
2
 
Amortization of regulatory assets
 
 
(11
)
 
(21
)
Deferral of new regulatory assets
 
 
(2
)
 
(6
)
Net decrease in expenses
 
$
(12
)
$
(25
)
 
 
 
 
 
 
 
 

Higher purchased power costs in the second quarter of 2006 compared to the second quarter of 2005 primarily reflected an increase in KWH purchased to meet the higher retail generation sales requirements and higher unit prices associated with the new power supply agreement with FES. Decreased nuclear operating costs in the 2006 quarter were due to lower costs associated with TE’s leasehold interest in Beaver Valley Unit 2. The decrease reflected the absence in 2006 of expenses in the second quarter of 2005 related to Beaver Valley Unit 2’s 25-day nuclear refueling outage in April 2005.

Higher purchased power costs in the first six months of 2006 compared to the same period of 2005 reflected an increase in KWH purchased to meet higher retail generation sales requirements, partially offset by lower unit prices. The nuclear operating costs decrease in the first six months of 2006 was due to the reasons described above for the second quarter. Higher other operating costs reflect increased transmission expenses, primarily related to MISO Day 2 operations that began on April 1, 2005.

Excluding the effects of the generation asset transfers, depreciation charges in the first six months of 2006 increased due to distribution plant additions.

110



Lower amortization of regulatory assets in both periods of 2006 reflected the completion of generation-related transition cost recovery under TE’s transition plan, partially offset by the amortization of deferred MISO costs that are being recovered in 2006. The net change in deferrals of new regulatory assets in the second quarter and first six months of 2006 primarily resulted from the deferrals of distribution costs ($7 million and $13 million in the second quarter and the first six months of 2006, respectively) and incremental fuel costs ($4 million and $7 million in the second quarter and the first six months of 2006, respectively) that began in 2006 under the RCP, partially offset by the impact of the termination of shopping incentive deferrals in 2006 ($9 million and $16 million in the second quarter and the first six months of 2006, respectively).
 
Other Income

Other income increased $5 million in the first six months of 2006 compared to the same period of 2005, primarily due to the effects of the generation asset transfers. Excluding the asset transfer effects, the $1 million increase reflected lower net interest charges and the absence of a charge of $1.6 million for an NRC fine related to Davis-Besse Plant in the first quarter of 2005, partially offset by the absence of interest income on a note from FGCO, which had a balloon repayment in May 2005.
 
Income Taxes

Income taxes decreased $10 million in the second quarter of 2006 and increased by $8 million in the first six months of 2006 compared to the same periods of 2005. Excluding the effects of the generation asset transfer, income taxes decreased in the second quarter and first six months of 2006 by $11 million and $6 million, respectively. These decreases were primarily due to the absence in 2006 of $17.5 million of additional income tax expenses from the implementation of Ohio tax legislation changes in the second quarter of 2005 and the subsequent reduction in the tax rates, partially offset by the effect of increases in taxable income.

Preferred Stock Dividend Requirements

Lower preferred stock dividend requirements in the second quarter and first six months of 2006 compared to the corresponding 2005 periods were the result of $60 million of optional preferred stock redemptions subsequent to the end of the second quarter of 2005.

Capital Resources and Liquidity

During 2006, TE expects to meet its contractual obligations with a combination of cash from operations and short-term credit arrangements. In connection with a plan to realign its capital structure, TE may issue up to $300 million of new long-term debt in 2006 with proceeds expected to fund a return of equity capital to FirstEnergy.

Changes in Cash Position

As of June 30, 2006, TE had $23,000 of cash and cash equivalents, compared with $15,000 as of December 31, 2005. The major changes in these balances are summarized below.

Cash Flows From Operating Activities

Cash provided from operating activities during the first six months of 2006, compared with the first six months of 2005, were as follows:


 
 
Six Months Ended
 
 
 
June 30,
 
Operating Cash Flows
 
2006
 
2005
 
 
 
(In millions)
 
Cash earnings*
 
$
34
 
$
56
 
Working capital and other
 
 
(30
)
 
(28
Net cash provided from operating activities
 
$
4
 
$
28
 
 
 
 
 
 
 
 
 
 *Cash earnings are a non-GAAP measure (see reconciliation below).
 

 

111


Cash earnings (in the table above) are not a measure of performance calculated in accordance with GAAP. TE believes that cash earnings are a useful financial measure because it provides investors and management with an additional means of evaluating its cash-based operating performance. The following table reconciles cash earnings with net income:
 
   
Six Months Ended
June 30,
 
Reconciliation of Cash Earnings
 
2006
 
2005
 
   
(In millions)
 
Net Income (GAAP)
 
$
61
 
$
8
 
Non-Cash Charges (Credits):
             
Provision for depreciation
   
16
   
30
 
Amortization of regulatory assets
   
47
   
68
 
Deferral of new regulatory assets
   
(28
)
 
(22
)
Nuclear fuel and capital lease amortization
   
-
   
8
 
Amortization of electric service obligation
   
(4
)
 
(1
)
Deferred rents and lease market valuation liability
   
(46
)
 
(44
)
Deferred income taxes and investment tax credits, net
   
(13
)
 
8
 
Accrued compensation and retirement benefits
   
1
   
1
 
Cash earnings (Non-GAAP)
 
$
34
 
$
56
 

Net cash provided from operating activities decreased by $24 million in the first six months of 2006 from the first six months of 2005 as a result of a $22 million decrease in cash earnings described above under “Results of Operations” and a $2 million decrease from working capital and other changes. The decrease in working capital and other primarily resulted from the absence in 2006 of funds received in 2005 for a prepaid electric service program and a reduction in cash received from the settlement of receivables, partially offset by lower cash payments on accounts payable.

Cash Flows From Financing Activities

Net cash used for financing activities decreased to $39 million in the first six months of 2006 from $113 million in the same period of 2005. The decrease resulted primarily from a $168 million increase in net short-term borrowings, partially offset by an $82 million net increase in preferred stock and long-term debt redemptions and a $15 million increase in common stock dividend payments to FirstEnergy in 2006.
 
                   TE had $46 million of cash and temporary investments (which included short-term notes receivable from associated companies) and $137 million of short-term indebtedness as of June 30, 2006. TE has authorization from the PUCO to incur short-term debt of up to $500 million through the bank facility and utility money pool described below. As of June 30, 2006, TE had the capability to issue $634 million of additional FMB on the basis of property additions and retired bonds under the terms of its mortgage indenture. Based upon applicable earnings coverage tests, TE could issue up to $1.1 billion of preferred stock (assuming no additional debt) was issued as of June 30, 2006.
 
                  TE, FirstEnergy, OE, Penn, CEI, JCP&L, Met-Ed, Penelec, FES and ATSI, as Borrowers, have entered into a syndicated $2 billion five-year revolving credit facility with a syndicate of banks that expires in June 2010. Borrowings under the facility are available to each Borrower separately and mature on the earlier of 364 days from the date of borrowing or the commitment expiration date, as the same may be extended. TE’s borrowing limit under the facility is $250 million subject to applicable regulatory approval.
 
                   Under the revolving credit facility, borrowers may request the issuance of letters of credit expiring up to one year from the date of issuance. The stated amount of outstanding letters of credit will count against total commitments available under the facility and against the applicable borrower’s borrowing sub-limit.
 
                   The revolving credit facility contains financial covenants requiring each borrower to maintain a consolidated debt to total capitalization ratio of no more than 65%. As of June 30, 2006, TE's debt to total capitalization, as defined under the revolving credit facility, was 28%.
 
                   The facility does not contain any provisions that either restrict TE's ability to borrow or accelerate repayment of outstanding advances as a result of any change in its credit ratings. Pricing is defined in “pricing grids”, whereby the cost of funds borrowed under the facility is related to TE's credit ratings.

TE has the ability to borrow from its regulated affiliates and FirstEnergy to meet its short-term working capital requirements. FESC administers this money pool and tracks surplus funds of FirstEnergy and its regulated subsidiaries. Companies receiving a loan under the money pool agreements must repay the principal, together with accrued interest, within 364 days of borrowing the funds. The rate of interest is the same for each company receiving a loan from the pool and is based on the average cost of funds available through the pool. The average interest rate for borrowings in the first six months of 2006 was 4.86%.

112


TE’s access to the capital markets and the costs of financing are dependent on the ratings of its securities and the securities of FirstEnergy. The ratings outlook from S&P on all securities is stable. The ratings outlook from Moody’s and Fitch on all securities is positive.
 
                   In April 2006, pollution control notes that were formerly obligations of TE were refinanced and became obligations of FGCO and NGC. The proceeds from the refinancings were used to repay a portion of their associated company notes payable to TE. With those repayments, TE redeemed pollution control notes in the aggregate principal amount of $54 million having variable interest rates.

Cash Flows From Investing Activities
 
                   Net cash provided from investing activities decreased by $50 million in the first six months of 2006 from the same period of 2005 primarily due to a decrease in the collection of principal on long-term notes receivable. This resulted from the receipt in April 2006 of $54 million from FGCO and NGC following the pollution control notes refinancing discussed above as compared to the receipt in May 2005 of a $123 million balloon payment from FGCO for gas-fired combustion turbines sold in 2001. This decrease in cash receipts was partially offset by reduced property additions and net activity for the nuclear decommissioning trust funds due to the generation asset transfers.
 
                   TE’s capital spending for the last half of 2006 is expected to be approximately $29 million. These cash requirements are expected to be satisfied from a combination of internal cash and short-term credit arrangements. TE’s capital spending for the period 2006-2010 is expected to be approximately $232 million, of which approximately $58 million applies to 2006.

Off-Balance Sheet Arrangements

Obligations not included on TE’s Consolidated Balance Sheet primarily consist of sale and leaseback arrangements involving the Bruce Mansfield Plant and Beaver Valley Unit 2. As of June 30, 2006, the present value of these operating lease commitments, net of trust investments, totaled $498 million.

Outlook
 
                   The electric industry continues to transition to a more competitive environment and all of TE’s customers can select alternative energy suppliers. TE continues to deliver power to residential homes and businesses through its existing distribution system, which remains regulated. Customer rates have been restructured into separate components to support customer choice. TE has a continuing responsibility to provide power to those customers not choosing to receive power from an alternative energy supplier subject to certain limits.

Regulatory Matters
 
                    Regulatory assets are costs which have been authorized by the PUCO and the FERC for recovery from customers in future periods or for which authorization is probable. Without the probability of such authorization, costs currently recorded as regulatory assets would have been charged to income as incurred. All regulatory assets are expected to be recovered under the provisions of TE’s regulatory plans. TE’s regulatory assets as of June 30, 2006 and December 31, 2005 were $267 million and $287 million, respectively.

113



On October 21, 2003 the Ohio Companies filed their RSP case with the PUCO. On August 5, 2004, the Ohio Companies accepted the RSP as modified and approved by the PUCO in an August 4, 2004 Entry on Rehearing, subject to a CBP. The RSP was intended to establish generation service rates beginning January 1, 2006, in response to the PUCO’s concerns about price and supply uncertainty following the end of the Ohio Companies' transition plan market development period. In October 2004, the OCC and NOAC filed appeals with the Supreme Court of Ohio to overturn the original June 9, 2004 PUCO order in the proceeding as well as the associated entries on rehearing. On September 28, 2005, the Supreme Court of Ohio heard oral arguments on the appeals. On May 3, 2006, the Supreme Court of Ohio issued an opinion affirming the PUCO's order with respect to the approval of the rate stabilization charge, approval of the shopping credits, the granting of interest on shopping credit incentive deferral amounts, and approval of the Ohio Companies’ financial separation plan. It remanded one matter back to the PUCO for further consideration of the issue as to whether the RSP, as adopted by the PUCO, provided for sufficient means for customer participation in the competitive marketplace. On May 12, 2006, the Ohio Companies filed a Motion for Reconsideration with the Supreme Court of Ohio which was denied by the Court on June 21, 2006. The RSP contained a provision that permitted the Ohio Companies to withdraw and terminate the RSP in the event that the PUCO, or the Supreme Court of Ohio, rejected all or part of the RSP. In such event, the Ohio Companies have 30 days from the final order or decision to provide notice of termination. On July 20, 2006 the Ohio Companies filed with the PUCO a Request to Initiate a Proceeding on Remand. In their Request, the Ohio Companies provided notice of termination to those provisions of the RSP subject to termination, subject to being withdrawn, and also set forth a framework for addressing the Supreme Court of Ohio’s findings on customer participation, requesting the PUCO to initiate a proceeding to consider the Ohio Companies’ proposal. If the PUCO approves a resolution to the issues raised by the Supreme Court of Ohio that is acceptable to the Ohio Companies, the Ohio Companies’ termination will be withdrawn and considered to be null and void. Separately, the OCC and NOAC also submitted to the PUCO on July 20, 2006 a conceptual proposal dealing with the issue raised by the Supreme Court of Ohio. On July 26, 2006, the PUCO issued an Entry acknowledging the July 20, 2006 filings of the Ohio Companies and the OCC and NOAC, and giving the Ohio Companies 45 days to file a plan in a new docket to address the Court’s concern.
 
                   The Ohio Companies filed an application and stipulation with the PUCO on September 9, 2005 seeking approval of the RCP. On November 4, 2005, the Ohio Companies filed a supplemental stipulation with the PUCO, which constituted an additional component of the RCP filed on September 9, 2005. Major provisions of the RCP include:

 
·    
Maintaining the existing level of base distribution rates through December 31, 2008 for TE;

 
·    
Deferring and capitalizing for future recovery (over a 25-year period) with carrying charges certain distribution costs to be incurred by all the Ohio Companies during the period January 1, 2006 through December 31, 2008, not to exceed $150 million in each of the three years;

 
·    
Adjusting the RTC and extended RTC recovery periods and rate levels so that full recovery of authorized costs will occur as of December 31, 2008 for TE;

 
·    
Reducing the deferred shopping incentive balances as of January 1, 2006 by up to $45 million for TE by accelerating the application of its accumulated cost of removal regulatory liability; and

 
·    
Recovering increased fuel costs (compared to a 2002 baseline) of up to $75 million, $77 million, and $79 million, in 2006, 2007, and 2008, respectively, from all OE and TE distribution and transmission customers through a fuel recovery mechanism. OE, TE, and CEI may defer and capitalize (for recovery over a 25-year period) increased fuel costs above the amount collected through the fuel recovery mechanism.
 
                   The following table provides TE’s estimated amortization of regulatory transition costs and deferred shopping incentives (including associated carrying charges) under the RCP for the period 2006 through 2008:

Amortization
Period
 
Amortization
 
   
(In millions)
 
2006
 
$
86
 
2007
 
 
90
 
2008
 
 
111
 
Total Amortization
 
$
287
 

 

114


 
                   On January 4, 2006, the PUCO approved, with modifications, the Ohio Companies’ RCP to supplement the RSP to provide customers with more certain rate levels than otherwise available under the RSP during the plan period. On January 10, 2006, the Ohio Companies filed a Motion for Clarification of the PUCO order approving the RCP. The Ohio Companies sought clarity on issues related to distribution deferrals, including requirements of the review process, timing for recognizing certain deferrals and definitions of the types of qualified expenditures. The Ohio Companies also sought confirmation that the list of deferrable distribution expenditures originally included in the revised stipulation fall within the PUCO order definition of qualified expenditures. On January 25, 2006, the PUCO issued an Entry on Rehearing granting in part, and denying in part, the Ohio Companies’ previous requests and clarifying issues referred to above. The PUCO granted the Ohio Companies’ requests to:

 
·
Recognize fuel and distribution deferrals commencing January 1, 2006;
     
 
·
Recognize distribution deferrals on a monthly basis prior to review by the PUCO Staff;
     
 
·
Clarify that the types of distribution expenditures included in the Supplemental Stipulation may be deferred; and
     
 
·
Clarify that distribution expenditures do not have to be “accelerated” in order to be deferred.
 
 
               The PUCO approved the Ohio Companies’ methodology for determining distribution deferral amounts, but denied the Motion in that the PUCO Staff must verify the level of distribution expenditures contained in current rates, as opposed to simply accepting the amounts contained in the Ohio Companies’ Motion. On February 3, 2006, several other parties filed applications for rehearing on the PUCO's January 4, 2006 Order. The Ohio Companies responded to the applications for rehearing on February 13, 2006. In an Entry on Rehearing issued by the PUCO on March 1, 2006, all motions for rehearing were denied. Certain of these parties have subsequently filed their notices of appeal with the Supreme Court of Ohio alleging various errors made by the PUCO in its order approving the RCP. The Ohio Companies’ Motion to Intervene in the appeals was granted by the Supreme Court on June 8, 2006. The Appellant’s Merit Briefs were filed at the Supreme Court on July 5, 2006. The Appellees include the PUCO and the Ohio Companies. The Appellees’ Merit Briefs are due on August 4, 2006. Appellent’s Reply Briefs will then be due in August 24, 2006.
 
                    On December 30, 2004, TE filed with the PUCO two applications related to the recovery of transmission and ancillary service related costs. The first application sought recovery of these costs beginning January 1, 2006. TE requested that these costs be recovered through a rider that would be effective on January 1, 2006 and adjusted each July 1 thereafter. The parties reached a settlement agreement that was approved by the PUCO on August 31, 2005. The incremental transmission and ancillary service revenues recovered from January 1 through June 30, 2006 were approximately $6.5 million. That amount included the recovery of a portion of the 2005 deferred MISO expenses as described below. On May 1, 2006, TE filed a modification to the rider to determine revenues ($19 million) from July 2006 through June 2007.

                    The second application sought authority to defer costs associated with transmission and ancillary service related costs incurred during the period from October 1, 2003 through December 31, 2005. On May 18, 2005, the PUCO granted the accounting authority for the Ohio Companies to defer incremental transmission and ancillary service-related charges incurred as a participant in MISO, but only for those costs incurred during the period December 30, 2004 through December 31, 2005. Permission to defer costs incurred prior to December 30, 2004 was denied. The PUCO also authorized the Ohio Companies to accrue carrying charges on the deferred balances. On August 31, 2005, the OCC appealed the PUCO's decision. On January 20, 2006, the OCC sought rehearing of the PUCO approval of the recovery of deferred costs through the rider during the period January 1, 2006 through June 30, 2006. The PUCO denied the OCC's application on February 6, 2006. On March 23, 2006, the OCC appealed the PUCO's order to the Ohio Supreme Court. On March 27, 2006, the OCC filed a motion to consolidate this appeal with the deferral appeals discussed above and to postpone oral arguments in the deferral appeal until after all briefs are filed in this most recent appeal of the rider recovery mechanism. On March 20, 2006, the Ohio Supreme Court, on its own motion, consolidated the OCC's appeal of the Ohio Companies' case with a similar case involving Dayton Power & Light Company. Oral arguments were heard on May 10, 2006. The Ohio Companies are unable to predict when a decision may be issued.

                    On November 1, 2005, FES filed two power sales agreements for approval with the FERC. One power sales agreement provided for FES to provide the PLR requirements of the Ohio Companies at a price equal to the retail generation rates approved by the PUCO for a period of three years beginning January 1, 2006. The Ohio Companies will be relieved of their obligation to obtain PLR power requirements from FES if the Ohio CBP results in a lower price for retail customers.

115


                    On December 29, 2005, the FERC issued an order setting the two power sales agreements for hearing. The order criticized the Ohio CBP, and required FES to submit additional evidence in support of the reasonableness of the prices charged in the power sales agreements. A pre-hearing conference was held on January 18, 2006 to determine the hearing schedule in this case. Under upon the procedural schedule, approved in the case, FES expected an initial decision to be issued inin late January 2007. However, on July 14, 2006, the Chief Judge granted the joint motion of FES and the Trial Staff to appoint a settlement judge in this proceeding. The procedural schedule has been suspended pending negotiations among the parties.
 
                     See Note 11 to the consolidated financial statements for further details and a complete discussion of regulatory matters in Ohio.

Environmental Matters

                    TE accrues environmental liabilities only when it concludes that it is probable that it has an obligation for such costs and can reasonably estimate the amount of such costs. Unasserted claims are reflected in TE’s determination of environmental liabilities and are accrued in the period that they are both probable and reasonably estimable.

Regulation of Hazardous Waste
 
                    TE has been named a PRP at waste disposal sites, which may require cleanup under the Comprehensive Environmental Response, Compensation and Liability Act of 1980. Allegations of disposal of hazardous substances at historical sites and the liability involved are often unsubstantiated and subject to dispute; however, federal law provides that all PRPs for a particular site are liable on a joint and several basis. Therefore, environmental liabilities that are considered probable have been recognized on the Consolidated Balance Sheet as of June 30, 2006, based on estimates of the total costs of cleanup, TE’s proportionate responsibility for such costs and the financial ability of other unaffiliated entities to pay. Included in Other Noncurrent Liabilities are accrued liabilities aggregating approximately $0.2 million as of June 30, 2006.
 
                    See Note 10(B) to the consolidated financial statements for further details and a complete discussion of environmental matters.

Other Legal Proceedings
 
                    There are various lawsuits, claims (including claims for asbestos exposure) and proceedings related to TE’s normal business operations pending against TE. The other potentially material items not otherwise discussed above are described below.

Power Outages and Related Litigation-
 
                    On August 14, 2003, various states and parts of southern Canada experienced widespread power outages. The outages affected approximately 1.4 million customers in FirstEnergy's service area. The U.S. - Canada Power System Outage Task Force’s final report in April 2004 on the outages concluded, among other things, that the problems leading to the outages began in FirstEnergy’s Ohio service area. Specifically, the final report concluded, among other things, that the initiation of the August 14, 2003 power outages resulted from an alleged failure of both FirstEnergy and ECAR to assess and understand perceived inadequacies within the FirstEnergy system; inadequate situational awareness of the developing conditions; and a perceived failure to adequately manage tree growth in certain transmission rights of way. The Task Force also concluded that there was a failure of the interconnected grid's reliability organizations (MISO and PJM) to provide effective real-time diagnostic support. The final report is publicly available through the Department of Energy’s Web site (www.doe.gov). FirstEnergy believes that the final report does not provide a complete and comprehensive picture of the conditions that contributed to the August 14, 2003 power outages and that it does not adequately address the underlying causes of the outages. FirstEnergy remains convinced that the outages cannot be explained by events on any one utility's system. The final report contained 46 “recommendations to prevent or minimize the scope of future blackouts.” Forty-five of those recommendations related to broad industry or policy matters while one, including subparts, related to activities the Task Force recommended be undertaken by FirstEnergy, MISO, PJM, ECAR, and other parties to correct the causes of the August 14, 2003 power outages. FirstEnergy implemented several initiatives, both prior to and since the August 14, 2003 power outages, which were independently verified by NERC as complete in 2004 and were consistent with these and other recommendations and collectively enhance the reliability of its electric system. FirstEnergy’s implementation of these recommendations in 2004 included completion of the Task Force recommendations that were directed toward FirstEnergy. FirstEnergy is also proceeding with the implementation of the recommendations that were to be completed subsequent to 2004 and will continue to periodically assess the FERC-ordered Reliability Study recommendations for forecasted 2009 system conditions, recognizing revised load forecasts and other changing system conditions which may impact the recommendations. Thus far, implementation of the recommendations has not required, nor is expected to require, substantial investment in new or material upgrades to existing equipment. The FERC or other applicable government agencies and reliability coordinators may, however, take a different view as to recommended enhancements or may recommend additional enhancements in the future as the result of adoption of mandatory reliability standards pursuant to the EPACT that could require additional material expenditures.

116


                    FirstEnergy companies also are defending six separate complaint cases before the PUCO relating to the August 14, 2003 power outage. Two cases were originally filed in Ohio State courts but were subsequently dismissed for lack of subject matter jurisdiction and further appeals were unsuccessful. In these cases the individual complainants—three in one case and four in the other—sought to represent others as part of a class action. The PUCO dismissed the class allegations, stating that its rules of practice do not provide for class action complaints. Three other pending PUCO complaint cases were filed by various insurance carriers either in their own name as subrogees or in the name of their insured. In each of these three cases, the carrier seeks reimbursement from various FirstEnergy companies (and, in one case, from PJM, MISO and American Electric Power Company, Inc., as well) for claims paid to insureds for damages allegedly arising as a result of the loss of power on August 14, 2003. The listed insureds in these cases, in many instances, are not customers of any FirstEnergy company. The sixth case involves the claim of a non-customer seeking reimbursement for losses incurred when its store was burglarized on August 14, 2003. FirstEnergy filed a Motion to Dismiss on June 13, 2006. It is currently expected that this case will be summarily dismissed, although the Motion is still pending. On March 7, 2006, the PUCO issued a ruling applicable to all pending cases. Among its various rulings, the PUCO consolidated all of the pending outage cases for hearing; limited the litigation to service-related claims by customers of the Ohio operating companies; dismissed FirstEnergy as a defendant; ruled that the U.S.-Canada Power System Outage Task Force Report was not admissible into evidence; and gave the plaintiffs additional time to amend their complaints to otherwise comply with the PUCO’s underlying order. Also, most complainants, along with the FirstEnergy companies, filed applications for rehearing with the PUCO over various rulings contained in the March 7, 2006 order. On April 26, 2006, the PUCO granted rehearing to allow the insurance company claimants, as insurers, to prosecute their claims in their name so long as they also identify the underlying insured entities and the Ohio utilities that provide their service. The PUCO denied all other motions for rehearing. The plaintiffs in each case have since filed an amended complaint and the named FirstEnergy companies have answered and also have filed a motion to dismiss each action. These motions are pending. Additionally, on June 23, 2006, one of the insurance carrier complainants filed an appeal with the Ohio Supreme Court over the PUCO’s denial of their motion for rehearing on the issue of the admissibility of the Task Force Report and the dismissal of FirstEnergy Corp. as a respondent. Briefing is expected to be completed on this appeal by mid-September. It is unknown when the Supreme Court will rule on the appeal. No estimate of potential liability is available for any of these cases.
 
                    FirstEnergy is vigorously defending these actions, but cannot predict the outcome of any of these proceedings or whether any further regulatory proceedings or legal actions may be initiated against the Companies. Although unable to predict the impact of these proceedings, if FirstEnergy or its subsidiaries were ultimately determined to have legal liability in connection with these proceedings, it could have a material adverse effect on FirstEnergy's or its subsidiaries' financial condition, results of operations and cash flows.

Other Legal Matters
 
                    On October 20, 2004, FirstEnergy was notified by the SEC that the previously disclosed informal inquiry initiated by the SEC's Division of Enforcement in September 2003 relating to the restatements in August 2003 of previously reported results by FirstEnergy and the Ohio Companies, and the Davis-Besse extended outage, have become the subject of a formal order of investigation. The SEC's formal order of investigation also encompasses issues raised during the SEC's examination of FirstEnergy and the Companies under the now repealed PUHCA. Concurrent with this notification, FirstEnergy received a subpoena asking for background documents and documents related to the restatements and Davis-Besse issues. On December 30, 2004, FirstEnergy received a subpoena asking for documents relating to issues raised during the SEC's PUHCA examination. On August 24, 2005, additional information was requested regarding Davis-Besse related disclosures, which FirstEnergy has provided. FirstEnergy has cooperated fully with the informal inquiry and will continue to do so with the formal investigation.
 
                    The City of Huron filed a complaint against OE with the PUCO challenging the ability of electric distribution utilities to collect transition charges from a customer of a newly-formed municipal electric utility. The complaint was filed on May 28, 2003, and OE timely filed its response on June 30, 2003. In a related filing, the Ohio Companies filed for approval with the PUCO of a tariff that would specifically allow the collection of transition charges from customers of municipal electric utilities formed after 1998. Both filings were consolidated for hearing and decision described above. An adverse ruling could negatively affect full recovery of transition charges by the utility. Hearings on the matter were held in August 2005. Initial briefs from all parties were filed on September 22, 2005 and reply briefs were filed on October 14, 2005. On May 10, 2006, the PUCO issued its Opinion and Order dismissing the City’s complaint and approving the related tariffs, thus affirming OE’s entitlement to recovery of its transition charges. The City of Huron filed an application for rehearing of the PUCO’s decision on June 9, 2006 and OE filed a memorandum in opposition to that application on June 19, 2006. The PUCO denied the City’s application for rehearing on June 28, 2006. The City of Huron has 60 days from the denial of rehearing to appeal the PUCO’s decision.
 
                    If it were ultimately determined that FirstEnergy or its subsidiaries have legal liability or are otherwise made subject to liability based on the above matters, it could have  material adverse effect on FirstEnergy's or its subsidiaries' financial condition, results of operations and cash flows.

117


                     See Note 10(C) to the consolidated financial statements for further details and a complete discussion of these and other legal proceedings.

New Accounting Standards and Interpretations

FIN 48 - “Accounting for Uncertainty in Income Taxes - an interpretation of FASB Statement No. 109.”

                    In June 2006, the FASB issued FIN 48 which clarifies the accounting for uncertainty in income taxes recognized in an enterprise’s financial statements in accordance with FASB Statement No. 109, “Accounting for Income Taxes.” This interpretation prescribes a recognition threshold and measurement attribute for the financial statement recognition and measurement of a tax position taken or expected to be taken on a tax return. This interpretation also provides guidance on derecognition, classification, interest, penalties, accounting in interim periods, disclosure and transition. The evaluation of a tax position in accordance with this interpretation will be a two-step process. The first step will determine if it is more likely than not that a tax position will be sustained upon examination and should therefore be recognized. The second step will measure a tax position that meets the more likely than not recognition threshold to determine the amount of benefit to recognize in the financial statements. This interpretation is effective for fiscal years beginning after December 15, 2006. TE is currently evaluating the impact of this Statement.

118

 

PENNSYLVANIA POWER COMPANY
 
                     
CONSOLIDATED STATEMENTS OF INCOME
 
(Unaudited)
 
                     
 
Three Months Ended
 
Six Months Ended
 
 
June 30,
 
June 30,
 
 
2006
 
2005
 
2006
 
2005
 
STATEMENTS OF INCOME
(In thousands)
 
REVENUES
$
80,650
 
$
134,282
 
$
163,369
 
$
268,766
 
                         
EXPENSES:
                       
Fuel
 
-
   
5,526
   
-
   
11,146
 
Purchased power
 
56,513
   
42,726
   
111,269
   
89,706
 
Nuclear operating costs
 
-
   
19,765
   
-
   
39,713
 
Other operating costs
 
14,124
   
16,743
   
28,328
   
29,511
 
Provision for depreciation
 
1,695
   
3,810
   
4,126
   
7,504
 
Amortization of regulatory assets
 
-
   
9,833
   
3,411
   
19,715
 
General taxes
 
5,670
   
6,444
   
11,504
   
12,916
 
Total expenses
 
78,002
   
104,847
   
158,638
   
210,211
 
                         
OPERATING INCOME
 
2,648
   
29,435
   
4,731
   
58,555
 
                         
OTHER INCOME (EXPENSE):
                       
Miscellaneous income
 
3,388
   
924
   
6,851
   
(223
)
Interest expense
 
(1,407
)
 
(2,787
)
 
(5,362
)
 
(5,106
)
Capitalized interest
 
48
   
1,476
   
82
   
2,843
 
Total other income (expense)
 
2,029
   
(387
)
 
1,571
   
(2,486
)
                         
INCOME TAXES
 
1,928
   
13,337
   
2,807
   
25,356
 
                         
                         
NET INCOME
 
2,749
   
15,711
   
3,495
   
30,713
 
                         
PREFERRED STOCK DIVIDEND REQUIREMENTS
 
155
   
738
   
311
   
1,378
 
                         
EARNINGS ON COMMON STOCK
$
2,594
 
$
14,973
 
$
3,184
 
$
29,335
 
                         
The preceding Notes to Consolidated Financial Statements as they relate to Pennsylvania Power Company are an integral part of these statements.
 
 
119

 

PENNSYLVANIA POWER COMPANY
 
           
CONSOLIDATED BALANCE SHEETS
 
(Unaudited)
 
 
June 30,
 
December 31,
 
 
2006
 
2005
 
 
(In thousands)
 
ASSETS
         
CURRENT ASSETS:
         
Cash and cash equivalents
$
38
 
$
24
 
Receivables -
           
Customers (less accumulated provisions of $1,073,000 and $1,087,000,
           
respectively, for uncollectible accounts)
 
38,303
   
44,555
 
Associated companies
 
81,688
   
115,441
 
Other
 
1,332
   
2,889
 
Notes receivable from associated companies
 
1,838
   
1,699
 
Prepayments and other
 
17,728
   
86,995
 
   
140,927
   
251,603
 
UTILITY PLANT:
           
In service
 
365,959
   
359,069
 
Less - Accumulated provision for depreciation
 
131,181
   
129,118
 
   
234,778
   
229,951
 
Construction work in progress-
 
5,457
   
3,775
 
   
240,235
   
233,726
 
OTHER PROPERTY AND INVESTMENTS:
           
Long-term notes receivable from associated companies
 
276,052
   
283,248
 
Other
 
350
   
351
 
   
276,402
   
283,599
 
             
DEFERRED CHARGES AND OTHER ASSETS:
           
Prepaid pension costs
 
43,056
   
42,243
 
Other
 
1,775
   
3,829
 
   
44,831
   
46,072
 
             
 
$
702,395
 
$
815,000
 
LIABILITIES AND CAPITALIZATION
           
CURRENT LIABILITIES:
           
Currently payable long-term debt
$
15,474
 
$
69,524
 
Short-term borrowings -
           
Associated companies
 
2,161
   
12,703
 
Other
 
19,000
   
-
 
Accounts payable -
           
Associated companies
 
20,420
   
73,444
 
Other
 
2,073
   
1,828
 
Accrued taxes
 
23,029
   
28,632
 
Accrued interest
 
1,070
   
1,877
 
Other
 
6,874
   
8,086
 
   
90,101
   
196,094
 
CAPITALIZATION:
           
Common stockholder's equity
           
Common stock, $30 par value, authorized 6,500,000 shares-
           
6,290,000 shares outstanding
 
188,700
   
188,700
 
Other paid in capital
 
71,136
   
71,136
 
Retained earnings
 
40,281
   
37,097
 
Total common stockholder's equity
 
300,117
   
296,933
 
Preferred stock
 
14,105
   
14,105
 
Long-term debt and other long-term obligations
 
123,343
   
130,677
 
   
437,565
   
441,715
 
NONCURRENT LIABILITIES:
           
Accumulated deferred income taxes
 
63,698
   
66,576
 
Retirement benefits
 
46,845
   
45,967
 
Regulatory liabilities
 
58,822
   
58,637
 
Other
 
5,364
   
6,011
 
   
174,729
   
177,191
 
COMMITMENTS AND CONTINGENCIES (Note 10)
           
 
$
702,395
 
$
815,000
 
             
The preceding Notes to Consolidated Financial Statements as they relate to Pennsylvania Power Company are an integral part of these balance sheets.
 
 
120

 

PENNSYLVANIA POWER COMPANY  
 
            
CONSOLIDATED STATEMENTS OF CASH FLOWS  
 
(Unaudited)
               
 
 Six Months Ended
 
 June 30,
 
     
2006
   
2005
 
 
 (In thousands)
 
               
CASH FLOWS FROM OPERATING ACTIVITIES:
             
Net income
 
$
3,495
 
$
30,713
 
Adjustments to reconcile net income to net cash from operating activities -
             
Provision for depreciation
   
4,126
   
7,504
 
Amortization of regulatory assets
   
3,411
   
19,715
 
Nuclear fuel and other amortization
   
-
   
8,278
 
Deferred income taxes and investment tax credits, net
   
(2,383
)
 
(4,955
)
Decrease (increase) in operating assets -
             
Receivables 
   
41,562
   
10,838
 
Materials and supplies 
   
-
   
(806
)
Prepayments and other current assets 
   
69,267
   
(8,260
)
Increase (decrease) in operating liabilities -
             
Accounts payable 
   
(52,779
)
 
(19,895
)
Accrued taxes 
   
(5,602
)
 
12,103
 
Accrued interest 
   
(807
)
 
116
 
Other
   
(3,290
)
 
463
 
 Net cash provided from operating activities
   
57,000
   
55,814
 
               
CASH FLOWS FROM FINANCING ACTIVITIES:
             
New Financing -
             
Short-term borrowings, net 
   
8,458
   
33,745
 
Redemptions and Repayments -
             
Preferred stock 
   
-
   
(37,750
)
Long-term debt 
   
(61,899
)
 
(810
)
Short-term borrowings, net 
   
-
   
-
 
Dividend Payments -
             
Common stock 
   
-
   
(8,000
)
Preferred stock 
   
(311
)
 
(1,378
)
 Net cash used for financing activities
   
(53,752
)
 
(14,193
)
               
CASH FLOWS FROM INVESTING ACTIVITIES:
             
Property additions
   
(10,216
)
 
(41,093
)
Proceeds from nuclear decommissioning trust fund sales
   
-
   
36,995
 
Investments in nuclear decommissioning trust funds
   
-
   
(37,792
)
Loan repayments from associated companies
   
7,057
   
173
 
Other
   
(75
)
 
82
 
 Net cash used for investing activities
   
(3,234
)
 
(41,635
)
               
Net increase (decrease) in cash and cash equivalents
   
14
   
(14
)
Cash and cash equivalents at beginning of period
   
24
   
38
 
Cash and cash equivalents at end of period
 
$
38
 
$
24
 
 
             
The preceding Notes to Consolidated Financial Statements as they relate to Pennsylvania Power Company are an integral part of these statements.

 
121




Report of Independent Registered Public Accounting Firm









To the Stockholder and Board of
Directors of Pennsylvania Power Company:

We have reviewed the accompanying consolidated balance sheet of Pennsylvania Power Company and its subsidiaries as of June 30, 2006, and the related consolidated statement of income for each of the three-month and six-month periods ended June 30, 2006 and 2005 and the consolidated statement of cash flows for the six-month period ended June 30, 2006 and 2005. These interim financial statements are the responsibility of the Company’s management.

We conducted our review in accordance with the standards of the Public Company Accounting Oversight Board (United States). A review of interim financial information consists principally of applying analytical procedures and making inquiries of persons responsible for financial and accounting matters. It is substantially less in scope than an audit conducted in accordance with the standards of the Public Company Accounting Oversight Board, the objective of which is the expression of an opinion regarding the financial statements taken as a whole. Accordingly, we do not express such an opinion.

Based on our review, we are not aware of any material modifications that should be made to the accompanying consolidated interim financial statements for them to be in conformity with accounting principles generally accepted in the United States of America.

We have previously audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated balance sheet as of December 31, 2005, and the related consolidated statements of income, capitalization, common stockholder’s equity, preferred stock, cash flows and taxes for the year then ended (not presented herein), and in our report [which contained references to the Company’s change in its method of accounting for asset retirement obligations as of January 1, 2003 as discussed in Note 2(G) and Note 8 to those consolidated financial statements] dated February 27, 2006, we expressed an unqualified opinion on those consolidated financial statements. In our opinion, the information set forth in the accompanying consolidated balance sheet as of December 31, 2005, is fairly stated in all material respects in relation to the consolidated balance sheet from which it has been derived.




PricewaterhouseCoopers LLP
Cleveland, Ohio
August 4, 2006



122


PENNSYLVANIA POWER COMPANY

MANAGEMENT’S DISCUSSION AND ANALYSIS OF
RESULTS OF OPERATIONS AND FINANCIAL CONDITION


                   Penn is a wholly owned, electric utility subsidiary of OE. Penn conducts business in western Pennsylvania, providing regulated electric distribution services. Penn also provides generation services to those customers electing to retain Penn as their power supplier. Penn's rate restructuring plan and its associated transition charge revenue recovery was completed in 2005. Its power supply requirements are provided by FES - an affiliated company.

FirstEnergy Intra-System Generation Asset Transfers
 
                    In 2005, Penn and the Ohio Companies entered into certain agreements implementing a series of intra-system generation asset transfers that were completed in the fourth quarter of 2005. The asset transfers resulted in the respective undivided ownership interests of the Ohio Companies and Penn in FirstEnergy’s nuclear and non-nuclear generation assets being owned by NGC and FGCO, respectively.
 
                   On October 24, 2005, Penn completed the intra-system transfer of non-nuclear generation assets to FGCO. Prior to the transfer, FGCO, as lessee under a Master Facility Lease with the Ohio Companies and Penn, leased, operated and maintained the non-nuclear generation assets that it now owns. The asset transfers were consummated pursuant to FGCO's purchase option under the Master Facility Lease.
 
                   On December 16, 2005, Penn completed the intra-system transfer of its ownership interests in the nuclear generation assets to NGC through an asset spin-off in the form of a dividend. FENOC continues to operate and maintain the nuclear generation assets.
 
                   These transactions were undertaken pursuant to the Ohio Companies’ and Penn’s restructuring plans that were approved by the PUCO and the PPUC, respectively, under applicable Ohio and Pennsylvania electric utility restructuring legislation. Consistent with the restructuring plans, generation assets that had been owned by the Ohio Companies and Penn were required to be separated from the regulated delivery business of those companies through transfer to a separate corporate entity. The transactions essentially completed the divestitures contemplated by the restructuring plans by transferring the ownership interests to NGC and FGCO without impacting the operation of the plants.
 
                   The transfers will affect Penn’s comparative earnings results with reductions in both revenues and expenses. Revenues are reduced due to the termination of certain arrangements with FES, under which Penn previously sold its nuclear-generated KWH to FES and leased its non-nuclear generation assets to FGCO, a subsidiary of FES. Penn’s expenses are lower due to the nuclear fuel and operating costs assumed by NGC as well as depreciation and property tax expenses assumed by FGCO and NGC related to the transferred generating assets. In addition, Penn receives interest income on associated company notes receivable from the transfer of its generation net assets. FES will continue to provide Penn’s PLR requirements under revised purchased power arrangements during 2006 (see Outlook -- Regulatory Matters).

123

 
                   The effects on Penn’s results of operations in the second quarter and first six months of 2006 compared to the same periods of 2005 from the generation asset transfers are summarized in the following table:

Intra-System Generation Asset Transfers
Income Statement Effects
 
Three Months
   
Six Months
 
Increase (Decrease)
 
(In millions)
 
Revenues:
           
Non-nuclear generating units rent
(a)
 $
(5
 
 $
(10
Nuclear generated KWH sales
(b)
 
 (38
)  
 
 (76
Total - Revenues Effect
   
(43
   
(86
Expenses:
               
Fuel costs - nuclear
(c)
 
(5
)    
(11
Nuclear operating costs
(c)
 
(20
)    
(40
Provision for depreciation
(d)
 
(1
   
(3
General taxes
(e)
 
(1
   
(1
Total - Expenses Effect
   
(27
   
(54
Operating Income Effect
   
(16
   
(32
Other Income:
               
Interest income from notes receivable
(f)
 
2
     
5
Capitalized Interest
(g)
 
(1
 
 
 (3
Total - Other Income Effect
 
 
1
   
 
2
 
Income taxes
(h)
 
(6
)    
(12
Net Income Effect
 
 $
(9
 
 $
 (18
                 
                 
(a) Elimination of non-nuclear generation assets lease to FGCO
(b) Reduction of nuclear generated wholesale KWH sales to FES
(c) Reduction of nuclear fuel and operating costs.
(d) Reduction of depreciation expense and asset retirement obligation accretion related to generation assets.
(e) Reduction of property tax expense on generation assets.
(f) Interest income on associated company notes receivable from the transfer of generation net assets.
(g) Reduction of allowance for borrowed funds used during construction on nuclear capital expenditures.
(h) Income tax effect of the above adjustments.
 
 

Results of Operations

                   Earnings on common stock in the second quarter of 2006 decreased to $2.6 million from $15 million in the second quarter of 2005. During the first six months of 2006 earnings on common stock decreased to $3.2 million from $29 million in the first six months of 2005. The lower earnings resulted principally from the generation asset transfer effects shown in the table above.

Revenues

                   Revenues decreased by $54 million, or 40%, and $105 million, or 39%, in the second quarter of 2006 and the first six months of 2006, respectively, as compared with the same period of 2005, primarily due to the generation asset transfer impact displayed in the table above. Excluding the effects of the asset transfer, revenues decreased by $11 million, or 12% and $19 million, or 11%, in the second quarter and the first six months of 2006, respectively. The decreases in the second quarter and the first half of 2006 resulted from lower distribution revenues ($9 million and $18 million, respectively) primarily reflecting the completion of Penn's generation-related transition cost recovery under Penn’s rate restructuring plan, and lower wholesale revenues ($6 million and $12 million, respectively) resulting from the termination of a wholesale sales agreement with a non-affiliate in December 2005. These decreases were partially offset by an increase in retail generation revenues of $5 million in the second quarter of 2006 and $11 million in the first six months of 2006, primarily from higher composite unit prices associated with a 5% rate increase for generation permitted by the PPUC for all customer classes - total retail generation KWH sales remained substantially unchanged.

                   Lower distribution KWH deliveries to residential and commercial customers in the second quarter and first six months of 2006 reflect the impact of milder weather conditions compared to the same periods of 2005. Higher KWH deliveries to industrial customers in both periods of 2006 are largely due to increased demand from the steel sector.

124



    Changes in distribution deliveries in the second quarter and the first six months of 2006 from the same periods of 2005 are summarized in the following table:

Changes in Distribution Deliveries
 
Three Months
 
Six Months
 
 
Increase (Decrease)
 
 
 
 
 
Distribution Deliveries:
 
 
 
 
 
Residential
 
 
(7.8)
%
 
(4.9)
%
Commercial
 
 
(4.1)
%
 
(2.7)
%
Industrial
 
 
10.3
%
 
7.2
%
Total Distribution Deliveries
   
-
%
 
(0.04)
%
 
 
 
 
 
 
 
 
             
 

Expenses

Total expenses decreased by $27 million in the second quarter and $52 million in the first six months of 2006 from the same periods of 2005 principally due to the generation asset transfer impact as shown previously. Excluding the asset transfer effects, the following presents changes from the prior year by expense category:

Expenses - Changes
 
Three Months
 
Six Months
 
 
 
(In millions)
 
Increase (Decrease)
 
 
 
 
 
Purchased power costs
 
$
14
 
$
21
 
Other operating costs
 
 
(3
 
(1
)
Provision for depreciation
   
(1
 
-
 
Amortization of regulatory assets
 
 
(10
 
(16
) 
General Taxes
   
-
   
(1
)
Net change in expenses
 
$
-
 
$
3
 
               
               

Increased purchased power costs in the second quarter and the first six months of 2006, compared with the same periods of 2005, resulted from higher unit prices associated with a new power supply agreement with FES, partially offset by decreases in KWH purchased due to lower generation sales requirements. Other operating costs decreased primarily due to lower employee benefit costs and a decrease in the use of outside contractors for tree trimming. The provision for depreciation included an immaterial pretax adjustment of $0.7 million ($0.4 million net of tax) applicable to prior periods.

Amortization of regulatory assets was lower in the second quarter and the first six months of 2006 as compared to the same periods of 2005 due to the completion of Penn's rate restructuring plan and related transition cost amortization.

Other Income (Expense)

Investment income increased $2 million in the second quarter and $7 million the first six months of 2006, compared with the same periods of 2005, primarily due to the impact of the generation asset transfer.

Net Interest Charges

Net interest charges were substantially unchanged in the second quarter and increased $3 million in the first six months as compared to the same periods of 2005 primarily due to the reduction of capitalized interest related to the generation asset transfer.

Capital Resources and Liquidity

Penn’s cash requirements in 2006 for expenses, construction expenditures and scheduled debt maturities are expected to be met with a combination of cash from operations and short-term credit arrangements. Available borrowing capacity under credit facilities will be used to manage working capital requirements.

125



Changes in Cash Position

Penn had $38,000 of cash and cash equivalents as of June 30, 2006 compared with $24,000 as of December 31, 2005. The major sources for changes in these balances are summarized below.

Cash Flows From Operating Activities

Net cash provided from operating activities in the first six months of 2006, compared with the corresponding 2005 period, was as follows:

 
 
Six Months Ended
 
 
 
June 30,
 
 Operating Cash Flows
 
2006
 
2005
 
     
(in millions)
 
Cash earnings (*)
 
$
9
 
$
62
 
Working capital and other
 
 
48
 
 
(6
)
Net cash provided from operating activities
 
$
57
 
$
56
 
               
               
(*) Cash earnings are a non-GAAP measure (see reconciliation below).

Cash earnings (in the table above) are not a measure of performance calculated in accordance with GAAP. Penn believes that cash earnings are a useful financial measure because it provides investors and management with an additional means of evaluating its cash-based operating performance. The following table reconciles cash earnings with net income:
 
 
 
   
Six Months Ended
June 30,
 
Reconciliation of Cash Earnings
 
2006
 
2005
 
   
(In millions)
 
Net income (GAAP)
 
$
3
 
$
31
 
Non-cash charges (credits):
             
Provision for depreciation
   
4
   
8
 
Amortization of regulatory assets
   
3
   
20
 
Nuclear fuel and other amortization
   
-
   
8
Deferred income taxes and investment tax credits, net
   
(2
)
 
(5
Other non-cash Items
   
1
   
-
 
Cash earnings (Non-GAAP)
 
$
9
 
$
62
 

 
The $53 million decrease in cash earnings for the first six months of 2006, as compared to the corresponding period of 2005, is described above under “Results of Operations”, and resulted principally from the impact of the generation asset transfer. The $54 million change in working capital was primarily due to increases in cash provided from the settlement of receivables of $31 million and a $78 million change in prepayments and other current assets, principally as a result of the asset transfer discussed above. These variances were partially offset by increased cash outflows from the settlement of accounts payable of $33 million and an $18 million change in accrued taxes.

Cash Flows From Financing Activities

Net cash used for financing activities totaled $54 million in the first six months of 2006, compared with $14 million in the same period of 2005. The $40 million increase resulted from $62 million of long-term debt redemptions in 2006 principally related to the generation asset transfer discussed above and a $25 million decrease in short-term borrowings, partially offset by decreases of $38 million in preferred stock redemptions and reductions of $8 million in common stock dividend payments to OE as compared to the first six months of 2005.

Penn had $2 million of cash and temporary investments (which included short-term notes receivable from associated companies) and $21 million of short-term indebtedness as of June 30, 2006. Penn has authorization from the SEC, continued by FERC rules adopted as a result of EPACT's repeal of PUHCA, to incur short-term debt up to its charter limit of $44 million (including the utility money pool). Penn had the capability to issue $66 million of additional FMB on the basis of property additions and retired bonds as of June 30, 2006. Based upon applicable earnings coverage tests, Penn could issue up to $290 million of preferred stock (assuming no additional debt was issued) as of June 30, 2006.

126



Short-term borrowings outstanding as of June 30, 2006, consisted of $19 million of borrowings from affiliates. Penn Power Funding LLC (Penn Funding), a wholly owned subsidiary of Penn, is a limited liability company whose borrowings are secured by customer accounts receivable purchased from Penn. Penn Funding can borrow up to $25 million under a receivables financing arrangement at rates based on bank commercial paper rates. The financing arrangements require payment of an annual facility fee of 0.125% on the entire finance limit. Penn Funding’s receivables financing agreements expire June 28, 2007. As a separate legal entity with separate creditors, it would have to satisfy its separate obligations to creditors before any of its remaining assets could be made available to Penn.

Penn has the ability to borrow under a syndicated $2 billion five-year revolving credit facility, which expires in June 2010, along with FirstEnergy, OE, CEI, TE, JCP&L, Met-Ed, Penelec, FES, and ATSI. Borrowings under the facility are available to each Borrower separately and will mature on the earlier of 364 days from the date of borrowing or the commitment termination date. Penn's borrowing limit under the facility is $50 million.

Under the revolving credit facility, borrowers may request the issuance of LOC’s expiring up to one year from the date of issuance. The stated amount of outstanding LOC’s will count against total commitments available under the facility and against the applicable borrower’s borrowing sub-limit. Total unused borrowing capability under the existing credit facility and accounts receivable financing facilities totaled $56 million as of June 30, 2006.

The revolving credit facility contains financial covenants requiring each borrower to maintain a consolidated debt to total capitalization ratio of no more than 65%. As of June 30, 2006, Penn's debt to total capitalization as defined under the revolving credit facility was 34%.

The facility does not contain any provisions that either restrict Penn's ability to borrow or accelerate repayment of outstanding advances as a result of any change in its credit ratings. Pricing is defined in “pricing grids”, whereby the cost of funds borrowed under the facility is related to Penn's credit ratings.

Penn has the ability to borrow from its regulated affiliates and FirstEnergy to meet its short-term working capital requirements. FESC administers this money pool and tracks surplus funds of FirstEnergy and its regulated subsidiaries. Companies receiving a loan under the money pool agreements must repay the principal amount, together with accrued interest, within 364 days of borrowing the funds. The rate of interest is the same for each company receiving a loan from the pool and is based on the average cost of funds available through the pool. The average interest rate for borrowings under these arrangements in the first six months of 2006 was 4.86%.

Penn's access to the capital markets and the costs of financing are influenced by the ratings of its securities and the securities of OE and FirstEnergy. The rating outlook from S&P on all securities is stable. Moody's and Fitch's ratings outlook on all securities is positive.
 
                    In the first six months of 2006, pollution control notes that were formerly obligations of Penn were refinanced and became obligations of FGCO and NGC. The proceeds from the refinancings were used to repay a portion of their associated company notes payable to Penn. With those repayments, Penn redeemed pollution control notes in the principal amount of $16.8 million at 5.9%, $12.7 million at 6.15%, $14.25 million at 6%, $10.3 million at 3.61%, and $6.95 million at 5.45%.

Cash Flows From Investing Activities

Net cash used for investing activities totaled $3 million in the first six months of 2006, compared with $42 million in the same period of 2005. The $39 million decrease in the 2006 period reflects a $31 million reduction in property additions, principally as a result of the generation asset transfer discussed above and a $7 million increase in loan repayments from associated companies.

During the last half of 2006, capital requirements for property additions are expected to be approximately $8 million. Penn has sinking fund requirements of approximately $0.5 million for maturing long-term debt during the remainder of 2006. These cash requirements are expected to be satisfied from internal cash and short-term credit arrangements.

Penn’s capital spending for the period 2006-2010 is expected to be approximately $90 million of which approximately $18 million applies to 2006. Penn had no other material obligations as of June 30, 2006 that have not been recognized on its Consolidated Balance Sheet.

127



OUTLOOK

                   The electric industry continues to transition to a more competitive environment and all of Penn’s customers can select alternative energy suppliers. Penn continues to deliver power to residential homes and businesses through its existing distribution system, which remains regulated. Customer rates have been restructured into separate components to support customer choice. Penn has a continuing responsibility to provide power to those customers not choosing to receive power from an alternative energy supplier subject to certain limits.

Regulatory Matters

                    Regulatory assets and liabilities are costs which have been authorized by the PPUC and the FERC for recovery from or credit to customers in future periods and, without such authorization, would have been charged or credited to income when incurred. Penn’s net regulatory liabilities were approximately $59 million as of June 30, 2006 and December 31, 2005, and are included under Noncurrent Liabilities on the Consolidated Balance Sheets.

                   Under Pennsylvania's electric competition law, Penn is required to secure generation supply for customers who do not choose alternative suppliers for their electricity. On October 11, 2005, Penn filed a plan with the PPUC to secure electricity supply for its customers at set rates following the end of its transition period on December 31, 2006. Penn recommended that the RFP process cover the period January 1, 2007 through May 31, 2008. To the extent that an affiliate of Penn supplies a portion of the PLR load included in the RFP, authorization to make the affiliate sale must be obtained from the FERC. Hearings before the PPUC were held on January 10, 2006 with main briefs filed on January 27, 2006 and reply briefs filed on February 3, 2006. On February 16, 2006, the ALJ issued a Recommended Decision to adopt Penn's RFP process with modifications. On April 20, 2006, the PPUC approved the Recommended Decision with additional modifications to use an RFP process to obtain Penn's power supply requirements after 2006 through two separate solicitations. An initial solicitation was held for Penn in May 2006 with all tranches fully subscribed. On June 2, 2006, the PPUC approved the bid results for the first solicitation. On July 18, 2006, the second PLR solicitation was held for Penn. The tranches for the Residential Group and Small Commercial Group were fully subscribed. However, supply was only acquired for three of the five tranches for the Large Commercial Group. On July 20, 2006, the PPUC approved the submissions for the second bid. A residual solicitation is scheduled to be held on August 15, 2006 for the two remaining Large Commercial Group tranches. Acceptance of the winning bids is subject to approval by the PPUC.
   On November 1, 2005, FES filed a power sales agreement for approval with the FERC that would permit Penn to obtain its PLR power requirements from FES at a fixed price equal to the retail generation price during 2006. As discussed above, subsequent to the PPUC’s approval of Penn's plan for the RFP process to obtain its post 2006 power supply requirements, the customer power supply requirements for all of the residential and the small commercial sectors and the majority of the large commercial sector tranches have been fully subscribed and the bids approved by the PPUC. An additional solicitation for the remaining two large commercial sector tranches is scheduled for August 15, 2006.
                 
On May 25, 2006, Penn filed a Petition for Review of the PPUC’s Orders of April 28, 2006 and May 4, 2006, which together decided the issues associated with Penn’s proposed Interim PLR Supply Plan. Penn has asked the Commonwealth Court to review the PPUC’s decision to deny its recovery of certain PLR costs via a reconciliation mechanism and its decision to impose a geographic limitation on the sources of alternative energy credits. On June 7, 2006, the PaDEP filed a Petition for Review appealing the PPUC’s ruling on the method by which alternative energy credits may be acquired and traded. Penn is unable to predict the outcome of this appeal.

See Note 11 to the consolidated financial statements for further details and a complete discussion of regulatory matters in Pennsylvania.

Environmental Matters

                   Penn accrues environmental liabilities when it concludes that it is probable that it has an obligation for such costs and can reasonably estimate the amount of such costs. Unasserted claims are reflected in Penn’s determination of environmental liabilities and are accrued in the period that they are both probable and reasonably estimable.

128



W. H. Sammis Plant

                    In 1999 and 2000, the EPA issued NOV or Compliance Orders to nine utilities alleging violations of the Clean Air Act based on operation and maintenance of 44 power plants, including the W. H. Sammis Plant, which was owned at that time by OE and Penn. In addition, the DOJ filed eight civil complaints against various investor-owned utilities, including a complaint against OE and Penn in the U.S. District Court for the Southern District of Ohio. These cases are referred to as New Source Review cases. On March 18, 2005, OE and Penn announced that they had reached a settlement with the EPA, the DOJ and three states (Connecticut, New Jersey, and New York) that resolved all issues related to the W. H. Sammis Plant New Source Review litigation. This settlement agreement was approved by the Court on July 11, 2005, and requires reductions of NOX and SO2 emissions at the W. H. Sammis Plant and other coal fired plants through the installation of pollution control devices and provides for stipulated penalties for failure to install and operate such pollution controls in accordance with that agreement. Those requirements will be the responsibility of FGCO. The settlement agreement also requires OE and Penn to spend up to $25 million toward environmentally beneficial projects, which include wind energy purchased power agreements over a 20-year term. OE and Penn agreed to pay a civil penalty of $8.5 million. Results for the first quarter of 2005 included the penalties paid by OE and Penn of $7.8 million and $0.7 million, respectively. OE and Penn also recognized liabilities in the first quarter of 2005 of $9.2 million and $0.8 million, respectively, for probable future cash contributions toward environmentally beneficial projects.
 
Other Legal Proceedings

                   There are various lawsuits, claims (including claims for asbestos exposure) and proceedings related to Penn’s normal business operations pending against Penn. The other material items not otherwise discussed above are described below.

Power Outages and Related Litigation

                   On August 14, 2003, various states and parts of southern Canada experienced widespread power outages. The outages affected approximately 1.4 million customers in FirstEnergy's service area. The U.S. - Canada Power System Outage Task Force’s final report in April 2004 on the outages concluded, among other things, that the problems leading to the outages began in FirstEnergy’s Ohio service area. Specifically, the final report concluded, among other things, that the initiation of the August 14, 2003 power outages resulted from an alleged failure of both FirstEnergy and ECAR to assess and understand perceived inadequacies within the FirstEnergy system; inadequate situational awareness of the developing conditions; and a perceived failure to adequately manage tree growth in certain transmission rights of way. The Task Force also concluded that there was a failure of the interconnected grid's reliability organizations (MISO and PJM) to provide effective real-time diagnostic support. The final report is publicly available through the Department of Energy’s Web site (www.doe.gov). FirstEnergy believes that the final report does not provide a complete and comprehensive picture of the conditions that contributed to the August 14, 2003 power outages and that it does not adequately address the underlying causes of the outages. FirstEnergy remains convinced that the outages cannot be explained by events on any one utility's system. The final report contained 46 “recommendations to prevent or minimize the scope of future blackouts.” Forty-five of those recommendations related to broad industry or policy matters while one, including subparts, related to activities the Task Force recommended be undertaken by FirstEnergy, MISO, PJM, ECAR, and other parties to correct the causes of the August 14, 2003 power outages. FirstEnergy implemented several initiatives, both prior to and since the August 14, 2003 power outages, which were independently verified by NERC as complete in 2004 and were consistent with these and other recommendations and collectively enhance the reliability of its electric system. FirstEnergy’s implementation of these recommendations in 2004 included completion of the Task Force recommendations that were directed toward FirstEnergy. FirstEnergy is also proceeding with the implementation of the recommendations that were to be completed subsequent to 2004 and will continue to periodically assess the FERC-ordered Reliability Study recommendations for forecasted 2009 system conditions, recognizing revised load forecasts and other changing system conditions which may impact the recommendations. Thus far, implementation of the recommendations has not required, nor is expected to require, substantial investment in new or material upgrades to existing equipment. The FERC or other applicable government agencies and reliability coordinators may, however, take a different view as to recommended enhancements or may recommend additional enhancements in the future as the result of adoption of mandatory reliability standards pursuant to the EPACT that could require additional material expenditures.

                    FirstEnergy is vigorously defending these actions, but cannot predict the outcome of any of these proceedings or whether any further regulatory proceedings or legal actions may be initiated against the Companies. Although unable to predict the impact of these proceedings, if FirstEnergy or its subsidiaries were ultimately determined to have legal liability in connection with these proceedings, it could have a material adverse effect on FirstEnergy's or its subsidiaries' financial condition, results of operations and cash flows.

129


 
                    See Note 10(C) to the consolidated financial statements for further details and a complete discussion of other legal proceedings.
 
New Accounting Standards and Interpretations

FIN 48 - “Accounting for Uncertainty in Income Taxes - an interpretation of FASB Statement No. 109.”

In June 2006, the FASB issued FIN 48 which clarifies the accounting for uncertainty in income taxes recognized in an enterprise’s financial statements in accordance with FASB Statement No. 109, “Accounting for Income Taxes.” This interpretation prescribes a recognition threshold and measurement attribute for the financial statement recognition and measurement of a tax position taken or expected to be taken on a tax return. This interpretation also provides guidance on derecognition, classification, interest, penalties, accounting in interim periods, disclosure and transition. The evaluation of a tax position in accordance with this interpretation will be a two-step process. The first step will determine if it is more likely than not that a tax position will be sustained upon examination and should therefore be recognized. The second step will measure a tax position that meets the more likely than not recognition threshold to determine the amount of benefit to recognize in the financial statements. This interpretation is effective for fiscal years beginning after December 15, 2006. Penn is currently evaluating the impact of this Statement.


 
130


JERSEY CENTRAL POWER & LIGHT COMPANY        
         
CONSOLIDATED STATEMENTS OF INCOME AND COMPREHENSIVE INCOME        
(Unaudited)        
           
   
Three Months Ended   
 
Six Months Ended   
 
   
June 30,   
 
June 30,   
 
   
2006 
 
2005 
 
2006 
 
2005 
 
        
 Restated
      
 Restated
 
            
STATEMENTS OF INCOME
 
(In thousands)
                       
REVENUES
 
$
611,484
 
$
595,291
 
$
1,187,276
 
$
1,124,383
 
                           
EXPENSES
                         
Purchased power
   
343,045
   
321,393
   
658,755
   
598,525
 
Other operating costs
   
72,105
   
80,239
   
155,133
   
181,306
 
Provision for depreciation
   
20,826
   
19,856
   
41,454
   
40,062
 
Amortization of regulatory assets
   
65,526
   
70,250
   
132,271
   
138,624
 
Deferral of new regulatory assets
   
-
   
(27,765
)
 
-
   
(27,765
)
General taxes
   
14,272
   
14,824
   
30,504
   
30,264
 
Total expenses
   
515,774
   
478,797
   
1,018,117
   
961,016
 
                           
OPERATING INCOME
   
95,710
   
116,494
   
169,159
   
163,367
 
                           
OTHER INCOME (EXPENSE):
                         
Miscellaneous income
   
2,528
   
201
   
6,071
   
487
 
Interest Expense
   
(20,367
)
 
(20,100
)
 
(40,983
)
 
(41,003
)
Capitalized interest
   
1,037
   
437
   
1,929
   
840
 
Total other income (expense)
   
(16,802
)
 
(19,462
)
 
(32,983
)
 
(39,676
)
                           
INCOME TAXES
   
38,632
   
42,729
   
62,190
   
55,939
 
                           
NET INCOME
   
40,276
   
54,303
   
73,986
   
67,752
 
                           
PREFERRED STOCK DIVIDEND REQUIREMENTS
   
125
   
125
   
250
   
250
 
                           
EARNINGS ON COMMON STOCK
 
$
40,151
 
$
54,178
 
$
73,736
 
$
67,502
 
                           
STATEMENTS OF COMPREHENSIVE INCOME
                         
                           
NET INCOME
 
$
40,276
 
$
54,303
 
$
73,986
 
$
67,752
 
                           
OTHER COMPREHENSIVE INCOME:
                         
Unrealized gain on derivative hedges
   
38
   
36
   
107
   
105
 
Income tax expense related to other comprehensive income
   
15
   
15
   
43
   
43
 
Other comprehensive income, net of tax
   
23
   
21
   
64
   
62
 
                           
TOTAL COMPREHENSIVE INCOME
 
$
40,299
 
$
54,324
 
$
74,050
 
$
67,814
 
                           
The preceding Notes to Consolidated Financial Statements as they relate to Jersey Central Power & Light Company are an integral part of these statements.
 
 
131

 
JERSEY CENTRAL POWER & LIGHT COMPANY
 
   
CONSOLIDATED BALANCE SHEETS
 
(Unaudited)
 
   
June 30,
 
December 31,
 
   
2006
 
2005
 
   
(In thousands)
 
ASSETS
           
CURRENT ASSETS:
           
Cash and cash equivalents
 
$
95
 
$
102
 
Receivables-
             
Customers (less accumulated provisions of $3,078,000 and $3,830,000,
             
respectively, for uncollectible accounts)
   
282,352
   
258,077
 
Associated companies
   
142
   
203
 
Other (less accumulated provisions of $206,000 and $204,000,
             
respectively, for uncollectible accounts)
   
41,317
   
41,456
 
Notes receivable - associated companies
   
27,766
   
18,419
 
Materials and supplies, at average cost
   
2,012
   
2,104
 
Prepayments (sales & use, corp. business, TEFA) taxes
   
110,787
   
10,137
 
Prepayments and other
   
5,210
   
6,928
 
     
469,681
   
337,426
 
UTILITY PLANT:
             
In service
   
3,983,859
   
3,902,684
 
Less - Accumulated provision for depreciation
   
1,454,291
   
1,445,718
 
     
2,529,568
   
2,456,966
 
Construction work in progress
   
77,325
   
98,720
 
     
2,606,893
   
2,555,686
 
OTHER PROPERTY AND INVESTMENTS:
             
Nuclear fuel disposal trust
   
165,132
   
164,203
 
Nuclear plant decommissioning trusts
   
149,000
   
145,975
 
Other
   
2,069
   
2,580
 
     
316,201
   
312,758
 
DEFERRED CHARGES AND OTHER ASSETS:
             
Regulatory assets
   
2,121,811
   
2,226,591
 
Goodwill
   
1,978,141
   
1,985,858
 
Prepaid pension costs
   
150,760
   
148,054
 
Other
   
16,410
   
17,733
 
     
4,267,122
   
4,378,236
 
   
$
7,659,897
 
$
7,584,106
 
LIABILITIES AND CAPITALIZATION
             
CURRENT LIABILITIES:
             
Currently payable long-term debt
 
$
57,586
 
$
207,231
 
Notes payable-
             
Associated companies
   
365,164
   
181,346
 
Accounts payable-
             
Associated companies
   
16,425
   
37,955
 
Other
   
194,619
   
149,501
 
Accrued taxes
   
45,295
   
54,356
 
Accrued interest
   
20,278
   
19,916
 
Cash collateral from suppliers
   
32,434
   
141,225
 
Other
   
78,214
   
86,884
 
     
810,015
   
878,414
 
CAPITALIZATION:
             
Common stockholder's equity-
             
Common stock, $10 par value, authorized 16,000,000 shares-
             
15,371,270 shares outstanding
   
153,713
   
153,713
 
Other paid-in capital
   
2,995,542
   
3,003,190
 
Accumulated other comprehensive loss
   
(1,966
)
 
(2,030
)
Retained earnings
   
104,626
   
55,890
 
Total common stockholder's equity
   
3,251,915
   
3,210,763
 
Preferred stock
   
12,649
   
12,649
 
Long-term debt and other long-term obligations
   
1,162,407
   
972,061
 
     
4,426,971
   
4,195,473
 
NONCURRENT LIABILITIES:
             
Power purchase contract loss liability
   
1,122,933
   
1,237,249
 
Accumulated deferred income taxes
   
827,760
   
812,034
 
Nuclear fuel disposal costs
   
179,039
   
175,156
 
Asset retirement obligation
   
81,949
   
79,527
 
Retirement benefits
   
72,520
   
72,454
 
Other
   
138,710
   
133,799
 
     
2,422,911
   
2,510,219
 
COMMITMENTS AND CONTINGENCIES (Note 10)
             
   
$
7,659,897
 
$
7,584,106
 
               
The preceding Notes to Consolidated Financial Statements as they relate to Jersey Central Power & Light Company are an integral part of these balance sheets.
 
 
132

 
JERSEY CENTRAL POWER & LIGHT COMPANY
 
   
CONSOLIDATED STATEMENTS OF CASH FLOWS
 
(Unaudited)
 
   
   
Six Months Ended
 
   
June 30,  
 
   
2006
 
2005
 
       
 Restated
 
   
(In thousands)
 
            
CASH FLOWS FROM OPERATING ACTIVITIES:
          
Net income
 
$
73,986
 
$
67,752
 
Adjustments to reconcile net income to net cash from operating activities -
             
Provision for depreciation
   
41,454
   
40,062
 
Amortization of regulatory assets
   
132,271
   
138,624
 
Deferral of new regulatory assets
   
-
   
(27,765
)
Deferred purchased power and other costs
   
(134,759
)
 
(126,265
)
Deferred income taxes and investment tax credits, net
   
10,942
   
16,426
 
Accrued compensation and retirement benefits
   
(3,436
)
 
(8,029
)
Cash collateral from (returned to) suppliers
   
(108,791
)
 
198
 
Decrease (increase) in operating assets -
             
Receivables
   
(24,074
)
 
14,271
 
Materials and supplies
   
91
   
177
 
Prepayments and other current assets
   
(98,932
)
 
(66,525
)
Increase (decrease) in operating liabilities -
             
Accounts payable
   
23,589
   
32,087
 
Accrued taxes
   
(9,062
)
 
58,139
 
Accrued interest
   
362
   
580
 
Other
   
(1,642
)
 
16,856
 
Net cash provided from (used for) operating activities
   
(98,001
)
 
156,588
 
               
CASH FLOWS FROM FINANCING ACTIVITIES:
             
New Financing-
             
Long-term debt
   
200,003
   
-
 
Short-term borrowings, net
   
183,818
   
30,572
 
Redemptions and Repayments-
             
Long-term debt
   
(157,659
)
 
(63,327
)
Dividend Payments-
             
Common stock
   
(25,000
)
 
(40,000
)
Preferred stock
   
(250
)
 
(250
)
Net cash provided from (used for) financing activities
   
200,912
   
(73,005
)
               
CASH FLOWS FROM INVESTING ACTIVITIES:
             
Property additions
   
(91,101
)
 
(82,661
)
Loan repayments from (loans to) associated companies, net
   
(9,347
)
 
670
 
Proceeds from nuclear decommissioning trust fund sales
   
109,505
   
53,782
 
Investments in nuclear decommissioning trust funds
   
(110,952
)
 
(55,229
)
Other
   
(1,023
)
 
105
 
Net cash used for investing activities
   
(102,918
)
 
(83,333
)
               
Net increase (decrease) in cash and cash equivalents
   
(7
)
 
250
 
Cash and cash equivalents at beginning of period
   
102
   
162
 
Cash and cash equivalents at end of period
 
$
95
 
$
412
 
               
The preceding Notes to Consolidated Financial Statements as they relate to Jersey Central Power & Light Company are an integral part of these statements.
 
 
133


 
 
Report of Independent Registered Public Accounting Firm









To the Stockholder and Board of
Directors of Jersey Central
Power & Light Company:

We have reviewed the accompanying consolidated balance sheet of Jersey Central Power & Light Company and its subsidiaries as of June 30, 2006, and the related consolidated statements of income and comprehensive income for each of the three-month and six-month periods ended June 30, 2006 and 2005 and the consolidated statement of cash flows for the six-month period ended June 30, 2006 and 2005. These interim financial statements are the responsibility of the Company’s management.

We conducted our review in accordance with the standards of the Public Company Accounting Oversight Board (United States). A review of interim financial information consists principally of applying analytical procedures and making inquiries of persons responsible for financial and accounting matters. It is substantially less in scope than an audit conducted in accordance with the standards of the Public Company Accounting Oversight Board, the objective of which is the expression of an opinion regarding the financial statements taken as a whole. Accordingly, we do not express such an opinion.

Based on our review, we are not aware of any material modifications that should be made to the accompanying consolidated interim financial statements for them to be in conformity with accounting principles generally accepted in the United States of America.

We have previously audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated balance sheet as of December 31, 2005, and the related consolidated statements of income, capitalization, common stockholder’s equity, preferred stock, cash flows and taxes for the year then ended (not presented herein), and in our report [which contained references to the Company’s restatement of its previously issued consolidated financial statements for the years ended December 31, 2004 and 2003 as discussed in Note 2(I) to those consolidated financial statements] dated February 27, 2006, we expressed an unqualified opinion on those consolidated financial statements. In our opinion, the information set forth in the accompanying consolidated balance sheet as of December 31, 2005, is fairly stated in all material respects in relation to the consolidated balance sheet from which it has been derived.




PricewaterhouseCoopers LLP
Cleveland, Ohio
August 4, 2006



134


JERSEY CENTRAL POWER & LIGHT COMPANY

MANAGEMENT’S DISCUSSION AND ANALYSIS OF
RESULTS OF OPERATIONS AND FINANCIAL CONDITION


JCP&L is a wholly owned, electric utility subsidiary of FirstEnergy. JCP&L conducts business in New Jersey, providing regulated electric transmission and distribution services. JCP&L also provides generation services to those customers electing to retain JCP&L as their power supplier.

Restatements
 
                    As further discussed in Note 15 to the Consolidated Financial Statements, JCP&L restated its consolidated financial statements for the three months and six months ended June 30, 2005. The revisions are the result of a tax audit from the State of New Jersey, in which JCP&L became aware that the New Jersey Transitional Energy Facilities Assessment is not an allowable deduction for state income tax purposes.

Results of Operations

Earnings on common stock in the second quarter of 2006 decreased to $40.2 million from $54.2 million in 2005. The decrease was principally due to the absence of the deferral of a new regulatory asset in 2005 and increased purchased power costs, partially offset by increased revenues and decreased other operating costs. In the first six months of 2006, earnings on common stock increased to $73.7 million compared to $67.5 million for the same period in 2005. The increase was primarily due to higher revenues and lower other operating costs partially offset by increased purchased power costs and the absence of the regulatory asset deferred in 2005.

Revenues

Revenues increased $16.2 million or 2.7% in the second quarter of 2006 and $62.9 million or 5.6% for the first six months of 2006 compared with the same periods of 2005. The higher revenues in both periods were primarily due to retail generation revenue increases ($28.5 million and $66.3 million in the second quarter and the first six months of 2006, respectively), partially offset by wholesale revenue decreases ($7.6 million in the second quarter and $5.8 million in the first six months of 2006). Distribution revenues declined $1.1 million in the second quarter of 2006 but increased $4.2 million in the first six months of 2006 compared to the same periods of the prior year.

The retail generation revenue increases in both the second quarter and the first six months of 2006 as compared to the previous year were due to higher unit prices resulting from the BGS auctions effective in May 2006 and May 2005, which partially offset declines in retail generation KWH sales. Revenue from residential customers increased $12.7 million and $27.6 million in the second quarter and the first six months of 2006, respectively, as compared to the same periods in 2005. Generation revenue from commercial customers also increased for the same periods by $15.3 million and $36.3 million, respectively. The milder weather in the second quarter and the first six months of 2006 as compared to the previous year (cooling degree days were 3.5% below the previous year and heating degree days were 18.6% below the previous year) resulted in lower KWH sales to residential customers in the second quarter and the first six months of 2006. The milder weather also resulted in overall lower KWH sales to commercial customers in the second quarter and first six months of 2006 - more than offsetting the impact of commercial customers returning to JCP&L from alternative suppliers. Revenues from industrial customers increased $0.3 million and $2.1 million in the second quarter and first six months of 2006, respectively, as compared to the previous year, as a result of higher unit prices offsetting KWH sales decreases in the second quarter and the first six months of 2006. Wholesale sales revenues decreased $7.6 million in the second quarter and $5.8 million for the first six months of 2006 as compared to 2005 as lower unit prices offset KWH sales increases.

The decrease in distribution revenues of $1.1 million in the second quarter of 2006 compared to the same period of 2005 consists of two components, a $1.8 million increase in wires revenue and a $2.9 million reduction in MTC and SBC revenues. The distribution revenue reduction was primarily due to lower KWH throughput partially offset by higher composite unit prices resulting from a distribution rate increase pursuant to the stipulated settlements approved by the NJBPU on May 25, 2005. While distribution KWH deliveries declined for the first six months of 2006 as compared to the previous year, the impact of a full six months of 2006 of the distribution rate increase caused revenues to increase $4.2 million. Wires revenue increased $13.3 million while the MTC and SBC revenues declined $9.1 million. Other revenues declined $3.6 million in the second quarter and $1.8 million in the first six months of 2006 as compared to the comparable periods in 2005 due to reduced transmission revenues.

135



Changes in KWH sales by customer class in the second quarter and the first six months of 2006 compared to the same periods of 2005 are summarized in the following table:

 
 
Three
 
Six
 
Changes in KWH Sales
 
Months
 
Months
 
Increase (Decrease)
 
 
 
 
 
Electric Generation:
 
 
 
 
 
Retail
 
 
(3.3)
%
 
(1.4)
%
Wholesale
 
 
2.2
%
 
1.1 
%
Total Electric Generation Sales
 
 
(2.1)
%
 
(0.9)
%
 
 
 
 
 
 
 
 
Distribution Deliveries:
 
 
 
 
 
 
 
Residential
 
 
(5.3)
%
 
(4.7)
%
Commercial
 
 
(0.3)
%
 
(0.7)
%
Industrial
 
 
(6.5)
%
 
(6.8)
%
Total Distribution Deliveries
 
 
(3.2)
%
 
(3.3)
%
 
 
 
 
 
 
 
 
 
Expenses

Total expenses and taxes increased by $37.1 million in the second quarter and $57.0 million in the first six months of 2006 as compared to the same periods of the prior year. The following table presents changes from the prior year by expense category:

 
 
Three
 
Six
 
Expenses - Changes
 
Months
 
Months
 
 
 
(In millions)
 
Increase (Decrease) 
 
 
 
 
 
Purchased power costs
 
$
21.7
 
$
60.2
 
Other operating costs
 
 
(8.1
)
 
(26.2
)
Provision for depreciation
 
 
1.0
 
 
1.4
 
Amortization of regulatory assets
 
 
(4.7
)
 
(6.4
)
Deferral of new regulatory assets
 
 
27.8
 
 
27.8
 
General Taxes
 
 
(0.6
)
 
0.2
 
Net increase in expenses
 
$
37.1
 
$
57.0
 
 
 
 
 
 
 
 
 

Purchased power costs increased $21.7 million in the second quarter of 2006 and $60.2 million in the first six months compared to the same periods of 2005. The increase reflected higher unit prices resulting from the 2006 and 2005 BGS auctions. The change in the deferral of new regulatory assets of $27.8 million in both periods was due to the absence of a 2005 deferral of reliability expenses reflecting a May 2005 NJBPU rate decision. Other operating costs declined $8.1 million in the second quarter and $26.2 million for the first six months of 2006 due in part to the absence of costs related to the JCP&L labor strike in 2005. Amortization of regulatory assets decreased $4.7 million in the second quarter and $6.4 million in the first six months of 2006 due to a reduction in the level of MTC revenue recovery.

Miscellaneous income increased $2.3 million in the second quarter of 2006 and $5.6 million in the first six months compared to the same periods in 2005. The increases in both periods is attributed to income received from customer requested service projects.

Capital Resources and Liquidity

JCP&L’s cash requirements in 2006 for expenses, construction expenditures and scheduled debt maturities are expected to be met with a combination of cash from operations and funds from the capital markets.
 

Changes in Cash Position

As of June 30, 2006, JCP&L had $95,000 of cash and cash equivalents compared with $102,000 as of December 31, 2005. The major sources for changes in these balances are summarized below.

136



Cash Flows From Operating Activities

Cash provided from operating activities in the first six months of 2006 compared with the first six months of 2005 were as follows:
 

 
 
Six Months Ended
 
 
 
 
June 30,
 
 
 Operating Cash Flows
 
2006
 
2005
 
 
     
(In millions)
   
Cash earnings (1)
 
$
120
 
$
101
 
 
Working capital and other
 
 
(218
)
 
56
 
 
Net cash provided from operating activities
 
$
(98
)
$
157
 
 
 
 
 
 
 
 
 
 
 
(1) Cash earnings are a non-GAAP measure (see reconciliation below). 
 
 
 
 
 
                   Cash earnings (in the table above) are not a measure of performance calculated in accordance with GAAP. JCP&L believes that cash earnings are a useful financial sure because it provides investors and management with an additional means of evaluating its cash-based operating performance. The following table reconciles cash earnings with net income:

 
 
Six Months Ended
 
 
 
June 30,
 
Reconciliation of Cash Earnings 
 
2006
 
2005
 
     
(In millions)
 
Net income (GAAP)
 
$
74
 
$
68
 
Non-cash charges (credits):
 
 
   
 
 
 
Provision for depreciation
 
 
41
 
 
40
 
Amortization of regulatory assets
 
 
132
 
 
139
 
Deferral of new regulatory assets
   
-
   
(28
)
Deferred purchased power and other costs
 
 
(135
)
 
(126
Deferred income taxes
 
 
11
 
 
16
 
Other non-cash items
 
 
(3
)
 
(8
Cash earnings (Non-GAAP)
 
$
120
 
$
101
 
 
 
 
 
 
 
 
 

The $19 million increase in cash earnings is described under “Results of Operations.” The $274 million decrease from working capital changes primarily resulted from a $109 million change in cash collateral from suppliers, changes in prepayments of $32 million, accrued taxes of $67 million and receivables of $38 million. In the year 2005, JCP&L received cash collateral payments from its suppliers of $135 million. During the first six months of 2006, JCP&L returned $109 million back to its suppliers.

Cash Flows From Financing Activities

Net cash provided from financing activities was $201 million in the first six months of 2006 as compared to net cash used of $73 million in same period of 2005. The change resulted from a $200 million issuance of long-term debt, a $153 million increase in short-term borrowings and a $15 million reduction in common stock dividend payments to FirstEnergy, partially offset by $94 million of additional debt redemptions in the first six months of 2006.

JCP&L had $28 million of cash and temporary investments (which includes short-term notes receivable from associated companies) and approximately $365 million of short-term indebtedness as of June 30, 2006. JCP&L has authorization from the SEC, continued by FERC rules adopted as a result of EPACT's repeal of PUHCA, to incur short-term debt up to its charter limit of $412 million (including the utility money pool). JCP&L will not issue FMB other than as collateral for senior notes, since its senior note indenture prohibits (subject to certain exceptions) JCP&L from issuing any debt which is senior to the senior notes. As of June 30, 2006, JCP&L had the capability to issue $610 million of additional senior notes based upon FMB collateral. As of June 30, 2006, based upon applicable earnings coverage tests and its charter, JCP&L could issue $1.3 billion of preferred stock (assuming no additional debt was issued).

JCP&L has the ability to borrow from FirstEnergy and its regulated affiliates to meet its short-term working capital requirements. FESC administers this money pool and tracks surplus funds of FirstEnergy and its regulated subsidiaries. Companies receiving a loan under the money pool agreement must repay the principal, together with accrued interest, within 364 days of borrowing the funds. The rate of interest is the same for each company receiving a loan from the pool and is based on the average cost of funds available through the pool. The average interest rate for borrowings in the first six months of 2006 was 4.86%.

137


JCP&L, FirstEnergy, OE, Penn, CEI, TE, Penelec, Met-Ed, FES and ATSI, as Borrowers, have entered into a syndicated $2 billion five-year revolving credit facility which expires in June 2010. Borrowings under the facility are available to each Borrower separately and mature on the earlier of 364 days from the date of borrowing or the commitment termination date, as the same may be extended. JCP&L's borrowing limit under the facility is $425 million.

Under the revolving credit facility, borrowers may request the issuance of letters of credit expiring up to one year from the date of issuance. The stated amount of outstanding letters of credit will count against total commitments available under the facility and against the applicable borrower’s borrowing sub-limit.

The revolving credit facility contains financial covenants requiring each borrower to maintain a consolidated debt to total capitalization ratio of no more than 65%. As of June 30, 2006, JCP&L's debt to total capitalization as defined under the revolving credit facility was 29%.

The facility does not contain any provisions that either restrict JCP&L's ability to borrow or accelerate repayment of outstanding advances as a result of any change in its credit ratings. Pricing is defined in “pricing grids”, whereby the cost of funds borrowed under the facility is related to its credit ratings.

JCP&L's access to the capital markets and the costs of financing are dependent on the ratings of its securities and that of FirstEnergy. As of June 30, 2006, JCP&L's and FirstEnergy’s ratings outlook from S&P on all securities was stable. The ratings outlook from Moody’s and Fitch on all securities is positive.
 
                   On June 8, 2006, the NJBPU approved JCP&L’s request to issue securitization bonds associated with BGS stranded cost deferrals. On August 4, 2006, JCP&L Transition Funding II, a wholly owned subsidiary of JCP&L, secured pricing on the issuance of $182 million of transition bonds with a weighted average interest rate of 5.5%. As required by the Electric Discount and Energy Competition Act of 1999, as amended. JCP&L will use the proceeds it receives from the issuer principally to reduce stranded costs, including basic generation transition costs, through the retirement of debt, including short-term debt, or equity or both, and also to pay related expenses.

On May 12, 2006, JCP&L issued $200 million of 6.40% secured Senior Notes due 2036. The proceeds of the offering were used to repay at maturity $150 million aggregate principal amount of JCP&L’s 6.45% Senior Notes due May 15, 2006 and for general corporate purposes.

Cash Flows From Investing Activities

Net cash used for investing activities was $103 million in the first six months of 2006 compared to $83 million in the previous year. The $20 million change primarily resulted from increases of $8 million in property additions for distribution system reliability initiatives and $9 million of loans to associated companies.

During the last half of 2006, capital requirements for property additions and improvements are expected to be about $72 million. These cash requirements are expected to be satisfied from a combination of internal cash, funds raised in the long-term debt capital markets and short-term credit arrangements.

JCP&L’s capital spending for the period 2006-2010 is expected to be approximately $912 million for property additions, of which approximately $162 million applies to 2006.

Market Risk Information

JCP&L uses various market risk sensitive instruments, including derivative contracts, primarily to manage the risk of price fluctuations. Its Risk Policy Committee, comprised of members of senior management, provides general management oversight to risk management activities throughout JCP&L. They are responsible for promoting the effective design and implementation of sound risk management programs. They also oversee compliance with corporate risk management policies and established risk management practices.

138


Commodity Price Risk
 
                  JCP&L is exposed to market risk primarily due to fluctuations in electricity, energy transmission and natural gas prices. To manage the volatility relating to these exposures, JCP&L uses a variety of non-derivative and derivative instruments, including forward contracts, options, futures contracts and swaps. The derivatives are used principally for hedging purposes. Derivatives that fall within the scope of SFAS 133 must be recorded at their fair value and marked to market. The majority of JCP&L’s derivative hedging contracts qualify for the normal purchase and normal sale exception under SFAS 133 and are therefore excluded from the table below. Contracts that are not exempt from such treatment include power purchase agreements with NUG entities that were structured pursuant to the Public Utility Regulatory Policy Act of 1978. These non-trading contracts are adjusted to fair value at the end of each quarter, with a corresponding regulatory asset recognized for above-market costs. The changes in the fair value of commodity derivative contracts related to energy production during the second quarter and first six months of 2006 are summarized in the following table:

   
Three Months Ended
 
Six Months Ended
 
Increase (Decrease) in the Fair Value
 
June 30, 2006
 
June 30, 2006
 
of Commodity Derivative Contracts
 
Non-Hedge
 
Hedge
 
Total
 
Non-Hedge
 
Hedge
 
Total
 
 
 
(In millions)
 
Change in the Fair Value of
 
 
 
 
 
 
 
 
 
 
 
 
 
Commodity Derivative Contracts:
 
 
 
 
 
 
 
 
 
 
 
 
 
Outstanding net liability at beginning of period
 
$
(1,173
)
$
-
 
$
(1,173
)
$
(1,223
)
$
-
 
$
(1,223
)
New contract value when entered
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Additions/change in value of existing contracts
 
 
(15
)
 
-
 
 
(15
)
 
(30
)
 
-
 
 
(30
)
Change in techniques/assumptions
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Settled contracts
 
 
76
 
 
-
 
 
76
 
 
141
 
 
-
 
 
141
 
Net Liabilities - Derivative Contracts
at End of Period (1)
 
$
(1,112
)
$
-
 
$
(1,112
)
$
(1,112
)
$
-
 
$
(1,112
)
 
 
 
   
 
   
 
   
 
   
 
   
 
   
Impact of Changes in Commodity Derivative Contracts(2)
 
 
   
 
   
 
   
 
   
 
   
 
   
Income Statement effects (pre-tax)
 
$
(1
)
$
-
 
$
(1
)
$
(1
)
$
-
 
$
(1
)
Balance Sheet effects:
 
 
   
 
   
 
   
 
   
 
   
 
   
Regulatory assets (net)
 
$
(62
)
$
-
 
$
(62
)
$
(112
)
$
-
 
$
(112
)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

(1) Includes $1,112 million of non-hedge commodity derivative contracts (primarily with NUGs), that are offset by a regulatory asset.
(2) Represents the change in value of existing contracts, settled contracts and changes in techniques/assumptions.
 
                   Derivatives are included on the Consolidated Balance Sheet as of June 30, 2006 as follows:

Balance Sheet Classification
 
Non-Hedge
 
Hedge
 
Total
 
   
(In millions)
 
Non-Current-
                   
Other deferred charges
   
11
   
-
   
11
 
Other noncurrent liabilities
   
(1,123
)
 
-
   
(1,123
)
                     
Net liabilities
 
$
(1,112
)
$
-
 
$
(1,112
)

                   The valuation of derivative contracts is based on observable market information to the extent that such information is available. In cases where such information is not available, JCP&L relies on model-based information. The model provides estimates of future regional prices for electricity and an estimate of related price volatility. JCP&L uses these results to develop estimates of fair value for financial reporting purposes and for internal management decision making. Sources of information for the valuation of commodity derivative contracts as of June 30, 2006 are summarized by year in the following table:

Source of Information
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Fair Value by Contract Year
 
2006(1)
 
2007
 
2008
 
2009
 
2010
 
Thereafter
 
Total
 
 
 
(In millions)
 
Other external sources (2)
 
$
(147)
 
 
(257)
 
 
(226)
 
 
 -
 
 
 -
 
 
-
 
 
(630)
 
Prices based on models
 
 
-
 
 
-
 
 
-
 
 
(168)
 
 
(144)
 
 
(170)
 
 
(482)
 
 
 
 
   
 
   
 
   
 
 
 
 
 
 
 
 
 
 
   
Total(3)
 
$
(147)
 
$
(257)
 
$
(226)
 
$
(168)
 
 $
(144)
 
$
(170)
 
$
(1,112)
 

(1) For the last two quarters of 2006.
(2) Broker quote sheets.
(3) Includes $1,112 million of non-hedge commodity derivative contracts (primarily with NUGs), that are offset by a regulatory asset and does not affect earnings.

139


 
                   JCP&L performs sensitivity analyses to estimate its exposure to the market risk of its commodity positions. A hypothetical 10% adverse shift in quoted market prices in the near term on both its trading and non-trading derivative instruments would not have had a material effect on JCP&L’s consolidated financial position or cash flows as of June 30, 2006. JCP&L estimates that if energy commodity prices experienced an adverse 10% change, net income for the next twelve months would not change, as the prices for all commodity positions are already above the contract price caps.

Equity Price Risk

Included in nuclear decommissioning trusts are marketable equity securities carried at their current fair value of approximately $86 million and $84 million as of June 30, 2006 and December 31, 2005, respectively. A hypothetical 10% decrease in prices quoted by stock exchanges would result in a $9 million reduction in fair value as of June 30, 2006.

Regulatory Matters
 
                    Regulatory assets are costs which have been authorized by the NJBPU and the FERC for recovery from customers in future periods or for which authorization is probable. Without the probability of such authorization, costs currently recorded as regulatory assets would have been charged to income as incurred. All of JCP&L’s regulatory assets are expected to continue to be recovered under the provisions of the regulatory proceedings discussed below. JCP&L’s regulatory assets totaled $2.1 billion as of June 30, 2006 and $2.2 billion as of December 31, 2005.
 
                    JCP&L is permitted to defer for future collection from customers the amounts by which its costs of supplying BGS to non-shopping customers and costs incurred under NUG agreements exceed amounts collected through BGS and NUGC rates and market sales of NUG energy and capacity. As of June 30, 2006, the accumulated deferred cost balance totaled approximately $638 million. New Jersey law allows for securitization of JCP&L's deferred balance upon application by JCP&L and a determination by the NJBPU that the conditions of the New Jersey restructuring legislation are met. On February 14, 2003, JCP&L filed for approval to securitize the July 31, 2003 deferred balance. On June 8, 2006, the NJBPU approved JCP&L’s request to issue securitization bonds associated with BGS stranded cost deferrals. On August 4, 2006, JCP&L Transition Funding II, a wholly owned subsidiary of JCP&L, secured pricing on the issuance of $182 million of transition bonds with a weighted average interest rate of 5.5%.
 
                    On December 2, 2005, JCP&L filed a request for recovery of $165 million of actual above-market NUG costs incurred from August 1, 2003 through October 31, 2005 and forecasted above-market NUG costs for November and December 2005. On February 23, 2006, JCP&L filed updated data reflecting actual amounts through December 31, 2005 of $154 million of costs incurred since July 31, 2003. On March 29, 2006, a pre-hearing conference was held with the presiding ALJ. A schedule for the proceeding was established, including a discovery period and evidentiary hearings scheduled for September 2006.
 
                   An NJBPU Decision and Order approving a Phase II Stipulation of Settlement and resolving the Motion for Reconsideration of the Phase I Order was issued on May 31, 2005. The Phase II Settlement includes a performance standard pilot program with potential penalties of up to 0.25% of allowable equity return. The Order requires that JCP&L file quarterly reliability reports (CAIDI and SAIFI information related to the performance pilot program) through December 2006 and updates to reliability related project expenditures until all projects are completed. The last of the quarterly reliability reports was submitted on June 12, 2006. As of June 30, 2006, there were no performance penalties issued by the NJBPU.
 
                    In a reaction to the higher closing prices of the 2006 BGS fixed rate auction, the NJBPU, on March 16, 2006, initiated a generic proceeding to evaluate the auction process and potential options for the future. On April 6, 2006, initial comments were submitted. A public meeting was held on April 21, 2006 and a legislative-type hearing was held on April 28, 2006. On June 21, 2006, the NJBPU approved the continued use of a descending block auction for the Fixed Price Residential Class. A final decision as to the procurement method for the Commercial Industrial Energy Price Class is expected in October 2006.
 
                    In accordance with an April 28, 2004 NJBPU order, JCP&L filed testimony on June 7, 2004 supporting a continuation of the current level and duration of the funding of TMI-2 decommissioning costs by its customers without a reduction, termination or capping of the funding. On September 30, 2004, JCP&L filed an updated TMI-2 decommissioning study. This study resulted in an updated total decommissioning cost estimate of $729 million (in 2003 dollars) compared to the estimated $528 million (in 2003 dollars) from the prior 1995 decommissioning study. The DRA filed comments on February 28, 2005 requesting that decommissioning funding be suspended. On March 18, 2005, JCP&L filed a response to those comments. A schedule for further proceedings has not yet been set.

140

 
On August 1, 2005, the NJBPU established a proceeding to determine whether additional ratepayer protections are required at the state level in light of the repeal of PUHCA pursuant to the EPACT. An NJBPU proposed rulemaking to address the issues was published in the NJ Register on December 19, 2005. The proposal would prevent a holding company that owns a gas or electric public utility from investing more than 25% of the combined assets of its utility and utility-related subsidiaries into businesses unrelated to the utility industry. A public hearing was held on February 7, 2006 and comments were submitted to the NJBPU. The NJBPU Staff issued a draft proposal on March 31, 2006 addressing various issues including access to books and records, ring-fencing, cross subsidization, corporate governance and related matters. With the approval of the NJBPU Staff, the affected utilities jointly submitted an alternative proposal on June 1, 2006. Comments on the alternative proposal were submitted on June 15, 2006. JCP&L is unable to predict the outcome of this proceeding.
 
                   On December 21, 2005, the NJBPU initiated a generic proceeding and requested comments in order to formulate an appropriate regulatory treatment for investment tax credits related to generation assets divested by New Jersey’s four electric utility companies. Comments were filed by the utilities and by the DRA. JCP&L was advised by the IRS on April 10, 2006 that the ruling was tentatively adverse. On April 28, 2006, the NJBPU directed JCP&L to withdraw its request for a private letter ruling on this issue, which had been previously filed with the IRS as ordered by the NJBPU. On May 11, 2006, after a JCP&L Motion for Reconsideration was denied by the NJBPU, JCP&L filed to withdraw the request for a private letter ruling. On July 19, 2006, the IRS acknowledged that the JCP&L ruling request was withdrawn.
 
                   On November 18, 2004, the FERC issued an order eliminating the RTOR for transmission service between the MISO and PJM regions. The FERC also ordered the MISO, PJM and the transmission owners within MISO and PJM to submit compliance filings containing a SECA mechanism to recover lost RTOR revenues during a 16-month transition period from load serving entities. The FERC issued orders in 2005 setting the SECA for hearing. ATSI, JCP&L, Met-Ed, Penelec, and FES continue to be involved in the FERC hearings concerning the calculation and imposition of the SECA charges. The hearing was held in May 2006. Initial briefs were submitted on June 9, 2006 and reply briefs were filed on June 27, 2006. The FERC has ordered the Presiding Judge to issue an initial decision by August 11, 2006.
 
                   On January 31, 2005, certain PJM transmission owners made three filings with the FERC pursuant to a settlement agreement previously approved by the FERC. JCP&L, Met-Ed and Penelec were parties to that proceeding and joined in two of the filings. In the first filing, the settling transmission owners submitted a filing justifying continuation of their existing rate design within the PJM RTO. In the second filing, the settling transmission owners proposed a revised Schedule 12 to the PJM tariff designed to harmonize the rate treatment of new and existing transmission facilities. Interventions and protests were filed on February 22, 2005. In the third filing, Baltimore Gas and Electric Company and Pepco Holdings, Inc. requested a formula rate for transmission service provided within their respective zones. On May 31, 2005, the FERC issued an order on these cases. First, it set for hearing the existing rate design and indicated that it will issue a final order within six months. American Electric Power Company, Inc. filed in opposition proposing to create a "postage stamp" rate for high voltage transmission facilities across PJM. Second, the FERC approved the proposed Schedule 12 rate harmonization. Third, the FERC accepted the proposed formula rate, subject to refund and hearing procedures. On June 30, 2005, the settling PJM transmission owners filed a request for rehearing of the May 31, 2005 order. On March 20, 2006, a settlement was filed with FERC in the formula rate proceeding that generally accepts the companies' formula rate proposal. The FERC issued an order approving this settlement on April 19, 2006. Hearings in the PJM rate design case concluded in April 2006. On July 13, 2006, an Initial Decision was issued by the ALJ. The ALJ adopted the Trial Staff’s position that the cost of all PJM transmission facilities should be recovered through a postage stamp rate. The ALJ recommended an April 1, 2006 effective date for this change in rate design. If the FERC accepts this recommendation, the transmission rate applicable to many load zones in PJM would increase. FirstEnergy believes that significant additional transmission revenues would have to be recovered from the JCP&L, Met-Ed and Penelec transmission zones within PJM. The Companies, as part of the Responsible Pricing Alliance, intend to submit a brief on exceptions within thirty days of the initial decision. Following submission of reply exceptions, the case is expected to be reviewed by the FERC with a decision anticipated in the fourth quarter of 2006.
 
                   See Note 11 to the consolidated financial statements for further details and a complete discussion of regulatory matters in New Jersey.

Environmental Matters
 
                    JCP&L accrues environmental liabilities when it concludes that it is probable that it has an obligation for such costs and can reasonably determine the amount of such costs. Unasserted claims are reflected in JCP&L’s determination of environmental liabilities and are accrued in the period that they are both probable and reasonably estimable.

141

 
                   JCP&L has been named as a PRP at waste disposal sites which may require cleanup under the Comprehensive Environmental Responsive, Comprehension and Liability Act of 1980. Allegations of disposal of hazardous substances at historical sites and the liability involved are often unsubstantiated and subject to dispute; however, federal law provides that PRPs for a particular site are held liable on a joint and several basis. Therefore, environmental liabilities that are considered probable have been recognized on the Consolidated Balance Sheet as of June 30, 2006, based on estimates of the total costs of cleanup, JCP&L’s proportionate responsibility for such costs and the financial ability of other unaffiliated entities to pay. In addition, JCP&L has accrued liabilities for environmental remediation of former manufactured gas plants in New Jersey; those costs are being recovered by JCP&L through a non-bypassable SBC. Total liabilities of approximately $54.7 million have been accrued through June 30, 2006.

See Note 10(B) to the consolidated financial statements for further details and a complete discussion of environmental matters.

Other Legal Proceedings
 
                   There are various lawsuits, claims (including claims for asbestos exposure) and proceedings related to JCP&L's normal business operations pending against JCP&L. The other material items not otherwise discussed below are described in Note 10(C) to the consolidated financial statements.
 
                   On August 14, 2003, various states and parts of southern Canada experienced widespread power outages. The outages affected approximately 1.4 million customers in FirstEnergy's service area. The U.S. - Canada Power System Outage Task Force’s final report in April 2004 on the outages concluded, among other things, that the problems leading to the outages began in FirstEnergy’s Ohio service area. Specifically, the final report concluded, among other things, that the initiation of the August 14, 2003 power outages resulted from an alleged failure of both FirstEnergy and ECAR to assess and understand perceived inadequacies within the FirstEnergy system; inadequate situational awareness of the developing conditions; and a perceived failure to adequately manage tree growth in certain transmission rights of way. The Task Force also concluded that there was a failure of the interconnected grid's reliability organizations (MISO and PJM) to provide effective real-time diagnostic support. The final report is publicly available through the Department of Energy’s Web site (www.doe.gov). FirstEnergy believes that the final report does not provide a complete and comprehensive picture of the conditions that contributed to the August 14, 2003 power outages and that it does not adequately address the underlying causes of the outages. FirstEnergy remains convinced that the outages cannot be explained by events on any one utility's system. The final report contained 46 “recommendations to prevent or minimize the scope of future blackouts.” Forty-five of those recommendations related to broad industry or policy matters while one, including subparts, related to activities the Task Force recommended be undertaken by FirstEnergy, MISO, PJM, ECAR, and other parties to correct the causes of the August 14, 2003 power outages. FirstEnergy implemented several initiatives, both prior to and since the August 14, 2003 power outages, which were independently verified by NERC as complete in 2004 and were consistent with these and other recommendations and collectively enhance the reliability of its electric system. FirstEnergy’s implementation of these recommendations in 2004 included completion of the Task Force recommendations that were directed toward FirstEnergy. FirstEnergy is also proceeding with the implementation of the recommendations that were to be completed subsequent to 2004 and will continue to periodically assess the FERC-ordered Reliability Study recommendations for forecasted 2009 system conditions, recognizing revised load forecasts and other changing system conditions which may impact the recommendations. Thus far, implementation of the recommendations has not required, nor is expected to require, substantial investment in new or material upgrades to existing equipment. The FERC or other applicable government agencies and reliability coordinators may, however, take a different view as to recommended enhancements or may recommend additional enhancements in the future as the result of adoption of mandatory reliability standards pursuant to the EPACT that could require additional material expenditures.
 
                    In addition to the above proceedings, FirstEnergy was named in a complaint filed in Michigan State Court by an individual who is not a customer of any FirstEnergy company. FirstEnergy's motion to dismiss the matter was denied on June 2, 2006. FirstEnergy has since filed an appeal, which is pending. A responsive pleading to this matter has been filed. Also, the complaint has been amended to include an additional party. No estimate of potential liability has been undertaken in this matter.
 
                    FirstEnergy was also named, along with several other entities, in a complaint in New Jersey State Court. The allegations against FirstEnergy were based, in part, on an alleged failure to protect the citizens of Jersey City from an electrical power outage. None of FirstEnergy’s subsidiaries serve customers in Jersey City. A responsive pleading has been filed. On April 28, 2006, the Court granted FirstEnergy's motion to dismiss. The plaintiff has not appealed.

142

 
                   FirstEnergy is vigorously defending these actions, but cannot predict the outcome of any of these proceedings or whether any further regulatory proceedings or legal actions may be initiated against the Companies. Although unable to predict the impact of these proceedings, if FirstEnergy or its subsidiaries were ultimately determined to have legal liability in connection with these proceedings, it could have a material adverse effect on FirstEnergy's or its subsidiaries' financial condition, results of operations and cash flows.
 
                    JCP&L's bargaining unit employees filed a grievance challenging JCP&L's 2002 call-out procedure that required bargaining unit employees to respond to emergency power outages. On May 20, 2004, an arbitration panel concluded that the call-out procedure violated the parties' collective bargaining agreement. At the conclusion of the June 1, 2005 hearing, the Arbitrator decided not to hear testimony on damages and closed the proceedings. On September 9, 2005, the Arbitrator issued an opinion to award approximately $16 million to the bargaining unit employees. On February 6, 2006, the federal court granted a Union motion to dismiss JCP&L's appeal of the award as premature. JCP&L will file its appeal again in federal district court once the damages associated with this case are identified at an individual employee level. JCP&L recognized a liability for the potential $16 million award in 2005.
 
                    The other material items not otherwise discussed above are described in Note 10(C) to the consolidated financial statements.

New Accounting Standards and Interpretations

FSP FIN 46(R)-6 - “Determining the Variability to Be Considered in Applying FASB interpretation No. 46(R)”

In April 2006, the FASB issued FSP FIN 46(R)-6 that addresses how a reporting enterprise should determine the variability to be considered in applying FASB interpretation No. 46 (revised December 2003). FirstEnergy adopted FIN 46(R) in the first quarter of 2004, consolidating VIE’s when FirstEnergy or one of its subsidiaries is determined to be the VIE’s primary beneficiary. The variability that is considered in applying interpretation 46(R) affects the determination of (a) whether the entity is a VIE; (b) which interests are variable interests in the entity; and (c) which party, if any, is the primary beneficiary of the VIE. This FSP states that the variability to be considered shall be based on an analysis of the design of the entity, involving two steps:

Step 1:
Analyze the nature of the risks in the entity
   
Step 2:
Determine the purpose(s) for which the entity was created and determine the variability the entity is designed to create and pass along to its interest holders.

After determining the variability to consider, the reporting enterprise can determine which interests are designed to absorb that variability. The guidance in this FSP is applied prospectively to all entities (including newly created entities) with which that enterprise first becomes involved and to all entities previously required to be analyzed under interpretation 46(R) when a reconsideration event has occurred after July 1, 2006. JCP&L does not expect this Statement to have a material impact on its financial statements.

FIN 48 - “Accounting for Uncertainty in Income Taxes - an interpretation of FASB Statement No. 109.”

In June 2006, the FASB issued FIN 48 which clarifies the accounting for uncertainty in income taxes recognized in an enterprise’s financial statements in accordance with FASB Statement No. 109, “Accounting for Income Taxes.” This interpretation prescribes a recognition threshold and measurement attribute for the financial statement recognition and measurement of a tax position taken or expected to be taken on a tax return. This interpretation also provides guidance on derecognition, classification, interest, penalties, accounting in interim periods, disclosure and transition. The evaluation of a tax position in accordance with this interpretation will be a two-step process. The first step will determine if it is more likely than not that a tax position will be sustained upon examination and should therefore be recognized. The second step will measure a tax position that meets the more likely than not recognition threshold to determine the amount of benefit to recognize in the financial statements. This interpretation is effective for fiscal years beginning after December 15, 2006. JCP&L is currently evaluating the impact of this Statement.

SUBSEQUENT EVENTS

New Jersey Law Change

On July 8, 2006, the Governor of New Jersey signed tax legislation that increased the current New Jersey Corporate Business tax by an additional 4% surtax, which increases the effective tax from 9% to 9.36%. This increase applies to JCP&L’s 2006 through 2008 tax years and is not expected to have a material impact on JCP&L’s results of operations.

143



METROPOLITAN EDISON COMPANY
 
CONSOLIDATED STATEMENTS OF INCOME AND COMPREHENSIVE INCOME
(Unaudited)
 
   
Three Months Ended
 
Six Months Ended
 
   
June 30,
 
June 30,
 
   
2006
 
2005
 
2006
 
2005
 
   
(In thousands)
 
                       
REVENUES
 
$
282,219
 
$
263,136
 
$
593,432
 
$
558,917
 
                           
EXPENSES:
                         
Purchased power
   
143,070
   
131,670
   
302,957
   
281,763
 
Other operating costs
   
59,575
   
52,648
   
120,654
   
111,118
 
Provision for depreciation
   
10,288
   
11,377
   
21,193
   
22,898
 
Amortization of regulatory assets
   
25,669
   
25,286
   
55,717
   
53,907
 
Deferral of new regulatory assets
   
(45,581
)
 
-
   
(45,581
)
 
-
 
General taxes
   
18,595
   
17,023
   
39,216
   
36,295
 
Total expenses
   
211,616
   
238,004
   
494,156
   
505,981
 
                           
OPERATING INCOME
   
70,603
   
25,132
   
99,276
   
52,936
 
                           
OTHER INCOME (EXPENSE):
                         
Interest income
   
8,964
   
9,442
   
17,714
   
18,469
 
Miscellaneous income
   
1,792
   
3,288
   
4,404
   
4,429
 
Interest expense
   
(12,071
)
 
(11,398
)
 
(23,255
)
 
(22,621
)
Capitalized interest
   
344
   
73
   
611
   
251
 
Total other income (expense)
   
(971
)
 
1,405
   
(526
)
 
528
 
                           
INCOME TAXES
   
29,555
   
10,874
   
40,759
   
21,325
 
                           
NET INCOME
   
40,077
   
15,663
   
57,991
   
32,139
 
                           
OTHER COMPREHENSIVE INCOME:
                         
Unrealized gain on derivative hedges
   
84
   
84
   
168
   
168
 
Income tax expense related to other comprehensive income
   
35
   
35
   
70
   
70
 
Other comprehensive income, net of tax
   
49
   
49
   
98
   
98
 
                           
TOTAL COMPREHENSIVE INCOME
 
$
40,126
 
$
15,712
 
$
58,089
 
$
32,237
 
                           
The preceding Notes to Consolidated Financial Statements as they relate to Metropolitan Edison Company are an integral part of these statements.
 
 
144

 

METROPOLITAN EDISON COMPANY
 
       
CONSOLIDATED BALANCE SHEETS
 
(Unaudited)
 
             
   
June 30,
 
December 31,
 
   
2006
 
2005
 
   
(In thousands)
 
ASSETS
           
CURRENT ASSETS:
             
Cash and cash equivalents
 
$
134
 
$
120
 
Receivables-
             
Customers (less accumulated provisions of $4,069,000 and $4,352,000,
             
respectively, for uncollectible accounts)
   
128,349
   
129,854
 
Associated companies
   
1,881
   
37,267
 
Other
   
7,489
   
8,780
 
Notes receivable from associated companies
   
31,921
   
27,867
 
Prepaid gross receipts taxes
   
25,361
   
2,072
 
Prepayments and other
   
7,115
   
5,840
 
     
202,250
   
211,800
 
UTILITY PLANT:
             
In service
   
1,885,164
   
1,856,425
 
Less - Accumulated provision for depreciation
   
723,799
   
721,566
 
     
1,161,365
   
1,134,859
 
Construction work in progress
   
20,737
   
20,437
 
     
1,182,102
   
1,155,296
 
OTHER PROPERTY AND INVESTMENTS:
             
Nuclear plant decommissioning trusts
   
243,179
   
234,854
 
Other
   
1,367
   
1,453
 
     
244,546
   
236,307
 
DEFERRED CHARGES AND OTHER ASSETS:
             
Goodwill
   
860,485
   
864,438
 
Regulatory assets
   
358,963
   
309,556
 
Prepaid pension costs
   
92,472
   
89,005
 
Other
   
47,673
   
51,285
 
     
1,359,593
   
1,314,284
 
   
$
2,988,491
 
$
2,917,687
 
LIABILITIES AND CAPITALIZATION
             
CURRENT LIABILITIES:
             
Currently payable long-term debt
 
$
150,000
 
$
100,000
 
Short-term borrowings-
             
Associated companies
   
72,540
   
140,240
 
Other
   
66,000
   
-
 
Accounts payable-
             
Associated companies
   
18,134
   
37,220
 
Other
   
52,754
   
27,507
 
Accrued taxes
   
5,866
   
17,911
 
Accrued interest
   
9,735
   
9,438
 
Other
   
21,539
   
24,274
 
     
396,568
   
356,590
 
CAPITALIZATION:
             
Common stockholder's equity-
             
Common stock, without par value, authorized 900,000 shares-
             
859,000 shares outstanding
   
1,283,182
   
1,287,093
 
Accumulated other comprehensive loss
   
(1,471
)
 
(1,569
)
Retained earnings
   
88,566
   
30,575
 
Total common stockholder's equity
   
1,370,277
   
1,316,099
 
Long-term debt and other long-term obligations
   
541,948
   
591,888
 
     
1,912,225
   
1,907,987
 
NONCURRENT LIABILITIES:
             
Accumulated deferred income taxes
   
369,737
   
344,929
 
Accumulated deferred investment tax credits
   
9,643
   
10,043
 
Nuclear fuel disposal costs
   
40,444
   
39,567
 
Asset retirement obligation
   
146,493
   
142,020
 
Retirement benefits
   
57,118
   
57,809
 
Other
   
56,263
   
58,742
 
     
679,698
   
653,110
 
COMMITMENTS AND CONTINGENCIES (Note 10)
             
   
$
2,988,491
 
$
2,917,687
 
               
The preceding Notes to Consolidated Financial Statements as they relate to Metropolitan Edison Company are an integral part of these balance sheets. 
 
 
145

 
 
 
   
CONSOLIDATED STATEMENTS OF CASH FLOWS
 
(Unaudited)
 
   
 
Six Months Ended
 
 
June 30,
 
 
2006
2005
 
 
 (In thousands)
 
              
CASH FLOWS FROM OPERATING ACTIVITIES:
            
Net income
 
$
57,991
 
$
32,139
 
Adjustments to reconcile net income to net cash from operating activities -
             
Provision for depreciation
   
21,193
   
22,898
 
Amortization of regulatory assets
   
55,717
   
53,907
 
Deferred costs recoverable as regulatory assets
   
(50,570
)
 
(47,798
)
Deferral of new regulatory assets
   
(45,581
)
 
-
 
Deferred income taxes and investment tax credits, net
   
22,463
   
(1,898
)
Accrued compensation and retirement benefits
   
(4,712
)
 
(4,519
)
Cash collateral to suppliers
   
(2,250
)
 
-
 
Decrease (increase) in operating assets -
             
Receivables
   
38,182
   
110,210
 
Prepayments and other current assets
   
(24,564
)
 
(21,205
)
Increase (decrease) in operating liabilities -
             
Accounts payable
   
6,161
   
(50,593
)
Accrued taxes
   
(12,045
)
 
(5,184
)
Accrued interest
   
297
   
(887
)
Other
   
(4,011
)
 
1,424
 
 Net cash provided from operating activities
   
58,271
   
88,494
 
               
CASH FLOWS FROM FINANCING ACTIVITIES:
             
New Financing-
             
Long-term debt
   
-
   
-
 
Short-term borrowings, net
   
-
   
20,931
 
Redemptions and Repayments-
   
       
Long-term debt
   
-
   
(37,830
)
Short-term borrowings, net
   
(1,707
)
 
-
 
Dividend Payments-
             
Common stock
   
-
   
(34,000
)
 Net cash used for financing activities
   
(1,707
)
 
(50,899
)
               
CASH FLOWS FROM INVESTING ACTIVITIES:
             
Property additions
   
(47,301
)
 
(34,395
)
Proceeds from nuclear decommissioning trust fund sales
   
116,704
   
55,081
 
Investments in nuclear decommissioning trust funds
   
(121,446
)
 
(59,823
)
Loan repayments from (loans to) associated companies, net
   
(4,054
)
 
3,339
 
Other
   
(453
)
 
(1,797
)
 Net cash used for investing activities
   
(56,550
)
 
(37,595
)
               
Net change in cash and cash equivalents
   
14
   
-
 
Cash and cash equivalents at beginning of period
   
120
   
120
 
Cash and cash equivalents at end of period
 
$
134
 
$
120
 
 
             
The preceding Notes to Consolidated Financial Statements as they relate to Metropolitan Edison Company are an integral part of these statements.

 
146


 
 
Report of Independent Registered Public Accounting Firm









To the Stockholder and Board of
Directors of Metropolitan Edison Company:

We have reviewed the accompanying consolidated balance sheet of Metropolitan Edison Company and its subsidiaries as of June 30, 2006, and the related consolidated statements of income and comprehensive income for each of the three-month and six-month periods ended June 30, 2006 and 2005 and the consolidated statement of cash flows for the six-month period ended June 30, 2006 and 2005. These interim financial statements are the responsibility of the Company’s management.

We conducted our review in accordance with the standards of the Public Company Accounting Oversight Board (United States). A review of interim financial information consists principally of applying analytical procedures and making inquiries of persons responsible for financial and accounting matters. It is substantially less in scope than an audit conducted in accordance with the standards of the Public Company Accounting Oversight Board, the objective of which is the expression of an opinion regarding the financial statements taken as a whole. Accordingly, we do not express such an opinion.

Based on our review, we are not aware of any material modifications that should be made to the accompanying consolidated interim financial statements for them to be in conformity with accounting principles generally accepted in the United States of America.

We have previously audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated balance sheet as of December 31, 2005, and the related consolidated statements of income, capitalization, common stockholder’s equity, preferred stock, cash flows and taxes for the year then ended (not presented herein), and in our report [which contained references to the Company’s change in its method of accounting for asset retirement obligations as of January 1, 2003 and conditional asset retirement obligations as of December 31, 2005 as discussed in Note 2(G) and Note 9 to those consolidated financial statements] dated February 27, 2006, we expressed an unqualified opinion on those consolidated financial statements. In our opinion, the information set forth in the accompanying consolidated balance sheet as of December 31, 2005, is fairly stated in all material respects in relation to the consolidated balance sheet from which it has been derived.




PricewaterhouseCoopers LLP
Cleveland, Ohio
August 4, 2006



147


METROPOLITAN EDISON COMPANY

MANAGEMENT’S DISCUSSION AND ANALYSIS OF
RESULTS OF OPERATIONS AND FINANCIAL CONDITION

Met-Ed is a wholly owned, electric utility subsidiary of FirstEnergy. Met-Ed conducts business in eastern Pennsylvania, providing regulated electric transmission and distribution services. Met-Ed also provides generation service to those customers electing to retain Met-Ed as their power supplier.

Results of Operations

Net income in the second quarter of 2006 increased to $40 million from $16 million in the second quarter of 2005. For the first six months of 2006, net income increased to $58 million from $32 million in the same period of 2005. The increase in net income for both periods reflects higher revenues and the deferral of new regulatory assets, partially offset by increased purchased power costs and other operating costs as discussed below.

Revenues

Revenues increased by $19 million, or 7.3%, in the second quarter of 2006 and $35 million, or 6.2%, in the first six months of 2006, compared with the same periods of 2005. Increases in both periods were primarily due to higher retail generation electric revenues ($15 million for the second quarter and $27 million for the first six months) which reflected higher composite unit prices in all customer classes. Higher KWH sales to commercial and industrial customers were partially offset by lower KWH sales to residential customers. Industrial KWH sales increased primarily due to the return of customers to Met-Ed from alternative suppliers. Sales by alternative suppliers as a percent of total industrial sales in Met-Ed’s franchise area decreased by 14.5 percentage points, in the second quarter of 2006 and 14.2 percentage points in the first six months of 2006. For both periods, residential KWH sales decreased primarily due to the milder weather in 2006 compared with 2005.

Revenues from distribution throughput increased by $1 million in the second quarter of 2006 compared with the same period of 2005. The increase was due to higher composite unit prices and a 0.4% increase in total KWH deliveries. This relatively flat change in KWH deliveries reflected a 3.2% increase in deliveries to commercial customers primarily due to a 1.7% increase in the number of commercial customers, partially offset by milder weather in the second quarter of 2006 (a 21% decrease in heating degree days and an 8.0% decrease in cooling degree days) compared to the same period in 2005. The $1 million decrease in distribution revenues in the first six months of 2006 was primarily due to a 1.1% decrease in KWH deliveries, reflecting the milder temperatures in 2006 compared to the same period in 2005.

For both periods, transmission revenues increased primarily due to higher transmission prices, which also resulted in higher transmission expenses as discussed below. In the first six months of 2006, other revenues also increased due to a $2 million increase in the first quarter of 2006, compared to the same period in 2005, for a payment received under a contract provision associated with the prior sale of TMI Unit 1. Under the contract, additional payments are received if subsequent energy prices rise above specified levels, which occurred. This payment is credited to Met-Ed’s customers, resulting in no net earnings effect.

Changes in KWH sales by customer class in the second quarter and the first six months of 2006 compared with the same periods in 2005 are summarized in the following table:

 
 
Three
 
Six
 
Changes in KWH Sales
 
Months
 
Months
 
Increase (Decrease)
 
 
 
 
 
Retail Electric Generation:
 
 
 
 
 
Residential
 
 
(1.0
)%
 
(1.9
)%
Commercial
 
 
4.2
%
 
2.1
%
Industrial
 
 
15.8
%
 
14.0
%
Total Retail Electric Generation Sales
 
 
5.6
%
 
3.7
%
           
Distribution Deliveries:
 
 
 
 
 
Residential
 
 
(1.2
)%
 
(2.1
)%
Commercial
 
 
3.2
%
 
1.2
%
Industrial
 
 
(0.9
)%
 
(2.3
)%
Total Distribution Deliveries
 
 
0.4
%
 
(1.1
)%
 
 
 
 
 
 
 
 


148


Expenses
 
                   Total expenses decreased by $27 million and $12 million in the second quarter and the first six months of 2006, respectively, compared with the same periods of 2005. The following table presents changes from the prior year by expense category:

   
Three
 
Six
 
Expenses - Changes
 
Months
 
Months
 
Increase (Decrease)
 
(In millions)
 
Purchased power costs
 
$
11
 
$
21
 
Other operating costs
 
 
7
 
 
10
 
Provision for depreciation
 
 
(1
)
 
(2
)
Amortization of regulatory assets
 
 
-
 
 
2
 
Deferral of new regulatory assets
   
(46
)
 
(46
)
General taxes
   
2
   
3
 
Net decrease in expenses
 
$
(27
$
(12
)

Purchased power costs increased in the second quarter and first six months of 2006 by $11 million and $21 million, respectively, due to increased purchases to meet higher customer demand and higher composite unit prices. These increases were partially offset by increased NUG cost deferrals of $6 million in the second quarter and $4 million in the first six months of 2006. Other operating costs increased for both periods primarily due to higher transmission expenses, which increased as a result of the higher transmission prices discussed above. The deferral of new regulatory assets of $46 million reflected the May 4, 2006 PPUC approval of Met-Ed’s request to defer certain 2006 transmission-related costs. Met-Ed implemented the deferral accounting in the second quarter of 2006, which included $24 million for costs incurred in the first quarter of 2006 (see Regulatory Matters for further discussion). For both periods, general taxes increased primarily due to higher gross receipt taxes.

Capital Resources and Liquidity

Met-Ed’s cash requirements in 2006 for expenses, construction expenditures and scheduled debt maturities, are expected to be met with a combination of cash from operations, issuance of long-term debt, and short-term credit arrangements.

Changes in Cash Position

As of June 30, 2006, Met-Ed had $134,000 of cash and cash equivalents compared with $120,000 as of December 31, 2005. The major sources for changes in these balances are summarized below.

Cash Flows From Operating Activities

Cash provided from operating activities in the first six months of 2006 and 2005 were as follows:

 
 
Six Months Ended
 
 
 
June 30,
 
 Operating Cash Flows
 
2006
 
2005
 
 
 
(In millions)
 
Cash earnings (1)
 
$
56
 
$
55
 
Working capital and other
 
 
2
 
 
33
 
Net cash provided from operating activities
 
$
58
 
$
88
 
 
 
 
 
 
 
 
 
(1) Cash earnings are a non-GAAP measure (see reconciliation below).

Cash earnings (in the table above) are not a measure of performance calculated in accordance with GAAP. Met-Ed believes that cash earnings are a useful financial measure because it provides investors and management with an additional means of evaluating its cash-based operating performance.



 
 
Six Months Ended
 
 
 
June 30,
 
 Reconciliation of Cash Earnings
 
2006
 
2005
 
   
(In millions)
 
Net income (GAAP)
 
$
58
 
$
32
 
Non-cash charges (credits):
 
 
   
 
 
 
Provision for depreciation
 
 
21
 
 
23
 
Amortization of regulatory assets
 
 
56
 
 
54
 
Deferred costs recoverable as regulatory assets
 
 
(51
)
 
(48
Deferral of new regulatory assets
   
(46
)
 
-
 
Deferred income taxes and investment tax credits, net
 
 
23
 
 
(2
Other non-cash charges
 
 
(5
)
 
(4
Cash earnings (Non-GAAP)
 
$
56
 
$
55
 
               

149



The $1 million increase in cash earnings is described above under “Results of Operations.” The $31 million working capital change primarily resulted from a $72 million decrease in cash provided from the settlement of receivables, a $7 million decrease in accrued taxes, a $3 million decrease in prepayments, a $2 million increase in cash collateral returned to suppliers, and a $4 million decrease in other accrued liabilities, partially offset by $57 million in decreased outflows for accounts payable.

Cash Flows From Financing Activities

Net cash used for financing activities was $2 million in first six months of 2006 compared to $51 million in the same period of 2005. The decrease primarily reflects a $38 million decrease in long-term debt redemptions and a $34 million decrease in common stock dividend payments to FirstEnergy in the first six months of 2006, partially offset by a $23 million decrease in short-term borrowings.

As of June 30, 2006, Met-Ed had approximately $32 million of cash and temporary investments (which included short-term notes receivable from associated companies) and $139 million of short-term borrowings. Met-Ed has authorization from the SEC, continued by FERC rules adopted as a result of EPACT’s repeal of PUCHA, to incur short-term debt up to $250 million and authorization from the PPUC to incur money pool borrowings up to $300 million. In addition, Met-Ed has $80 million of available accounts receivable financing facilities as of June 30, 2006 through Met-Ed Funding LLC, Met-Ed’s wholly owned subsidiary. As a separate legal entity with separate creditors, Met-Ed Funding would have to satisfy its obligations to creditors before any of its remaining assets could be made available to Met-Ed. As of June 30, 2006 the facility was drawn for $66 million. In June 2006, the facility was renewed until June 28, 2007. The annual facility fee is 0.125% on the entire finance limit.

Under the terms of Met-Ed’s senior note indenture, FMBs may no longer be issued so long as the senior notes are outstanding. As of June 30, 2006, Met-Ed had the capability to issue $633 million of additional senior notes based upon FMB collateral. Met-Ed had no restrictions on the issuance of preferred stock.

Met-Ed, FirstEnergy, OE, Penn, CEI, TE, JCP&L, Penelec, FES and ATSI, as Borrowers, have entered into a syndicated $2 billion five-year revolving credit facility with a syndicate of banks that expires in June 2010. Borrowings under the facility are available to each Borrower separately and mature on the earlier of 364 days from the date of borrowing or the commitment expiration date, as the same may be extended. Met-Ed’s borrowing limit under the facility is $250 million.

Under the revolving credit facility, Borrowers may request the issuance of LOCs expiring up to one year from the date of issuance. The stated amount of outstanding LOCs will count against total commitments available under the facility and against the applicable borrower’s borrowing sub-limit. Total unused borrowing capability under the existing credit facilities and accounts receivable financing facilities totaled $264 million as of June 30, 2006.

The revolving credit facility contains financial covenants requiring each Borrower to maintain a consolidated debt to total capitalization ratio of no more than 65%. As of June 30, 2006, Met-Ed’s debt to total capitalization as defined under the revolving credit facility was 38%.

The facility does not contain any provisions that either restrict Met-Ed’s ability to borrow or accelerate repayment of outstanding advances as a result of any change in its credit ratings. Pricing is defined in “pricing grids”, whereby the cost of funds borrowed under the facility is related to Met-Ed's credit ratings.

Met-Ed has the ability to borrow from its regulated affiliates and FirstEnergy to meet its short-term working capital requirements. FESC administers this money pool and tracks surplus funds of FirstEnergy and its regulated subsidiaries, as well as proceeds available from bank borrowings. Companies receiving a loan under the money pool agreements must repay the principal amount of such a loan, together with accrued interest, within 364 days of borrowing the funds. The rate of interest is the same for each company receiving a loan from the pool and is based on the average cost of funds available through the pool. The average interest rate for borrowings in the first six months of 2006 was 4.86%.

Met-Ed’s access to the capital markets and the costs of financing are dependent on the ratings of its securities and that of FirstEnergy. As of June 30, 2006, Met-Ed’s and FirstEnergy’s ratings outlook from S&P on all securities was stable. The ratings outlook from Moody’s and Fitch on all securities is positive.


150


Cash Flows From Investing Activities

In the first six months of 2006, Met-Ed’s cash used for investing activities totaled $57 million, compared with $38 million in the same period of 2005. The increase primarily resulted from a $13 million increase in property additions and a $7 million increase in loans to associated companies. Expenditures for property additions primarily support Met-Ed’s energy delivery operations and reliability initiatives.

During the last half of 2006, capital requirements for property additions are expected to be about $29 million. Met-Ed has additional requirements of approximately $100 million for maturing long-term debt during the remainder of 2006. These cash requirements are expected to be satisfied from a combination of internal cash, funds raised in the long-term debt capital markets and short-term credit arrangements.

Met-Ed's capital spending for the period 2006 through 2010 is expected to be about $360 million, of which approximately $76 million applies to 2006. The capital spending is primarily for property additions supporting the distribution of electricity.

Market Risk Information

Met-Ed uses various market risk sensitive instruments, including derivative contracts, primarily to manage the risk of price and interest rate fluctuations. FirstEnergy’s Risk Policy Committee, comprised of members of senior management, provides general oversight to risk management activities throughout the company.

Commodity Price Risk

Met-Ed is exposed to market risk primarily due to fluctuations in electricity, energy transmission, natural gas, coal, and emission prices. To manage the volatility relating to these exposures, it uses a variety of non-derivative and derivative instruments, including forward contracts, options, futures contracts, and swaps. The derivatives are used principally for hedging purposes. All derivatives that fall within the scope of SFAS 133 must be recorded at their fair value and marked to market. The majority of Met-Ed’s derivative hedging contracts qualify for normal purchase and normal sale exception under SFAS 133. Contracts that are not exempt from such treatment include purchase power agreements with NUG entities that were structured pursuant to the Public Utility Regulatory Policy Act of 1978. These non-trading contracts are adjusted to fair value at the end of each quarter, with a corresponding regulatory asset recognized for above-market costs. On April 1, 2006, Met-Ed elected to apply the normal purchase and normal sale exception to certain NUG power purchase agreements with an above-market fair value of $1 million (included in “Other” in the table below) in accordance with guidance in DIG C20. The change in the fair value of commodity derivative contracts related to energy production during the second quarter and first six months of 2006 is summarized in the following table:

   
Three Months Ended
 
Six Months Ended
 
Increase (Decrease) in the Fair Value
 
June 30, 2006
 
June 30, 2006
 
of Commodity Derivative Contracts
 
Non-Hedge
 
Hedge
 
Total
 
Non-Hedge
 
Hedge
 
Total
 
 
 
(In millions)
 
Change in the Fair Value of
 
 
 
 
 
 
 
 
 
 
 
 
 
Commodity Derivative Contracts:
 
 
 
 
 
 
 
 
 
 
 
 
 
Outstanding net asset at beginning of period
 
$
24
 
$
-
 
$
24
 
$
27
 
$
-
 
$
27
 
New contract value when entered
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Additions/change in value of existing contracts
 
 
-
 
 
-
 
 
-
 
 
4
 
 
-
 
 
4
 
Change in techniques/assumptions
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Settled contracts
 
 
(2
)
 
-
 
 
(2
)
 
(9
)
 
-
 
 
(9
)
Other
   
1
   
-
   
1
   
1
   
-
   
1
 
Net Assets - Derivative Contracts
at End of Period (1)
 
$
23
 
$
-
 
$
23
 
$
23
 
$
-
 
$
23
 
 
 
 
   
 
   
 
   
 
   
 
   
 
   
Impact of Changes in Commodity Derivative Contracts(2)
 
 
   
 
   
 
   
 
   
 
   
 
   
Income Statement effects (pre-tax)
 
$
(2
)
$
-
 
$
(2
)
$
(2
)
$
-
 
$
(2
)
Balance Sheet effects:
 
 
   
 
   
 
   
 
   
 
   
 
   
OCI (pre-tax)
 
$
-
 
$
-
 
$
-
 
$
-
 
$
-
 
$
-
 
Regulatory liability
 
$
-
 
$
-
 
$
-
 
$
-
 
$
-
 
$
-
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

(1) Includes $23 million in non-hedge commodity derivative contract, which is offset by a regulatory liability.
(2) Represents the change in value of existing contracts, settled contracts and changes in techniques/assumptions.


151


Derivatives are included on the Consolidated Balance Sheet as of June 30, 2006 as follows:

Balance Sheet Classification
   
Non-Hedge
   
Hedge
   
Total
     
(In millions)
Non-Current-
                 
Other deferred charges
 
$
23
 
$
-
 
$
23
Other noncurrent liabilities
   
-
   
-
   
-
                   
Net assets
 
$
23
 
$
-
 
$
23
                   

The valuation of derivative contracts is based on observable market information to the extent that such information is available. In cases where such information is not available, Met-Ed relies on model-based information. The model provides estimates of future regional prices for electricity and an estimate of related price volatility. Met-Ed uses these results to develop estimates of fair value for financial reporting purposes and for internal management decision making. Sources of information for the valuation of commodity derivative contracts as of June 30, 2006 are summarized by year in the following table:

Source of Information
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Fair Value by Contract Year
 
2006(1)
 
2007
 
2008
 
2009
 
2010
 
Thereafter
 
Total
 
 
(In millions)
Other external sources (2)
 
$
5
 
$
5
 
$
5
 
$
-
 
 $
-
 
$
-
 
$
15
Prices based on models(3)
 
 
-
 
 
-
 
 
-
 
 
4
 
 
4
 
 
-
 
 
8
 
 
 
   
 
   
 
   
 
 
 
 
 
 
 
 
 
 
 
Total(3)
 
$
5
 
$
5
 
$
5
 
$
4
 
 $
4
 
$
-
 
$
23

(1) For the last two quarters of 2006.
(2) Broker quote sheets.
(3) Includes $23 million from a non-hedge commodity derivative contract that is offset by a regulatory liability and does not affect earnings.

Met-Ed performs sensitivity analyses to estimate its exposure to the market risk of its commodity positions. A hypothetical 10% adverse shift in quoted market prices in the near term on both of Met-Ed’s trading and non-trading derivative instruments would not have had a material effect on its consolidated financial position or cash flows as of June 30, 2006.

Equity Price Risk

Included in Met-Ed's nuclear decommissioning trusts are marketable equity securities carried at their market value of approximately $146 million and $142 million as of June 30, 2006 and December 31, 2005, respectively. A hypothetical 10% decrease in prices quoted by stock exchanges would result in a $15 million reduction in fair value as of June 30, 2006.

Regulatory Matters
 
                   Regulatory assets are costs which have been authorized by the PPUC and the FERC for recovery from customers in future periods or for which authorization is probable. Without the probability of such authorization, costs currently recorded as regulatory assets would have been charged to income as incurred. All regulatory assets are expected to be recovered under the provisions of Met-Ed’s transition plan and rate restructuring plan. Met-Ed’s regulatory assets as of June 30, 2006 and December 31, 2005 were $359 million and $310 million, respectively.
 
                    A February 2002 Commonwealth Court of Pennsylvania decision affirmed the June 2001 PPUC decision regarding approval of the FirstEnergy/GPU merger, remanded the issues of quantification and allocation of merger savings to the PPUC and denied Met-Ed and Penelec the rate relief initially approved in the PPUC decision. On October 2, 2003, the PPUC issued an order concluding that the Commonwealth Court reversed the PPUC’s June 2001 order in its entirety. In accordance with the PPUC’s direction, Met-Ed and Penelec filed supplements to their tariffs that became effective in October 2003 and that reflected the CTC rates and shopping credits in effect prior to the June 2001 order.
 
                   Met-Ed’s and Penelec’s combined portion of total net merger savings during 2001 - 2004 is estimated to be approximately $51 million. A procedural schedule was established by the ALJ on January 17, 2006 and the companies filed initial testimony on March 1, 2006. On May 4, 2006, the PPUC consolidated this proceeding with the April 10, 2006 comprehensive rate filing proceeding discussed below. Met-Ed and Penelec are unable to predict the outcome of this matter.


152

 
                   In an October 16, 2003 order, the PPUC approved September 30, 2004 as the date for Met-Ed's NUG trust fund refunds. The PPUC order also denied its accounting treatment request regarding the CTC rate/shopping credit swap by requiring Met-Ed to treat the stipulated CTC rates that were in effect from January 1, 2002 on a retroactive basis. On October 22, 2003, Met-Ed filed an Objection with the Commonwealth Court asking that the Court reverse this PPUC finding; a Commonwealth Court judge subsequently denied its Objection on October 27, 2003 without explanation. On October 31, 2003, Met-Ed filed an Application for Clarification of the Court order with the Commonwealth Court, a Petition for Review of the PPUC's October 2 and October 16, 2003 Orders, and an Application for Reargument, if the judge, in his clarification order, indicates that Met-Ed's Objection was intended to be denied on the merits. The Reargument Brief before the Commonwealth Court was filed on January 28, 2005. Oral arguments were held on June 8, 2006. On July 19, 2006, the Commonwealth Court issued its decision affirming the PPUC’s prior orders. Although the decision denied the appeal of Met-Ed, it had previously accounted for the treatment of costs required by the PPUC’s October 2003 orders.
 
              As of June 30, 2006, Met-Ed's and Penelec's regulatory deferrals pursuant to the 1998 Restructuring Settlement (including the Phase 2 Proceedings) and the FirstEnergy/GPU Merger Settlement Stipulation were $335 million and $57 million, respectively. Penelec's $57 million is subject to the pending resolution of taxable income issues associated with NUG trust fund proceeds. The PPUC is reviewing a January 2006 change in Met-Ed’s and Penelec’s NUG purchase power stranded cost accounting methodology. If the PPUC orders Met-Ed and Penelec to reverse the change in accounting methodology, this would result in a pre-tax loss of $10.3 million for Met-Ed. 
 
                   On November 18, 2004, the FERC issued an order eliminating the RTOR for transmission service between the MISO and PJM regions. The FERC also ordered the MISO, PJM and the transmission owners within MISO and PJM to submit compliance filings containing a SECA mechanism to recover lost RTOR revenues during a 16-month transition period from load serving entities. The FERC issued orders in 2005 setting the SECA for hearing. ATSI, JCP&L, Met-Ed, Penelec, and FES continue to be involved in the FERC hearings concerning the calculation and imposition of the SECA charges. The hearing was held in May 2006. Initial briefs were submitted on June 9, 2006, and reply briefs were filed on June 27, 2006. The FERC has ordered the Presiding Judge to issue an initial decision by August 11, 2006.
 
                   On January 31, 2005, certain PJM transmission owners made three filings with the FERC pursuant to a settlement agreement previously approved by the FERC. JCP&L, Met-Ed and Penelec were parties to that proceeding and joined in two of the filings. In the first filing, the settling transmission owners submitted a filing justifying continuation of their existing rate design within the PJM RTO. In the second filing, the settling transmission owners proposed a revised Schedule 12 to the PJM tariff designed to harmonize the rate treatment of new and existing transmission facilities. Interventions and protests were filed on February 22, 2005. In the third filing, Baltimore Gas and Electric Company and Pepco Holdings, Inc. requested a formula rate for transmission service provided within their respective zones. On May 31, 2005, the FERC issued an order on these cases. First, it set for hearing the existing rate design and indicated that it will issue a final order within six months. American Electric Power Company, Inc. filed in opposition proposing to create a "postage stamp" rate for high voltage transmission facilities across PJM. Second, the FERC approved the proposed Schedule 12 rate harmonization. Third, the FERC accepted the proposed formula rate, subject to refund and hearing procedures. On June 30, 2005, the settling PJM transmission owners filed a request for rehearing of the May 31, 2005 order. On March 20, 2006, a settlement was filed with FERC in the formula rate proceeding that generally accepts the companies' formula rate proposal. The FERC issued an order approving this settlement on April 19, 2006. Hearings in the PJM rate design case concluded in April 2006. On July 13, 2006, an Initial Decision was issued by the ALJ. The ALJ adopted the Trial Staff’s position that the cost of all PJM transmission facilities should be recovered through a postage stamp rate. The ALJ recommended an April 1, 2006 effective date for this change in rate design. If the FERC accepts this recommendation, the transmission rate applicable to many load zones in PJM would increase. FirstEnergy believes that significant additional transmission revenues would have to be recovered from the JCP&L, Met-Ed and Penelec transmission zones within PJM. The Companies, as part of the Responsible Pricing Alliance, intend to submit a brief on exceptions within thirty days of the initial decision. Following submission of reply exceptions, the case is expected to be reviewed by the FERC with a decision anticipated in the fourth quarter of 2006.

On January 12, 2005, Met-Ed filed, before the PPUC, a request for deferral of transmission-related costs beginning January 1, 2005. The OCA, OSBA, OTS, MEIUG, PICA, Allegheny Electric Cooperative and Pennsylvania Rural Electric Association all intervened in the case. Met-Ed sought to consolidate this proceeding (and modified its request to provide deferral of 2006 transmission-related costs only) with the comprehensive rate filing it made on April 10, 2006 as described below. On May 4, 2006, the PPUC approved the modified request. Accordingly, Met-Ed has deferred approximately $46 million, representing transmission costs that were incurred from January 1, 2006 through June 30, 2006. On June 5, 2006, the OCA filed before the Commonwealth Court a petition for review of the PPUC’s approval of the deferral. On July 12, 2006, the Commonwealth Court granted the PPUC’s motion to quash the OCA’s appeal. The ratemaking treatment of the deferral will be determined in the comprehensive rate filing proceeding discussed further below.
 
                    Met-Ed purchases a portion of its PLR requirements from FES through a wholesale power sales agreement. Under this agreement, FES retains the supply obligation and the supply profit and loss risk for the portion of power supply requirements not self-supplied by Met-Ed under its contracts with NUGs and other unaffiliated suppliers. The FES arrangement reduces Met-Ed's exposure to high wholesale power prices by providing power at a fixed price for its uncommitted PLR energy costs during the term of the agreement with FES. The wholesale power sales agreement with FES could automatically be extended for each successive calendar year unless any party elects to cancel the agreement by November 1 of the preceding year. On November 1, 2005, FES and the other parties thereto amended the agreement to provide FES the right in 2006 to terminate the agreement at any time upon 60 days notice. On April 7, 2006, the parties to the wholesale power sales agreement entered into a Tolling Agreement that arises out of FES’ notice to Met-Ed that FES elected to exercise its right to terminate the wholesale power sales agreement effective midnight December 31, 2006, because that agreement is not economically sustainable to FES.

153


                    In lieu of allowing such termination to become effective as of December 31, 2006, the parties agreed, pursuant to the Tolling Agreement, to amend the wholesale power sales agreement to provide as follows:

   1.  The termination provisions of the wholesale power sales agreement will be tolled for one year until December 31, 2007, provided that during such tolling period:

 a.    FES will be permitted to terminate the wholesale power sales agreement at any time with sixty days written notice;
 b.    Met-Ed will procure through arrangements other than the wholesale power sales agreement beginning December 1, 2006 and ending December 31, 2007,     approximately 33% of the amounts of capacity and energy necessary to satisfy its PLR obligations for which Committed Resources (i.e., non-utility generation under contract to Met-Ed, Met-Ed-owned generating facilities, purchased power contracts and distributed generation) have not been obtained; and
 c.    FES will not be obligated to supply additional quantities of capacity and energy in the event that a supplier of Committed Resources defaults on its supply agreement.

   2.   During the tolling period, FES will not act as an agent for Met-Ed in procuring the services under 1.(b) above; and

   3.  The pricing provision of the wholesale power sales agreement shall remain unchanged provided Met-Ed complies with the provisions of the Tolling Agreement and  any applicable provision of the wholesale power sales agreement.
 
 
                   In the event that FES elects not to terminate the wholesale power sales agreement effective midnight December 31, 2007, similar tolling agreements effective after December 31, 2007 are expected to be considered by FES for subsequent years if Met-Ed procures through arrangements other than the wholesale power sales agreement approximately 64%, 83% and 95% of the additional amounts of capacity and energy necessary to satisfy its PLR obligations for 2008, 2009 and 2010, respectively, for which Committed Resources have not been obtained from the market.
 
                   The wholesale power sales agreement, as modified by the Tolling Agreement, requires Met-Ed to satisfy the portion of its PLR obligations currently supplied by FES from unaffiliated suppliers at prevailing prices, which are likely to be higher than the current price charged by FES under the current agreement and, as a result, Met-Ed’s purchased power costs could materially increase. If Met-Ed was to replace the entire FES supply at current market power prices without corresponding regulatory authorization to increase its generation prices to customers, Met-Ed would likely incur a significant increase in operating expenses and experience a material deterioration in credit quality metrics. Under such a scenario, Met-Ed's credit profile would no longer be expected to support an investment grade rating for its fixed income securities. There can be no assurance, however, that if FES ultimately determines to terminate, or significantly modify the agreement, timely regulatory relief will be granted by the PPUC pursuant to the April 10, 2006 comprehensive rate filing discussed below, or, to the extent granted, adequate to mitigate such adverse consequences.
 
                   Met-Ed made a comprehensive rate filing with the PPUC on April 10, 2006 that addresses a number of transmission, distribution and supply issues. If Met-Ed's preferred approach involving accounting deferrals is approved, the filing would increase annual revenues by $216 million. That filing includes, among other things, a request to charge customers for an increasing amount of market priced power procured through a CBP as the amount of supply provided under the existing FES agreement is phased out in accordance with the April 7, 2006 Tolling Agreement described above. Met-Ed also requested approval of the January 12, 2005 petition for the deferral of transmission-related costs discussed above, but only for those costs incurred during 2006. In this rate filing, Met-Ed also requested recovery of annual transmission and related costs incurred on or after January 1, 2007, plus the amortized portion of 2006 costs over a ten-year period, along with applicable carrying charges, through an adjustable rider similar to that implemented in Ohio. Changes in the recovery of NUG expenses and the recovery of Met-Ed's non-NUG stranded costs are also included in the filing. The filing contemplates a reduction in distribution rates for Met-Ed of $37 million annually. The PPUC suspended the effective date (June 10, 2006) of these rate changes for seven months after the filing as permitted under Pennsylvania law. If the PPUC adopts the overall positions taken in the intervenors’ testimony as filed, this would have a material adverse effect on the financial statements of FirstEnergy, Met-Ed and Penelec. Hearings are scheduled for late August 2006 and a PPUC decision is expected early in the first quarter of 2007.

See Note 11 to the consolidated financial statements for further details and a complete discussion of regulatory matters in Pennsylvania including a more detailed discussion of reliability initiatives, including actions by the PPUC that impact Met-Ed.

154


Environmental Matters
 
                    Met-Ed accrues environmental liabilities when it concludes that it is probable that it has an obligation for such costs and can reasonably determine the amount of such costs. Unasserted claims are reflected in Met-Ed’s determination of environmental liabilities and are accrued in the period that they are both probable and reasonably estimable.
 
                   Met-Ed has been named as a PRP at waste disposal sites which may require cleanup under the Comprehensive Environmental Responsive, Comprehension and Liability Act of 1980. Allegations of disposal of hazardous substances at historical sites and the liability involved are often unsubstantiated and subject to dispute; however, federal law provides that PRPs for a particular site are held liable on a joint and several basis. Therefore, environmental liabilities that are considered probable have been recognized on the Consolidated Balance Sheet as of June 30, 2006, based on estimates of the total costs of cleanup, Met-Ed’s proportionate responsibility for such costs and the financial ability of other unaffiliated entities to pay.
 
                   See Note 10(B) to the consolidated financial statements for further details and a complete discussion of environmental matters.

Other Legal Proceedings

Power Outages and Related Litigation
 
                   There are various lawsuits, claims (including claims for asbestos exposure) and proceedings related to Met-Ed’s normal business operations pending against Met-Ed. The other material items not otherwise discussed below are described in Note 10(C) to the consolidated financial statements.
 
                   On August 14, 2003, various states and parts of southern Canada experienced widespread power outages. The outages affected approximately 1.4 million customers in FirstEnergy's service area. The U.S. - Canada Power System Outage Task Force’s final report in April 2004 on the outages concluded, among other things, that the problems leading to the outages began in FirstEnergy’s Ohio service area. Specifically, the final report concluded, among other things, that the initiation of the August 14, 2003 power outages resulted from an alleged failure of both FirstEnergy and ECAR to assess and understand perceived inadequacies within the FirstEnergy system; inadequate situational awareness of the developing conditions; and a perceived failure to adequately manage tree growth in certain transmission rights of way. The Task Force also concluded that there was a failure of the interconnected grid's reliability organizations (MISO and PJM) to provide effective real-time diagnostic support. The final report is publicly available through the Department of Energy’s Web site (www.doe.gov). FirstEnergy believes that the final report does not provide a complete and comprehensive picture of the conditions that contributed to the August 14, 2003 power outages and that it does not adequately address the underlying causes of the outages. FirstEnergy remains convinced that the outages cannot be explained by events on any one utility's system. The final report contained 46 “recommendations to prevent or minimize the scope of future blackouts.” Forty-five of those recommendations related to broad industry or policy matters while one, including subparts, related to activities the Task Force recommended be undertaken by FirstEnergy, MISO, PJM, ECAR, and other parties to correct the causes of the August 14, 2003 power outages. FirstEnergy implemented several initiatives, both prior to and since the August 14, 2003 power outages, which were independently verified by NERC as complete in 2004 and were consistent with these and other recommendations and collectively enhance the reliability of its electric system. FirstEnergy’s implementation of these recommendations in 2004 included completion of the Task Force recommendations that were directed toward FirstEnergy. FirstEnergy is also proceeding with the implementation of the recommendations that were to be completed subsequent to 2004 and will continue to periodically assess the FERC-ordered Reliability Study recommendations for forecasted 2009 system conditions, recognizing revised load forecasts and other changing system conditions which may impact the recommendations. Thus far, implementation of the recommendations has not required, nor is expected to require, substantial investment in new or material upgrades to existing equipment. The FERC or other applicable government agencies and reliability coordinators may, however, take a different view as to recommended enhancements or may recommend additional enhancements in the future as the result of adoption of mandatory reliability standards pursuant to the EPACT that could require additional material expenditures.

In addition to the above proceedings, FirstEnergy was named in a complaint filed in Michigan State Court by an individual who is not a customer of any FirstEnergy company. FirstEnergy's motion to dismiss the matter was denied on June 2, 2006. FirstEnergy has since filed an appeal, which is pending. A responsive pleading to this matter has been filed. Also, the complaint has been amended to include an additional party. No estimate of potential liability has been undertaken in this matter.

155

 
                   FirstEnergy is vigorously defending these actions, but cannot predict the outcome of any of these proceedings or whether any further regulatory proceedings or legal actions may be initiated against the Companies. Although unable to predict the impact of these proceedings, if FirstEnergy or its subsidiaries were ultimately determined to have legal liability in connection with these proceedings, it could have a material adverse effect on FirstEnergy's or its subsidiaries' financial condition, results of operations and cash flows.

New Accounting Standards and Interpretations

FSP FIN 46(R)-6 - “Determining the Variability to Be Considered in Applying FASB interpretation No. 46(R)”

In April 2006, the FASB issued FSP FIN 46(R)-6 that addresses how a reporting enterprise should determine the variability to be considered in applying FASB interpretation No. 46 (revised December 2003). FirstEnergy adopted FIN 46(R) in the first quarter of 2004, consolidating VIE’s when FirstEnergy or one of its subsidiaries is determined to be the VIE’s primary beneficiary. The variability that is considered in applying interpretation 46(R) affects the determination of (a) whether the entity is a VIE; (b) which interests are variable interests in the entity; and (c) which party, if any, is the primary beneficiary of the VIE. This FSP states that the variability to be considered shall be based on an analysis of the design of the entity, involving two steps:
 
Step 1:
Analyze the nature of the risks in the entity
Step 2:
Determine the purpose(s) for which the entity was created and determine the variability the entity is designed to create and pass along to its interest holders.

After determining the variability to consider, the reporting enterprise can determine which interests are designed to absorb that variability. The guidance in this FSP is applied prospectively to all entities (including newly created entities) with which that enterprise first becomes involved and to all entities previously required to be analyzed under interpretation 46(R) when a reconsideration event has occurred after July 1, 2006. Met-Ed does not expect this Statement to have a material impact on its financial statements.

FIN 48 - “Accounting for Uncertainty in Income Taxes - an interpretation of FASB Statement No. 109.”

In June 2006, the FASB issued FIN 48 which clarifies the accounting for uncertainty in income taxes recognized in an enterprise’s financial statements in accordance with FASB Statement No. 109, “Accounting for Income Taxes.” This interpretation prescribes a recognition threshold and measurement attribute for the financial statement recognition and measurement of a tax position taken or expected to be taken on a tax return. This interpretation also provides guidance on derecognition, classification, interest, penalties, accounting in interim periods, disclosure and transition. The evaluation of a tax position in accordance with this interpretation will be a two-step process. The first step will determine if it is more likely than not that a tax position will be sustained upon examination and should therefore be recognized. The second step will measure a tax position that meets the more likely than not recognition threshold to determine the amount of benefit to recognize in the financial statements. This interpretation is effective for fiscal years beginning after December 15, 2006. Met-Ed is currently evaluating the impact of this Statement.

156




PENNSYLVANIA ELECTRIC COMPANY        
           
CONSOLIDATED STATEMENTS OF INCOME AND COMPREHENSIVE INCOME        
(Unaudited)        
 
           
   
Three Months Ended
 
Six Months Ended
 
   
June 30,
 
June 30,
 
   
2006 
 
2005 
 
2006 
 
2005 
 
                       
   
(In thousands)
 
                       
REVENUES
 
$
264,999
 
$
262,097
 
$
556,751
 
$
556,026
 
                           
EXPENSES:
                         
Purchased power
   
146,875
   
139,292
   
308,516
   
289,549
 
Other operating costs
   
48,133
   
62,794
   
86,475
   
116,607
 
Provision for depreciation
   
11,798
   
12,479
   
24,441
   
24,985
 
Amortization of regulatory assets
   
12,979
   
13,118
   
27,794
   
26,303
 
Deferral of new regulatory assets
   
(11,815
)
 
-
   
(11,815
)
 
-
 
General taxes
   
17,458
   
16,134
   
36,847
   
34,340
 
Total expenses
   
225,428
   
243,817
   
472,258
   
491,784
 
                           
OPERATING INCOME
   
39,571
   
18,280
   
84,493
   
64,242
 
                           
OTHER INCOME (EXPENSE):
                         
Miscellaneous income
   
1,627
   
938
   
3,997
   
1,268
 
Interest expense
   
(11,599
)
 
(10,091
)
 
(22,135
)
 
(19,738
)
Capitalized interest
   
422
   
264
   
769
   
389
 
Total other income (expense)
   
(9,550
)
 
(8,889
)
 
(17,369
)
 
(18,081
)
                           
INCOME TAXES
   
14,564
   
3,554
   
28,518
   
18,940
 
                           
NET INCOME
   
15,457
   
5,837
   
38,606
   
27,221
 
                           
OTHER COMPREHENSIVE INCOME:
                         
Unrealized gain on derivative hedges
   
16
   
16
   
32
   
32
 
Unrealized loss on available for sale securities
   
(14
)
 
(18
)
 
(18
)
 
(21
)
Other comprehensive income (loss)
   
2
   
(2
)
 
14
   
11
 
Income tax expense (benefit) related to other
                         
comprehensive income
   
1
   
(6
)
 
7
   
-
 
Other comprehensive income, net of tax
   
1
   
4
   
7
   
11
 
                           
TOTAL COMPREHENSIVE INCOME
 
$
15,458
 
$
5,841
 
$
38,613
 
$
27,232
 
                           
The preceding Notes to Consolidated Financial Statements as they relate to Pennsylvania Electric Company are an integral part of these statements.
 
 
157

 

PENNSYLVANIA ELECTRIC COMPANY
 
   
CONSOLIDATED BALANCE SHEETS
 
(Unaudited)
 
   
June 30,
 
December 31,
 
   
2006
 
 2005
 
   
(In thousands)
 
ASSETS
           
CURRENT ASSETS:
           
Cash and cash equivalents
 
$
49
 
$
35
 
Receivables-
             
Customers (less accumulated provisions of $4,044,000 and $4,184,000,
             
respectively, for uncollectible accounts)
   
119,103
   
129,960
 
Associated companies
   
2,173
   
18,626
 
Other
   
9,625
   
12,800
 
Notes receivable from associated companies
   
21,090
   
17,624
 
Prepaid gross receipts taxes
   
22,626
   
-
 
Prepayments and other
   
3,874
   
7,936
 
     
178,540
   
186,981
 
UTILITY PLANT:
             
In service
   
2,095,438
   
2,043,885
 
Less - Accumulated provision for depreciation
   
793,523
   
784,494
 
     
1,301,915
   
1,259,391
 
Construction work in progress
   
27,761
   
30,888
 
     
1,329,676
   
1,290,279
 
OTHER PROPERTY AND INVESTMENTS:
             
Nuclear plant decommissioning trusts
   
115,252
   
113,368
 
Non-utility generation trusts
   
97,866
   
96,761
 
Other
   
531
   
918
 
     
213,649
   
211,047
 
DEFERRED CHARGES AND OTHER ASSETS:
             
Goodwill
   
877,651
   
882,344
 
Prepaid pension costs
   
92,307
   
89,637
 
Other
   
37,150
   
38,289
 
     
1,007,108
   
1,010,270
 
   
$
2,728,973
 
$
2,698,577
 
LIABILITIES AND CAPITALIZATION
             
CURRENT LIABILITIES:
             
Short-term borrowings-
             
Associated companies
 
$
220,801
 
$
261,159
 
Other
   
67,000
   
-
 
Accounts payable-
             
Associated companies
   
16,256
   
33,770
 
Other
   
46,783
   
38,277
 
Accrued taxes
   
17,148
   
27,905
 
Accrued interest
   
9,094
   
8,905
 
Other
   
17,796
   
19,756
 
     
394,878
   
389,772
 
CAPITALIZATION:
             
Common stockholder's equity-
             
Common stock, $20 par value, authorized 5,400,000 shares-
             
5,290,596 shares outstanding
   
105,812
   
105,812
 
Other paid-in capital
   
1,197,889
   
1,202,551
 
Accumulated other comprehensive loss
   
(302
)
 
(309
)
Retained earnings
   
64,429
   
25,823
 
Total common stockholder's equity
   
1,367,828
   
1,333,877
 
Long-term debt and other long-term obligations
   
476,904
   
476,504
 
     
1,844,732
   
1,810,381
 
NONCURRENT LIABILITIES:
             
Regulatory liabilities
   
135,494
   
162,937
 
Accumulated deferred income taxes
   
119,912
   
106,871
 
Retirement benefits
   
105,980
   
102,046
 
Asset retirement obligation
   
74,574
   
72,295
 
Other
   
53,403
   
54,275
 
     
489,363
   
498,424
 
COMMITMENTS AND CONTINGENCIES (Note 10)
             
   
$
2,728,973
 
$
2,698,577
 
               
The preceding Notes to Consolidated Financial Statements as they relate to Pennsylvania Electric Company are an integral part of these balance sheets.
 
 
158


 
PENNSYLVANIA ELECTRIC COMPANY
 
   
CONSOLIDATED STATEMENTS OF CASH FLOWS
 
(Unaudited)
 
            
   
Six Months Ended
 
   
June 30,
 
   
2006
 
2005
 
   
(In thousands)
 
            
CASH FLOWS FROM OPERATING ACTIVITIES:
          
Net income
 
$
38,606
 
$
27,221
 
Adjustments to reconcile net income to net cash from operating activities -
             
Provision for depreciation
   
24,441
   
24,985
 
Amortization of regulatory assets
   
27,794
   
26,303
 
Deferral of new regulatory assets
   
(11,815
)
 
-
 
Deferred costs recoverable as regulatory assets
   
(54,092
)
 
(35,946
)
Deferred income taxes and investment tax credits, net
   
13,206
   
2,647
 
Accrued retirement benefit obligations
   
1,264
   
1,905
 
Accrued compensation, net
   
(371
)
 
(2,386
)
Decrease (increase) in operating assets -
             
Receivables
   
30,485
   
79,602
 
Prepayments and other current assets
   
(18,565
)
 
(22,107
)
Increase (decrease) in operating liabilities -
             
Accounts payable
   
(9,008
)
 
(20,333
)
Accrued taxes
   
(10,756
)
 
10,728
 
Accrued interest
   
190
   
(34
)
Other
   
8,817
   
4,365
 
 Net cash provided from operating activities
   
40,196
   
96,950
 
               
CASH FLOWS FROM FINANCING ACTIVITIES:
             
New Financing -
             
Short-term borrowings, net
   
26,642
   
-
 
Redemptions and Repayments -
             
Long-term debt
   
-
   
(3,521
)
Short-term borrowings, net
   
-
   
(36,608
)
Dividend Payments -
             
Common stock
   
-
   
(30,000
)
 Net cash provided from (used for) financing activities
   
26,642
   
(70,129
)
               
CASH FLOWS FROM INVESTING ACTIVITIES:
             
Property additions
   
(60,747
)
 
(33,683
)
Loan repayments from (loans to) associated companies, net
   
(3,466
)
 
7,011
 
Proceeds from nuclear decommissioning trust fund sales
   
51,536
   
24,127
 
Investments in nuclear decommissioning trust funds
   
(51,536
)
 
(24,127
)
Other, net
   
(2,611
)
 
(150
)
 Net cash used for investing activities
   
(66,824
)
 
(26,822
)
               
Net increase (decrease) in cash and cash equivalents
   
14
   
(1
)
Cash and cash equivalents at beginning of period
   
35
   
36
 
Cash and cash equivalents at end of period
 
$
49
 
$
35
 
 
             
The preceding Notes to Consolidated Financial Statements as they relate to Pennsylvania Electric Company are an integral part of these statements.

 

159

 
 
 
Report of Independent Registered Public Accounting Firm









To the Stockholder and Board of
Directors of Pennsylvania Electric Company:

We have reviewed the accompanying consolidated balance sheet of Pennsylvania Electric Company and its subsidiaries as of June 30, 2006, and the related consolidated statements of income and comprehensive income for each of the three-month and six-month periods ended June 30, 2006 and 2005 and the consolidated statement of cash flows for the six-month period ended June 30, 2006 and 2005. These interim financial statements are the responsibility of the Company’s management.

We conducted our review in accordance with the standards of the Public Company Accounting Oversight Board (United States). A review of interim financial information consists principally of applying analytical procedures and making inquiries of persons responsible for financial and accounting matters. It is substantially less in scope than an audit conducted in accordance with the standards of the Public Company Accounting Oversight Board, the objective of which is the expression of an opinion regarding the financial statements taken as a whole. Accordingly, we do not express such an opinion.

Based on our review, we are not aware of any material modifications that should be made to the accompanying consolidated interim financial statements for them to be in conformity with accounting principles generally accepted in the United States of America.

We have previously audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated balance sheet as of December 31, 2005, and the related consolidated statements of income, capitalization, common stockholder’s equity, preferred stock, cash flows and taxes for the year then ended (not presented herein), and in our report [which contained references to the Company’s change in its method of accounting for asset retirement obligations as of January 1, 2003 and conditional asset retirement obligations as of December 31, 2005 as discussed in Note 2(G) and Note 9 to those consolidated financial statements] dated February 27, 2006, we expressed an unqualified opinion on those consolidated financial statements. In our opinion, the information set forth in the accompanying consolidated balance sheet as of December 31, 2005, is fairly stated in all material respects in relation to the consolidated balance sheet from which it has been derived.




PricewaterhouseCoopers LLP
Cleveland, Ohio
August 4, 2006



160


PENNSYLVANIA ELECTRIC COMPANY

MANAGEMENT’S DISCUSSION AND ANALYSIS OF
RESULTS OF OPERATIONS AND FINANCIAL CONDITION


Penelec is a wholly owned electric utility subsidiary of FirstEnergy. Penelec conducts business in northern, western and south central Pennsylvania, providing regulated transmission and distribution services. Penelec also provides generation services to those customers electing to retain Penelec as their power supplier.

Results of Operations

Net income in the second quarter of 2006 increased to $15 million, compared to $6 million in the second quarter of 2005. In the first six months of 2006, net income increased to $39 million, compared to $27 million in the first six months of 2005. The increase in net income for both periods resulted from lower other operating costs, deferral of new regulatory assets, and higher revenues which were partially offset by higher purchased power costs, general taxes and interest expense, as discussed below.

Revenues

Revenues increased by $3 million in the second quarter of 2006 and $1 million in the first six months of 2006, compared to the same periods of 2005. Increases in both periods were due primarily to higher retail generation revenues partially offset by lower transmission and distribution revenues. Retail generation revenues increased by $12 million in the second quarter of 2006 and $23 million for the first six months of 2006 primarily due to higher KWH sales to industrial customers and higher composite unit prices in all customer classes. Industrial sales increased $8 million for the second quarter of 2006 and $15 million for the first six months of 2006 primarily due to the return of customers to Penelec from alternative suppliers. Generation service provided by alternative suppliers as a percent of total industrial sales in Penelec’s service area decreased by 12.1 percentage points and 13.2 percentage points in the second quarter and the first six months of 2006, respectively. The higher composite unit prices also increased generation revenues from residential customers by $1 million and $3 million and from commercial customers by $3 million and $5 million in the second quarter and first six months of 2006, respectively.

Distribution revenues decreased by $1 million in the second quarter of 2006 and by $3 million in the first six months of 2006, compared with the same periods of 2005. The decreases were primarily due to 1.1% and 1.9% decreases in KWH deliveries in the second quarter and first six months of 2006, respectively. Reduced KWH deliveries reflected milder temperatures in both periods of 2006 compared with the same periods of 2005. Those reductions were partially offset by slightly higher composite unit prices during the periods. Transmission revenues decreased by $8 million in the second quarter of 2006 and $20 million in the first six months of 2006 due to lower transmission load requirements and lower prices. The decreased loads for the first six months of 2006 (and related lower congestion revenues) resulted from milder temperatures, as demonstrated by a 40.4% decrease in cooling degree days and a 14.4% decrease in heating degree days compared to the same period in 2005, which resulted in decreased transmission expenses discussed further below. For the first six months of 2006, other revenues also increased for a payment received in the first quarter of 2006 under a contract provision associated with the prior sale of TMI Unit 1. Under the contract, additional payments are received if subsequent energy prices rise above specified levels, which occurred. This payment was credited to Penelec’s customers, resulting in no net earnings effect.

Changes in KWH sales by customer class in the second quarter and first six months of 2006 compared to the respective periods in 2005 are summarized in the following table:

   
Three
 
Six
 
Changes in KWH Sales
 
Months
 
Months
 
Increase (Decrease)
 
 
 
 
 
Retail Electric Generation:
 
 
 
 
 
Residential
 
 
(1.9
)%
 
(2.1
)%
Commercial
 
 
-
 
 
(0.7
)%
Industrial
 
 
     14.8
%
 
14.9
%
Total Retail Electric Generation Sales
 
 
3.8
%
 
3.3
%
           
Distribution Deliveries:
   
 
 
 
Residential
 
 
(2.1
)%
 
(2.2
)%
Commercial
 
 
(1.0
)%
 
(1.7
)%
Industrial
 
 
(0.5
)%
 
(1.8
)%
Total Distribution Deliveries
 
 
(1.1
)%
 
(1.9
)%
 
 
 
 
 
 
 
 

161


Expenses

Total expenses decreased by $19 million or 7.5% in the second quarter of 2006 and $20 million or 4.0% in the first six months of 2006 compared with the same periods in 2005. The following table presents changes from the prior year by expense category:

   
Three
 
Six
Expenses Changes
 
Months
 
Months
   
(In millions)
Increase (Decrease)
 
 
 
 
Purchased power costs
 
$
 
$
19 
Other operating costs
 
 
(15)
 
 
(30)
Provision for depreciation
 
 
(1)
 
 
(1)
Amortization of regulatory assets
 
 
-
 
 
Deferral of new regulatory assets
   
(12)
   
(12)
General taxes
   
   
Net decrease in expenses
 
$
(19)
 
$
(20)
 
 
 
 
 
 
 

Purchased power costs increased by $8 million or 5.4% in the second quarter and $19 million or 6.6% in the first six months of 2006 compared to the same periods in 2005. The increases in both periods were primarily attributable to higher unit costs from non-affiliated suppliers and increased KWH purchased to meet retail generation sales requirements. These increases were partially offset by increased NUG expense deferrals of $4 million in both the second quarter and in the first six months of 2006. Other operating costs decreased due to lower transmission expenses resulting from lower congestion charges. Expenses were further reduced due to higher levels of construction activities in the second quarter of 2006 compared to a higher level of maintenance activities in the same period of 2005 for energy delivery operations and reliability initiatives. The deferral of new regulatory assets of $12 million reflected the May 4, 2006 PPUC approval of Penelec’s request to defer certain 2006 transmission-related costs. Penelec implemented the deferral accounting in the second quarter of 2006, which included $4 million for costs incurred in the first quarter of 2006 (see Regulatory Matters for further discussion). For both periods, general taxes increased primarily due to higher Pennsylvania gross receipt taxes.

Capital Resources and Liquidity

Penelec’s cash requirements in 2006 for expenses, construction expenditures and scheduled debt maturities, are expected to be met by a combination of cash from operations and short-term credit arrangements.

Changes in Cash Position

As of June 30, 2006, Penelec had $49,000 of cash and cash equivalents compared with $35,000 as of December 31, 2005. The major sources for changes in these balances are summarized below.

Cash Flows From Operating Activities

Cash provided from operating activities in the first six months of 2006 and 2005 were as follows:

 
 
Six Months Ended
 
 
June 30,
 Operating Cash Flows
 
2006
 
2005
   
(In millions)
 
 
 
 
 
Cash earnings (1)
 
$
39
 
$
45
Working capital and other
 
 
1
 
 
52
Net cash provided from operating activities
 
$
40
 
$
97
 
 
 
 
 
 
 
(1) Cash earnings are a non-GAAP measure (see reconciliation below).

Cash earnings (in the table above) are not a measure of performance calculated in accordance with GAAP. Penelec believes that cash earnings are a useful financial measure because it provides investors and management with an additional means of evaluating its cash-based operating performance.

162



 
 
Six Months Ended
 
 
 
June 30,
 
 Reconciliation of Cash Earnings
 
2006
 
2005
 
 
 
(In millions)
 
           
Net income (GAAP)
 
$
39
 
$
27
 
Non-cash charges (credits):
 
 
   
 
 
 
Provision for depreciation
 
 
24
 
 
25
 
Amortization of regulatory assets
 
 
28
 
 
26
 
Deferral of new regulatory assets
   
(12
 
-
 
Deferred costs recoverable as regulatory assets
 
 
(54
 
(36
Deferred income taxes and investment tax credits, net
 
 
13
 
 
3
 
Other non-cash items
 
 
1
 
 
-
 
Cash earnings (Non-GAAP)
 
$
39
 
$
45
 
 
 
 
 
 
 
 
 

The $6 million decrease in cash earnings is described above under “Results of Operations.” The $51 million decrease from working capital primarily resulted from a decrease of $49 million in cash provided from the settlement of receivables and a $21 million decrease in accrued taxes, partially offset by decreased outflows of $11 million for accounts payable and $4 million for prepayments.

Cash Flows From Financing Activities

Net cash provided from financing activities was $27 million in the first six months of 2006 compared to net cash used for financing activities of $70 million in the first six months of 2005. The change reflects a $63 million increase in short-term borrowings, a $30 million reduction in common stock dividend payments to FirstEnergy and a $4 million decrease in long-term debt redemptions.

Penelec had approximately $21 million of cash and temporary investments (which includes short-term notes receivable from associated companies) and approximately $288 million of short-term indebtedness as of June 30, 2006. Penelec has authorization from the SEC, continued by FERC rules adopted as a result of EPACT's repeal of PUHCA, to incur short-term debt of up to $250 million and authorization from the PPUC to incur money pool borrowings of up to $300 million. In addition, Penelec has $75 million of available accounts receivable financing facilities as of June 30, 2006 through Penelec Funding, Penelec's wholly owned subsidiary. As a separate legal entity with separate creditors, Penelec Funding would have to satisfy its obligations to creditors before any of its remaining assets could be made available to Penelec. As of June 30, 2006 the facility was drawn for $67 million. In June 2006, the facility was renewed until July 28, 2007. The annual facility fee is 0.125% on the entire finance limit.

Penelec will not issue FMB other than as collateral for senior notes, since its senior note indentures prohibit (subject to certain exceptions) Penelec from issuing any debt which is senior to the senior notes. As of June 30, 2006, Penelec had the ability to issue $50 million of additional senior notes based upon FMB collateral. Penelec has no restrictions on the issuance of preferred stock.

Penelec, FirstEnergy, OE, Penn, CEI, TE, JCP&L, Met-Ed, FES and ATSI, as Borrowers, have entered into a syndicated $2 billion five-year revolving credit facility which expires in June 2010. Borrowings under the facility are available to each Borrower separately and mature on the earlier of 364 days from the date of borrowing or the commitment termination date, as the same may be extended. Penelec's borrowing limit under the facility is $250 million.

Under the revolving credit facility, borrowers may request the issuance of LOCs expiring up to one year from the date of issuance. The stated amount of outstanding LOCs will count against total commitments available under the facility and against the applicable borrower’s borrowing sub-limit. Total unused borrowing capability under existing credit facilities and accounts receivable financing facilities totaled $258 million.

The revolving credit facility contains financial covenants requiring each borrower to maintain a consolidated debt to total capitalization ratio of no more than 65%. As of June 30, 2006, Penelec’s debt to total capitalization as defined under the revolving credit facility was 36%.

The facility does not contain any provisions that either restrict Penelec's ability to borrow or accelerate repayment of outstanding advances as a result of any change in its credit ratings. Pricing is defined in “pricing grids”, whereby the cost of funds borrowed under the facility is related to Penelec's credit ratings.

163

 
                   Penelec has the ability to borrow from its regulated affiliates and FirstEnergy to meet its short-term working capital requirements. FESC administers this money pool and tracks surplus funds of FirstEnergy and its regulated subsidiaries. Companies receiving a loan under the money pool agreements must repay the principal, together with accrued interest, within 364 days of borrowing the funds. The rate of interest is the same for each company receiving a loan from the pool and is based on the average cost of funds available through the pool. The average interest rate for borrowings under these arrangements in the first six months of 2006 was 4.86%.

Penelec’s access to capital markets and costs of financing are dependent on the ratings of its securities and that of FirstEnergy. The ratings outlook from S&P on all securities is stable. The ratings outlook from Moody's and Fitch on all securities is positive.

Cash Flows From Investing Activities
 
                   In the first six months of 2006, net cash used for investing activities totaled $67 million compared to $27 million in the first six months of 2005. The increase primarily resulted from $27 million in increased property additions and a $10 million increase in loans to associated companies. Expenditures for property additions primarily support Penelec’s energy delivery operations and reliability initiatives.

During the last half of 2006, capital requirements for property additions are expected to be approximately $46 million. Penelec’s capital spending for the period 2006-2010 is expected to be approximately $496 million, of which approximately $110 million applies to 2006. The capital spending is primarily for property additions supporting the distribution of electricity.

Market Risk Information
 
                   Penelec uses various market risk sensitive instruments, including derivative contracts, primarily to manage the risk of price and interest rate fluctuations. FirstEnergy’s Risk Policy Committee, comprised of members of senior management, provides general oversight to risk management activities throughout the Company.

Commodity Price Risk

Penelec is exposed to market risk primarily due to fluctuations in electricity, energy transmission, natural gas, coal, and emission prices. To manage the volatility relating to these exposures, Penelec uses a variety of non-derivative and derivative instruments, including forward contracts, options, futures contracts and swaps. The derivatives are used principally for hedging purposes. All derivatives that fall within the scope of SFAS 133 must be recorded at their fair value and marked to market. The majority of Penelec’s derivative hedging contracts qualify for the normal purchase and normal sale exception under SFAS 133. Contracts that are not exempt from such treatment include purchase power agreements with NUG entities that were structured pursuant to the Public Utility Regulatory Policy Act of 1978. These non-trading contracts are adjusted to fair value at the end of each quarter, with a corresponding regulatory asset recognized for above-market costs. On April 1, 2006, Penelec elected to apply the normal purchase and normal sale exception to certain NUG power purchase agreements with a fair value of $14 million (included in “Other” in the table below) in accordance with guidance in DIG C20. The change in the fair value of commodity derivative contracts related to energy production during the second quarter and first six months of 2006 is summarized in the following table:

   
Three Months Ended
 
Six Months Ended
Increase (Decrease) in the Fair Value
 
June 30, 2006
 
June 30, 2006
of Commodity Derivative Contracts
 
Non-Hedge
 
Hedge
 
Total
 
Non-Hedge
 
Hedge
 
Total
 
 
(In millions)
Change in the Fair Value of
 
 
 
 
 
 
 
 
 
 
 
 
Commodity Derivative Contracts:
 
 
 
 
 
 
 
 
 
 
 
 
Outstanding net asset at beginning of period
 
$
             30
 
$
-
 
$
             30
 
$
             27
 
$
-
 
$
             27
New contract value when entered
 
 
   
 
-
 
 
-
 
 
-  
  
 
-
 
 
-
Additions/change in value of existing contracts
 
 
 
 
-
 
 
-
 
 
  
 
-
 
 
              2
Change in techniques/assumptions
 
 
 
 
-
 
 
-
 
 
 
 
-
 
 
-
Settled contracts
 
 
(4)
 
 
-
 
 
(4)
 
 
(3)
 
 
-
 
 
(3)
Other
 
 
(14)
 
 
-
 
 
(14)
 
 
(14)
 
 
-
 
 
(14)
Net Assets - Derivative Contracts
at End of Period (1)
 
$
             12
 
$
-
 
$
             12
 
$
             12
 
$
-
 
$
             12
 
 
 
   
 
   
 
   
 
   
 
   
 
 
Impact of Changes in Commodity Derivative Contracts(3)
 
 
   
 
   
 
   
 
   
 
   
 
 
Income Statement effects (pre-tax)
 
$
(4)
 
$
-
 
$
(4)
 
$
(4)
 
$
-
 
$
(4)
Balance Sheet effects:
 
 
   
 
   
 
   
 
   
 
   
 
 
OCI (pre-tax)
 
$
-
 
$
-
 
$
-
 
$
-
 
$
-
 
$
-  
Regulatory liability
 
$
-
 
$
-
 
$
-
 
$
3
 
$
-
 
$
               3
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
(1) Includes $11 million in a non-hedge commodity derivative contract which is offset by a regulatory liability.
(2) Represents the increase in value of existing contracts, settled contracts and changes in techniques/assumptions.

164


Derivatives are included on the Consolidated Balance Sheet as of June 30, 2006 as follows:

Balance Sheet Classification
 
Non-Hedge
 
Hedge
 
Total
   
(In millions)
Non-Current-
                 
Other deferred charges
   
12
   
-
   
12
Other noncurrent liabilities
   
-
   
-
   
-
                   
Net assets
 
$
12
 
$
-
 
$
12

The valuation of derivative contracts is based on observable market information to the extent that such information is available. In cases where such information is not available, Penelec relies on model-based information. The model provides estimates of future regional prices for electricity and an estimate of related price volatility. Penelec uses these results to develop estimates of fair value for financial reporting purposes and for internal management decision making. Sources of information for the valuation of commodity derivative contracts as of June 30, 2006 are summarized by year in the following table:

Source of Information
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Fair Value by Contract Year
 
2006(1)
 
2007
 
2008
 
2009
 
2010
 
Thereafter
 
Total
 
 
(In millions)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Other external sources (2)
 
$
3
 
$
3
 
$
2
 
$
-
 
 $
-
 
$
-
 
$
8
Prices based on models(3)
 
 
-
 
 
-
 
 
-
 
 
2
 
 
2
 
 
-
 
 
4
 
 
 
   
 
   
 
   
 
 
 
 
 
 
 
 
 
 
 
Total(3)
 
$
3
 
$
3
 
$
2
 
$
2
 
 $
2
 
$
-
 
$
12

(1) For the last two quarters of 2006.
(2) Broker quote sheets.
(3) Includes $11 million from a non-hedge commodity derivative contract that is offset by a regulatory liability and does not affect earnings.

Penelec performs sensitivity analyses to estimate its exposure to the market risk of its commodity positions. A hypothetical 10% adverse shift in quoted market prices in the near term on both of Penelec's trading and non-trading derivative instruments would not have had a material effect on its consolidated financial position or cash flows as of June 30, 2006. Penelec estimates that if energy commodity prices experienced an adverse 10% change, net income for the next 12 months would not change, as the prices for all commodity positions are already above the contract price caps.

Equity Price Risk

Included in nuclear decommissioning trusts are marketable equity securities carried at their current fair value of approximately $64 million and $62 million as of June 30, 2006 and December 31, 2005, respectively. A hypothetical 10% decrease in prices quoted by stock exchanges would result in a $6 million reduction in fair value as of June 30, 2006.

Regulatory Matters

Regulatory assets and liabilities are costs which have been authorized by the PPUC and the FERC for recovery from or credit to customers in future periods and, without such authorization, would have been charged or credited to income when incurred. Penelec’s net regulatory liabilities were approximately $135 million and $163 million as of June 30, 2006 and December 31, 2005, respectively, and are included under Noncurrent Liabilities on the Consolidated Balance Sheets.
 
                   A February 2002 Commonwealth Court of Pennsylvania decision affirmed the June 2001 PPUC decision regarding approval of the FirstEnergy/GPU merger, remanded the issues of quantification and allocation of merger savings to the PPUC and denied Met-Ed and Penelec the rate relief initially approved in the PPUC decision. On October 2, 2003, the PPUC issued an order concluding that the Commonwealth Court reversed the PPUC’s June 2001 order in its entirety. In accordance with the PPUC’s direction, Met-Ed and Penelec filed supplements to their tariffs that became effective in October 2003 and that reflected the CTC rates and shopping credits in effect prior to the June 2001 order.

Met-Ed’s and Penelec’s combined portion of total net merger savings during 2001 - 2004 is estimated to be approximately $51 million. A procedural schedule was established by the ALJ on January 17, 2006 and the companies filed initial testimony on March 1, 2006. On May 4, 2006, the PPUC consolidated this proceeding with the April 10, 2006 comprehensive rate filing proceeding discussed below. Met-Ed and Penelec are unable to predict the outcome of this matter.

165


In an October 16, 2003 order, the PPUC approved September 30, 2004 as the date for Met-Ed's and Penelec's NUG trust fund refunds. The PPUC order also denied their accounting treatment request regarding the CTC rate/shopping credit swap by requiring Met-Ed and Penelec to treat the stipulated CTC rates that were in effect from January 1, 2002 on a retroactive basis. On October 22, 2003, Met-Ed and Penelec filed an Objection with the Commonwealth Court asking that the Court reverse this PPUC finding; a Commonwealth Court judge subsequently denied their Objection on October 27, 2003 without explanation. On October 31, 2003, Met-Ed and Penelec filed an Application for Clarification of the Court order with the Commonwealth Court, a Petition for Review of the PPUC's October 2 and October 16, 2003 Orders, and an Application for Reargument, if the judge, in his clarification order, indicates that Met-Ed's and Penelec's Objection was intended to be denied on the merits. The Reargument Brief before the Commonwealth Court was filed on January 28, 2005. Oral arguments were held on June 8, 2006. On July 19, 2006, the Commonwealth Court issued its decision affirming the PPUC’s prior orders. Although the decision denied the appeal of Met-Ed and Penelec, they had previously accounted for the treatment of costs required by the PPUC’s October 2003 orders.

On November 18, 2004, the FERC issued an order eliminating the RTOR for transmission service between the MISO and PJM regions. The FERC also ordered the MISO, PJM and the transmission owners within MISO and PJM to submit compliance filings containing a SECA mechanism to recover lost RTOR revenues during a 16-month transition period from load serving entities. The FERC issued orders in 2005 setting the SECA for hearing. ATSI, JCP&L, Met-Ed, Penelec, and FES continue to be involved in the FERC hearings concerning the calculation and imposition of the SECA charges. The hearing was held in May 2006. Initial briefs were submitted on June 9, 2006, and reply briefs were filed on June 27, 2006. The FERC has ordered the Presiding Judge to issue an initial decision by August 11, 2006.
 
                    On January 31, 2005, certain PJM transmission owners made three filings with the FERC pursuant to a settlement agreement previously approved by the FERC. JCP&L, Met-Ed and Penelec were parties to that proceeding and joined in two of the filings. In the first filing, the settling transmission owners submitted a filing justifying continuation of their existing rate design within the PJM RTO. In the second filing, the settling transmission owners proposed a revised Schedule 12 to the PJM tariff designed to harmonize the rate treatment of new and existing transmission facilities. Interventions and protests were filed on February 22, 2005. In the third filing, Baltimore Gas and Electric Company and Pepco Holdings, Inc. requested a formula rate for transmission service provided within their respective zones. On May 31, 2005, the FERC issued an order on these cases. First, it set for hearing the existing rate design and indicated that it will issue a final order within six months. American Electric Power Company, Inc. filed in opposition proposing to create a "postage stamp" rate for high voltage transmission facilities across PJM. Second, the FERC approved the proposed Schedule 12 rate harmonization. Third, the FERC accepted the proposed formula rate, subject to refund and hearing procedures. On June 30, 2005, the settling PJM transmission owners filed a request for rehearing of the May 31, 2005 order. On March 20, 2006, a settlement was filed with FERC in the formula rate proceeding that generally accepts the companies' formula rate proposal. The FERC issued an order approving this settlement on April 19, 2006. Hearings in the PJM rate design case concluded in April 2006. On July 13, 2006, an Initial Decision was issued by the ALJ. The ALJ adopted the Trial Staff’s position that the cost of all PJM transmission facilities should be recovered through a postage stamp rate. The ALJ recommended an April 1, 2006 effective date for this change in rate design. If the FERC accepts this recommendation, the transmission rate applicable to many load zones in PJM would increase. FirstEnergy believes that significant additional transmission revenues would have to be recovered from the JCP&L, Met-Ed and Penelec transmission zones within PJM. The Companies, as part of the Responsible Pricing Alliance, intend to submit a brief on exceptions within thirty days of the initial decision. Following submission of reply exceptions, the case is expected to be reviewed by the FERC with a decision anticipated in the fourth quarter of 2006.

On January 12, 2005, Met-Ed and Penelec filed, before the PPUC, a request for deferral of transmission-related costs beginning January 1, 2005. The OCA, OSBA, OTS, MEIUG, PICA, Allegheny Electric Cooperative and Pennsylvania Rural Electric Association all intervened in the case. Met-Ed and Penelec sought to consolidate this proceeding (and modified their request to provide deferral of 2006 transmission-related costs only) with the comprehensive rate filing they made on April 10, 2006 as described below. On May 4, 2006, the PPUC approved the modified request. Accordingly, Penelec deferred approximately $12 million, representing transmission costs that were incurred from January 1, 2006 through June 30, 2006. On June 5, 2006, the OCA filed before the Commonwealth Court a petition for review of the PPUC’s approval of the deferral. On July 12, 2006, the Commonwealth Court granted the PPUC’s motion to quash the OCA’s appeal. The ratemaking treatment of the deferrals will be determined in the comprehensive rate filing proceeding discussed further below.

Met-Ed and Penelec purchase a portion of their PLR requirements from FES through a wholesale power sales agreement. Under this agreement, FES retains the supply obligation and the supply profit and loss risk for the portion of power supply requirements not self-supplied by Met-Ed and Penelec under their contracts with NUGs and other unaffiliated suppliers. The FES arrangement reduces Met-Ed's and Penelec's exposure to high wholesale power prices by providing power at a fixed price for their uncommitted PLR energy costs during the term of the agreement with FES. The wholesale power sales agreement with FES could automatically be extended for each successive calendar year unless any party elects to cancel the agreement by November 1 of the preceding year. On November 1, 2005, FES and the other parties thereto amended the agreement to provide FES the right in 2006 to terminate the agreement at any time upon 60 days notice. On April 7, 2006, the parties to the wholesale power sales agreement entered into a Tolling Agreement that arises out of FES’ notice to Met-Ed and Penelec that FES elected to exercise its right to terminate the wholesale power sales agreement effective midnight December 31, 2006, because that agreement is not economically sustainable to FES.

166

 
                    In lieu of allowing such termination to become effective as of December 31, 2006, the parties agreed, pursuant to the Tolling Agreement, to amend the wholesale power sales agreement to provide as follows:
 
1.   The termination provisions of the wholesale power sales agreement will be tolled for one year until December 31, 2007, provided that during such tolling period:

  a.   FES will be permitted to terminate the wholesale power sales agreement at any time with sixty days written notice;
  b.  Met-Ed and Penelec will procure through arrangements other than the wholesale power sales agreement beginning December 1, 2006 and ending December 31, 2007, approximately 33% of the amounts of capacity and energy necessary to satisfy their PLR obligations for which Committed Resources (i.e., non-utility generation under contract to Met-Ed and Penelec, Met-Ed- and Penelec-owned generating facilities, purchased power contracts and distributed generation) have not been obtained; and
  c. FES will not be obligated to supply additional quantities of capacity and energy in the event that a supplier of Committed Resources defaults on its supply agreement.

2.   During the tolling period, FES will not act as an agent for Met-Ed or Penelec in procuring the services under 1.(b) above; and

3.  
The pricing provision of the wholesale power sales agreement shall remain unchanged provided Met-Ed and Penelec comply with the provisions of the Tolling
Agreement and any applicable provision of the wholesale power sales agreement.

                   In the event that FES elects not to terminate the wholesale power sales agreement effective midnight December 31, 2007, similar tolling agreements effective after December 31, 2007 are expected to be considered by FES for subsequent years if Met-Ed and Penelec procure through arrangements other than the wholesale power sales agreement approximately 64%, 83% and 95% of the additional amounts of capacity and energy necessary to satisfy their PLR obligations for 2008, 2009 and 2010, respectively, for which Committed Resources have not been obtained from the market.

The wholesale power sales agreement, as modified by the Tolling Agreement, requires Met-Ed and Penelec to satisfy the portion of their PLR obligations currently supplied by FES from unaffiliated suppliers at prevailing prices, which are likely to be higher than the current price charged by FES under the current agreement and, as a result, Met-Ed’s and Penelec’s purchased power costs could materially increase. If Met-Ed and Penelec were to replace the entire FES supply at current market power prices without corresponding regulatory authorization to increase their generation prices to customers, each company would likely incur a significant increase in operating expenses and experience a material deterioration in credit quality metrics. Under such a scenario, each company's credit profile would no longer be expected to support an investment grade rating for its fixed income securities. There can be no assurance, however, that if FES ultimately determines to terminate, or significantly modify the agreement, timely regulatory relief will be granted by the PPUC pursuant to the April 10, 2006 comprehensive rate filing discussed below, or, to the extent granted, adequate to mitigate such adverse consequences.

Penelec made a comprehensive rate filing with the PPUC on April 10, 2006 that addresses a number of transmission, distribution and supply issues. If Penelec's preferred approach involving accounting deferrals is approved, the filing would increase annual revenues by $157 million. That filing includes, among other things, a request to charge customers for an increasing amount of market-priced power procured through a CBP as the amount of supply provided under the existing FES agreement is phased out in accordance with the April 7, 2006 Tolling Agreement described above. Penelec also requested approval of the January 12, 2005 petition for the deferral of transmission-related costs discussed above, but only for those costs incurred during 2006. In this rate filing, Penelec also requested recovery of annual transmission and related costs incurred on or after January 1, 2007, plus the amortized portion of 2006 costs over a ten-year period, along with applicable carrying charges, through an adjustable rider similar to that implemented in Ohio. The filing contemplates an increase in distribution rates for Penelec of $20 million annually. The PPUC suspended the effective date (June 10, 2006) of these rate changes for seven months after the filing as permitted under Pennsylvania law. If the PPUC adopts the overall positions taken in the intervenors’ testimony as filed, this would have a material adverse effect on the financial statements of FirstEnergy, Met-Ed and Penelec. Hearings are scheduled for late August 2006 and a PPUC decision is expected early in the first quarter of 2007.

See Note 11 to the consolidated financial statements for further details and a complete discussion of regulatory matters in Pennsylvania, including a more detailed discussion of reliability initiatives, including actions by the PPUC that impact Penelec.

167


Environmental Matters 

Penelec accrues environmental liabilities when it concludes that it is probable that it has an obligation for such costs and can reasonably determine the amount of such costs. Unasserted claims are reflected in Penelec's determination of environmental liabilities and are accrued in the period that they are both probable and reasonably estimable.

Penelec has been named a PRP at waste disposal sites, which may require cleanup under the Comprehensive Environmental Response, Compensation and Liability Act of 1980. Allegations of disposal of hazardous substances at historical sites and the liability involved are often unsubstantiated and subject to dispute; however, federal law provides that all PRPs for a particular site are liable on a joint and several basis. Therefore, environmental liabilities that are considered probable have been recognized on the Consolidated Balance Sheet as of June 30, 2006, based on estimates of the total costs of cleanup, Penelec’s proportionate responsibility for such costs and the financial ability of other unaffiliated entities to pay.

Other Legal Proceedings

There are various lawsuits, claims (including claims for asbestos exposure) and proceedings related to Penelec’s normal business operations pending against Penelec. The other material items not otherwise discussed below are described in Note 10(C) to the consolidated financial statements.

Power Outages and Related Litigation
 
                   On August 14, 2003, various states and parts of southern Canada experienced widespread power outages. The outages affected approximately 1.4 million customers in FirstEnergy's service area. The U.S. - Canada Power System Outage Task Force’s final report in April 2004 on the outages concluded, among other things, that the problems leading to the outages began in FirstEnergy’s Ohio service area. Specifically, the final report concluded, among other things, that the initiation of the August 14, 2003 power outages resulted from an alleged failure of both FirstEnergy and ECAR to assess and understand perceived inadequacies within the FirstEnergy system; inadequate situational awareness of the developing conditions; and a perceived failure to adequately manage tree growth in certain transmission rights of way. The Task Force also concluded that there was a failure of the interconnected grid's reliability organizations (MISO and PJM) to provide effective real-time diagnostic support. The final report is publicly available through the Department of Energy’s Web site (www.doe.gov). FirstEnergy believes that the final report does not provide a complete and comprehensive picture of the conditions that contributed to the August 14, 2003 power outages and that it does not adequately address the underlying causes of the outages. FirstEnergy remains convinced that the outages cannot be explained by events on any one utility's system. The final report contained 46 “recommendations to prevent or minimize the scope of future blackouts.” Forty-five of those recommendations related to broad industry or policy matters while one, including subparts, related to activities the Task Force recommended be undertaken by FirstEnergy, MISO, PJM, ECAR, and other parties to correct the causes of the August 14, 2003 power outages. FirstEnergy implemented several initiatives, both prior to and since the August 14, 2003 power outages, which were independently verified by NERC as complete in 2004 and were consistent with these and other recommendations and collectively enhance the reliability of its electric system. FirstEnergy’s implementation of these recommendations in 2004 included completion of the Task Force recommendations that were directed toward FirstEnergy. FirstEnergy is also proceeding with the implementation of the recommendations that were to be completed subsequent to 2004 and will continue to periodically assess the FERC-ordered Reliability Study recommendations for forecasted 2009 system conditions, recognizing revised load forecasts and other changing system conditions which may impact the recommendations. Thus far, implementation of the recommendations has not required, nor is expected to require, substantial investment in new or material upgrades to existing equipment. The FERC or other applicable government agencies and reliability coordinators may, however, take a different view as to recommended enhancements or may recommend additional enhancements in the future as the result of adoption of mandatory reliability standards pursuant to the EPACT that could require additional material expenditures.

168



In addition to the above proceedings, FirstEnergy was named in a complaint filed in Michigan State Court by an individual who is not a customer of any FirstEnergy company. FirstEnergy's motion to dismiss the matter was denied on June 2, 2006. FirstEnergy has since filed an appeal, which is pending. A responsive pleading to this matter has been filed. Also, the complaint has been amended to include an additional party. No estimate of potential liability has been undertaken in this matter.

FirstEnergy is vigorously defending these actions, but cannot predict the outcome of any of these proceedings or whether any further regulatory proceedings or legal actions may be initiated against the Companies. In particular, if FirstEnergy or its subsidiaries were ultimately determined to have legal liability in connection with these proceedings, it could have a material adverse effect on FirstEnergy's or its subsidiaries' financial condition, results of operations and cash flows.

New Accounting Standards and Interpretations

FSP FIN 46(R)-6 - “Determining the Variability to Be Considered in Applying FASB interpretation No. 46(R)”

In April 2006, the FASB issued FSP FIN 46(R)-6 that addresses how a reporting enterprise should determine the variability to be considered in applying FASB interpretation No. 46 (revised December 2003). FirstEnergy adopted FIN 46(R) in the first quarter of 2004, consolidating VIE’s when FirstEnergy or one of its subsidiaries is determined to be the VIE’s primary beneficiary. The variability that is considered in applying interpretation 46(R) affects the determination of (a) whether the entity is a VIE; (b) which interests are variable interests in the entity; and (c) which party, if any, is the primary beneficiary of the VIE. This FSP states that the variability to be considered shall be based on an analysis of the design of the entity, involving two steps:

Step 1:
Analyze the nature of the risks in the entity
Step 2:
Determine the purpose(s) for which the entity was created and determine the variability the entity is designed to create and pass along to its interest holders.

After determining the variability to consider, the reporting enterprise can determine which interests are designed to absorb that variability. The guidance in this FSP is applied prospectively to all entities (including newly created entities) with which that enterprise first becomes involved and to all entities previously required to be analyzed under interpretation 46(R) when a reconsideration event has occurred after July 1, 2006. Penelec does not expect this Statement to have a material impact on its financial statements.

FIN 48 - “Accounting for Uncertainty in Income Taxes - an interpretation of FASB Statement No. 109.”

In June 2006, the FASB issued FIN 48 which clarifies the accounting for uncertainty in income taxes recognized in an enterprise’s financial statements in accordance with FASB Statement No. 109, “Accounting for Income Taxes.” This interpretation prescribes a recognition threshold and measurement attribute for the financial statement recognition and measurement of a tax position taken or expected to be taken on a tax return. This interpretation also provides guidance on derecognition, classification, interest, penalties, accounting in interim periods, disclosure and transition. The evaluation of a tax position in accordance with this interpretation will be a two-step process. The first step will determine if it is more likely than not that a tax position will be sustained upon examination and should therefore be recognized. The second step will measure a tax position that meets the more likely than not recognition threshold to determine the amount of benefit to recognize in the financial statements. This interpretation is effective for fiscal years beginning after December 15, 2006. Penelec is currently evaluating the impact of this Statement.

SUBSEQUENT EVENTS

Pennsylvania Law Change

On July 12, 2006, the Governor of Pennsylvania signed House Bill 859, which increases the net operating loss deduction allowed for the corporate net income tax from $2 million to $3 million, or the greater of 12.5% of taxable income. As a result, Penelec expects to recognize a net operating loss benefit of $2.2 million (net of federal tax benefit) in the third quarter of 2006.


169


ITEM 3. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

See “Management’s Discussion and Analysis of Results of Operation and Financial Condition - Market Risk Information” in Item 2 above.

ITEM 4. CONTROLS AND PROCEDURES

(a) EVALUATION OF DISCLOSURE CONTROLS AND PROCEDURES

The applicable registrant's chief executive officer and chief financial officer have reviewed and evaluated the registrant's disclosure controls and procedures. The term disclosure controls and procedures means controls and other procedures of a registrant that are designed to ensure that information required to be disclosed by the registrant in the reports that it files or submits under the Securities Exchange Act of 1934 (15 U.S.C. 78a et seq.) is recorded, processed, summarized and reported, within the time periods specified in the Securities and Exchange Commission's rules and forms. Disclosure controls and procedures include, without limitation, controls and procedures designed to ensure that information required to be disclosed by an issuer in the reports that it files or submits under that Act is accumulated and communicated to the registrant's management, including its principal executive and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure. Based on that evaluation, those officers have concluded that the applicable registrant's disclosure controls and procedures are effective and were designed to bring to their attention material information relating to the registrant and its consolidated subsidiaries by others within those entities.

(b) CHANGES IN INTERNAL CONTROLS

During the quarter ended June 30, 2006, there were no changes in the registrants' internal control over financial reporting that have materially affected, or are reasonably likely to materially affect, the registrants' internal control over financial reporting.

170


PART II. OTHER INFORMATION

ITEM 1. LEGAL PROCEEDINGS

Information required for Part II, Item 1 is incorporated by reference to the discussions in Notes 10 and 11 of the Consolidated Financial Statements in Part I, Item 1 of this Form 10-Q.
 
ITEM 1A. RISK FACTORS
 
                   See Item 1A RISK FACTORS in Part I of the Form 10-K for the year ended December 31, 2005 for a discussion of the risk factors of FirstEnergy and the subsidiary registrants. For the quarter ended June 30, 2006, there have been no material changes to these risk factors.

ITEM 2. UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS

(c) FirstEnergy

The table below includes information on a monthly basis regarding purchases made by FirstEnergy of its common stock.


   
Period
   
April 1-30,
   
May 1-31,
   
June 1-30,
   
Second
     
2006
   
2006
   
2006
   
Quarter
Total Number of Shares Purchased (a)
   
132,910
   
481,150
   
470,009
   
1,084,069
Average Price Paid per Share
 
$
49.82
 
$
52.26
 
$
53.10
 
$
52.33
Total Number of Shares Purchased
                       
As Part of Publicly Announced Plans
                       
or Programs (b)
   
-
   
-
   
-
   
-
Maximum Number (or Approximate Dollar
                       
Value) of Shares that May Yet Be
                       
Purchased Under the Plans or Programs
   
-
   
-
   
-
   
-
                         

(a)
Share amounts reflect purchases on the open market to satisfy FirstEnergy's obligations to deliver common stock under its Executive and Director Incentive Compensation Plan, Deferred Compensation Plan for Outside Directors, Executive Deferred Compensation Plan, Savings Plan and Stock Investment Plan. In addition, such amounts reflect shares tendered by employees to pay the exercise price or withholding taxes upon exercise of stock options granted under the Executive and Director Incentive Compensation Plan.
   
(b)
On June 20, 2006, FirstEnergy Corp. announced that its Board of Directors has authorized a share repurchase program for up to 12 million shares of common stock. At management’s discretion, shares may be acquired on the open market or through privately negotiated transactions, subject to market conditions and other factors. The Board’s authorization of the repurchase program does not require FirstEnergy to purchase any shares and the program may be terminated at any time.

ITEM 4. SUBMISSION OF MATTERS TO A VOTE OF SECURITY HOLDERS

(a)
The annual meeting of FirstEnergy shareholders was held on May 16, 2006.

(b)
At this meeting, the following persons were elected to FirstEnergy's Board of Directors for one-year terms:

 
Number of Votes
 
For
 
Withheld
 
 
 
 
Anthony J. Alexander
 
193,156,658
 
 
90,938,042
Dr. Carol A. Cartwright
 
164,744,513
 
 
119,350,187
William T. Cottle
 
183,961,100
 
 
100,133,600
Robert B. Heisler, Jr.
 
268,681,345
 
 
15,413,355
Russell W. Maier
 
186,309,666
   
97,785,034
George M. Smart
 
183,516,902
   
100,577,798
Wes M. Taylor
 
186,519,704
   
97,574,996
Jesse T. Williams, Sr.
 
185,540,843
 
 
98,553,857

The term of office for the following Directors continued after the shareholders meeting and expires in 2007: Paul T. Addison, Ernest J. Novak, Jr., Catherine A. Rein and Robert C. Savage. The following Directors retired from the Board effective May 16, 2006: Robert N. Pokelwaldt, Paul J. Powers and Dr. Patricia K. Woolf.

171



(c) (i) At this meeting, the appointment of PricewaterhouseCoopers LLP, an independent registered public accounting firm, as auditor for the year 2006 was ratified:

Number of Votes
For
 
Against
 
Abstentions
 
 
 
 
 
278,799,686
 
 
2,661,331
 
 
2,633,683

(ii) At this meeting, a shareholder proposal recommending that the Board of Directors adopt simple majority shareholder voting and make it applicable to the greatest number of governance issues practicable was approved (approval required a favorable vote of a majority of the votes cast):

Number of Votes
 
 
 
 
 
 
Broker
For
 
Against
 
Abstentions
 
Non-Votes
 
 
 
 
 
 
 
184,910,522
 
 
67,099,919
 
 
4,832,226
 
 
27,252,033

Based on this result, the Board of Directors will further review this proposal and consider
the appropriate steps to take in response.

(iii) At this meeting, a shareholder proposal urging the Board of Directors to seek shareholder approval of future severance agreements with senior executives that provide benefits in an amount exceeding 2.99 times the sum of the executives' base salary plus bonus was not approved (approval required a favorable vote of a majority of the votes cast):
 
Number of Votes
           
Broker
For
 
Against
 
Abstentions
 
Non-Votes
             
123,673,866
   
128,388,870
   
4,780,131
   
27,251,833

ITEM 6. EXHIBITS


Exhibit
Number
 
 
     
FirstEnergy
 
     
 
12
Fixed charge ratios
 
15
Letter from independent registered public accounting firm
 
31.1
Certification of chief executive officer, as adopted pursuant to Rule 13a-15(e)/15d-(e).
 
31.2
Certification of chief financial officer, as adopted pursuant to Rule 13a-15(e)/15d-(e).
 
32.1
Certification of chief executive officer and chief financial officer, pursuant to 18 U.S.C. Section 1350.
     
OE
 
     
 
12
Fixed charge ratios
 
15
Letter from independent registered public accounting firm
 
31.1
Certification of chief executive officer, as adopted pursuant to Rule 13a-15(e)/15d-(e).
 
31.2
Certification of chief financial officer, as adopted pursuant to Rule 13a-15(e)/15d-(e).
 
32.1
Certification of chief executive officer and chief financial officer, pursuant to 18 U.S.C. Section 1350.
   
Penn
 
 
15
Letter from independent registered public accounting firm
 
31.1
Certification of chief executive officer, as adopted pursuant to Rule 13a-15(e)/15d-(e).
 
31.2
Certification of chief financial officer, as adopted pursuant to Rule 13a-15(e)/15d-(e).
 
32.1
Certification of chief executive officer and chief financial officer, pursuant to 18 U.S.C. Section 1350.
     
CEI
 
     
 
31.1
Certification of chief executive officer, as adopted pursuant to Rule 13a-15(e)/15d-(e).
 
31.2
Certification of chief financial officer, as adopted pursuant to Rule 13a-15(e)/15d-(e).
 
32.1
Certification of chief executive officer and chief financial officer, pursuant to 18 U.S.C. Section 1350.

172



     
TE
 
     
 
31.1
Certification of chief executive officer, as adopted pursuant to Rule 13a-15(e)/15d-(e).
 
31.2
Certification of chief financial officer, as adopted pursuant to Rule 13a-15(e)/15d-(e).
 
32.1
Certification of chief executive officer and chief financial officer, pursuant to 18 U.S.C. Section 1350.
     
JCP&L
 
     
 
12
Fixed charge ratios
 
31.2
Certification of chief financial officer, as adopted pursuant to Rule 13a-15(e)/15d-(e).
 
31.3
Certification of chief executive officer, as adopted pursuant to Rule 13a-15(e)/15d-(e).
 
32.2
Certification of chief executive officer and chief financial officer, pursuant to 18 U.S.C. Section 1350.
     
Met-Ed
 
     
 
12
Fixed charge ratios
 
31.1
Certification of chief executive officer, as adopted pursuant to Rule 13a-15(e)/15d-(e).
 
31.2
Certification of chief financial officer, as adopted pursuant to Rule 13a-15(e)/15d-(e).
 
32.1
Certification of chief executive officer and chief financial officer, pursuant to 18 U.S.C. Section 1350.
     
Penelec
 
     
 
12
Fixed charge ratios
 
15
Letter from independent registered public accounting firm
 
31.1
Certification of chief executive officer, as adopted pursuant to Rule 13a-15(e)/15d-(e).
 
31.2
Certification of chief financial officer, as adopted pursuant to Rule 13a-15(e)/15d-(e).
 
32.1
Certification of chief executive officer and chief financial officer, pursuant to 18 U.S.C. Section 1350.
 
                   Pursuant to reporting requirements of respective financings, FirstEnergy, OE, JCP&L, Met-Ed and Penelec are required to file fixed charge ratios as an exhibit to this Form 10-Q. CEI, TE and Penn do not have similar financing reporting requirements and have not filed their respective fixed charge ratios.
 
                   Pursuant to paragraph (b)(4)(iii)(A) of Item 601 of Regulation S-K, neither FirstEnergy, OE, CEI, TE, Penn, JCP&L, Met-Ed nor Penelec have filed as an exhibit to this Form 10-Q any instrument with respect to long-term debt if the respective total amount of securities authorized thereunder does not exceed 10% of their respective total assets of FirstEnergy and its subsidiaries on a consolidated basis, or respectively, OE, CEI, TE, Penn, JCP&L, Met-Ed or Penelec but hereby agree to furnish to the Commission on request any such documents.


173


 
SIGNATURE

 
Pursuant to the requirements of the Securities Exchange Act of 1934, each Registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.


August 7, 2006





 
FIRSTENERGY CORP.
 
Registrant
   
 
OHIO EDISON COMPANY
 
Registrant
   
 
THE CLEVELAND ELECTRIC
 
ILLUMINATING COMPANY
 
Registrant
   
 
THE TOLEDO EDISON COMPANY
 
Registrant
   
 
PENNSYLVANIA POWER COMPANY
 
Registrant
   
 
JERSEY CENTRAL POWER & LIGHT COMPANY
 
Registrant
   
 
METROPOLITAN EDISON COMPANY
 
Registrant
   
 
PENNSYLVANIA ELECTRIC COMPANY
 
Registrant





 
/s/ Harvey L. Wagner
 
     Harvey L. Wagner
 
  Vice President, Controller
 
and Chief Accounting Officer


174